MODIFICATION
J -- PROVIDE DRAWINGS AND REPLACE THE BOILER AT BLDG. N223
- Notice Date
- 5/2/2002
- Notice Type
- Modification
- Contracting Office
- NASA/Ames Research Center, JA:M/S 241-1, Moffett Field, CA 94035-1000
- ZIP Code
- 94035-1000
- Solicitation Number
- RFO2-38090GLR
- Response Due
- 5/15/2002
- Archive Date
- 5/2/2003
- Point of Contact
- Gabriel Romero, Contract Specialist, Phone (650) 604-2183, Fax (650) 604-0912, Email gromero@mail.arc.nasa.gov - Gabriel Romero, Contract Specialist, Phone (650) 604-2183, Fax (650) 604-0912, Email gromero@mail.arc.nasa.gov
- E-Mail Address
-
Email your questions to Gabriel Romero
(gromero@mail.arc.nasa.gov)
- Description
- THIS NOTICE CONSTITUTES AMENDMENT NO. ONE (1) TO THE COMBINED Synopsis/RFO FOR PROVIDE DRAWINGS AND REPLACE THE BOILER AT BLDG. N223 SUPPLEMENTED WITH ADDITIONAL INFORMATION CONTAINED IN THIS NOTICE. Companies shall acknowledge all amendment(s) in their offer. This notice serves as the official amendment to the subject solicitation and a written amendment will not be issued. The purpose of this amendment is to answer questions and extend the bid due date. QUESTIONS AND ANSWERS: 1.In Section 3.1.1 of the PWS, it calls for a highly efficient boiler. Please clarify this. The boiler shall have efficiency ratings of higher than 90%. 2. Is the NASA standard gas train a requirement on this boiler? Yes, the NASA standard gas train is required 3. Are there any Boiler models that are not acceptable? Cleaver Brooks boilers shall not be used. 4. During the walkthrough, it was discussed that the government will check the existing Boiler internals and piping insulation for asbestos/lead. Is the government also going to handle all abatement? The Government will handle asbestos and lead abatement. 5. Boiler specs: Capacity, model #, make, size? MA-RITEM, RITE ENG. CO. Model# 300 Gas Fired, Hot Water, 300,000 BTU/Hr 6. Is there a need for increased/decreased capacity? No change on capacity. 7. Have there been any modifications to the boiler? The new boiler will need to interface with the existing FMCS. (Currently 4 monitoring points) 8. Can the burners be fan-assisted? A forced draft boiler is what has been specified. A mechanical draft can be added if it is required as a result of chimney effects. 9. Can the boiler be a fire tube boiler? No, the boiler shall be either water tube or flex tube. *As a function of the design/build, the Offerer shall determine if the existing high and low combustion air is sufficient of if additional is air is needed. The due date for receipt of offers is extended to May 15, 2002. NO CHANGES TO THE TERMS AND CONDITIONS OR ADDENDA CLAUSES. Documents related to this solicitation will be available over the Internet. These documents are in Microsoft Office 97 format and reside on a World Wide Web (WWW) server, which may be accessed using a WWW browser application. The Internet site, or URL, for the NASA/ARC Business Opportunities home page is http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=CL&pin=21
- Web Link
-
Click here for the latest information about this notice
(http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=21#100491)
- Record
- SN00070541-W 20020504/020502213333 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |