Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 23, 2002 FBO #0083
SOLICITATION NOTICE

41 -- 1 HAZARDOUS MATERIALS WALK-IN FREEZER DESIGNED WITH A BASE THAT IS AN INDEPENDENT LOAD SUPPORTING SYSTEM. MUST BE RATED FOR OUTDOOR ENVIRONMENT IN HOUSTON, TX.

Notice Date
2/21/2002
 
Notice Type
Solicitation Notice
 
Contracting Office
NASA/Lyndon B. Johnson Space Center, Houston Texas, 77058-3696, Mail Code: BH
 
ZIP Code
00000
 
Solicitation Number
BH13-78-02-47P
 
Response Due
2/28/2002
 
Archive Date
2/21/2003
 
Point of Contact
Karen D. Adams, Contract Specialist, Phone (281) 483-1863, Fax (281) 244-5337, Email karen.d.adams1@jsc.nasa.gov - Krystine O. Bui, Contracting Officer, Phone (281) 483-4186, Fax (281) 244-5331, Email krystine.o.bui1@jsc.nasa.gov
 
E-Mail Address
Email your questions to Karen D. Adams
(karen.d.adams1@jsc.nasa.gov)
 
Description
The Government intends to acquire a commercial item using FAR Part 12 and the Simplified Acquisition Procedures set forth in FAR Part 13. This notice is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, which is issued as a Request for Quotation (RFQ); quotes are being requested and a written solicitation will not be issued. Offerors are required to use the On-Line RFQ system to submit their quote. The On-line RFQ system is linked above or it may be accessed at http://procurement.nasa.gov/cgi-bin/EPS/bizops.cgi?gr=C&pin= . The information required by FAR Subpart 12.6 is included in the on-line RFQ. NASA/JSC plans to acquire one hazardous materials walk-in freezer is required that is accordance with the attached specificatios. The freezer must be designed with a base that is an independent load supporting system. The freezer must provide long-term temperature controlled storage of batteries. If freezer is not shipped as an integral pre-charged assembly (e.g., assembled on site from pre-fabricated panels), then manufacturer quote must include provisions for all necessary labor, equipment, tools, materials and certifications to assemble and charge freezer on site while following all applicable NASA Johnson Space Center site requirements. For integral assemblies, customer will remove freezer from shipping truck, set freezer upon available support (blocks, beams, or pad), and anchor per manufacturer specification. For both pre-fabricated and integral assemblies, customer will connect site utilities. (See attached specifications.) Questions regarding this acquisition must be submitted in writing (e-mail is preferred) no later than 02/26/02. It is the quoter's responsibility to monitor this site for the release of amendments (if any). Potential quoters will be responsible for downloading their own copy of this notice, the on-line RFQ and amendments (if any). An ombudsman has been appointed - See NASA Specific Note "B". Any referenced notes can be viewed at the following URL: http://genesis.gsfc.nasa.gov/nasanote.html .
 
Web Link
Click here for the latest information about this notice
(http://nais.msfc.nasa.gov/cgi-bin/EPS/bizops.cgi?gr=D&pin=73#100282)
 
Record
SN00029358-W 20020223/020221213304 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.