SOLICITATION NOTICE
C -- Architect and Engineering Services for Civil Engineering Work with Hydrographic and Topographic Survey Requirements
- Notice Date
- 5/6/2002
- Notice Type
- Solicitation Notice
- Contracting Office
- US Army Engineer District, Norfolk - Civil Works, 803 Front Street, Norfolk, VA 23510-1096
- ZIP Code
- 23510-1096
- Solicitation Number
- DACW65-02-R-0018
- Response Due
- 6/6/2002
- Archive Date
- 7/6/2002
- Point of Contact
- Susan Hurst, (757) 441-7747
- E-Mail Address
-
Email your questions to US Army Engineer District, Norfolk - Civil Works
(susan.i.hurst@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- NA 1. CONTRACT INFORMATION: A-E services are required for a variety of projects, primarily civil works in nature. An Indefinite Delivery (IDC) will be negotiated and awarded with a base period not to exceed one year and two option periods not to exceed on e year each. The amount of work in each contract period will not exceed $500,000.00. The option period may be exercised when the contract amount for the base period or preceding option period has been exhausted or nearly exhausted. The cumulative value of all task orders, including the base period and the two option periods, will not exceed $1,500,00.00.These services are procured in accordance with PL 92-582 (Brooks A/E Act) and FAR Part 36. This announcement is open to all businesses regardless of siz e. If a large business is selected for this contract, it must comply with FAR 52.219-9, regarding the requirement for a subcontracting plan on that part of the work it intends to subcontract. The subcontracting goals for the Norfolk District, which will be considered by the contracting officer, are that a minimum of 62% of a contractor?s intended subcontract amount be placed with a small business (SB), including small disadvantaged businesses (SDB), and 9% be placed with SDB. This procurement is classifi ed under SIC Code 8711, NAICS 54133. The plan is not required with this submission. The wages and benefits of service employees (see FAR 22, 10) performing under these contracts must be at least equal to those determined by the Department of Labor under the Service Contract Act. 2. PROJECT INFORMATION: The project consists of engineering, design, preparation of plans and specifications, Cost Estimates, reports and possible development of Long-Term Management Strategies (LTMS) for navigation project(s) within the jurisdiction of the Norfolk District. A-E services may include site investigation, topographic surveys, hydrographic surveys, and development of LTMS for Dredged Material Placement Areas, preparation of plans and specifications for construction of minor projects and prep aration of reports. 3. SELECTION CRITERIA: See Note 24 for general A-E selection process. The selection criteria are listed below in descending order of importance (first by major criterion and then by each sub-criterion). Criteria 1 through 5 are primary. Criteria 6 and 7 are secondary and will only be used as ?tie-breakers? among technically equal firms. a. Specialized experience and technical competence: (1) Demonstrated experience to handle a variety of civil engineering, hydrographic and topographic surveying work relating to maintenance and new work dredging of river and harbor projects. (2) Demonstrated experience in the application of the Dredged Material Research Program results in the design and implementation of dredging projects and long term disposal so lutions. (3) Must show the capacity of performing extensive hydrographic and topographic surveys and producing charts and design documents meeting Corps of Engineers criteria. (4) Demonstrated experience and capability for ocean surveying with automated hydrographic surveying system. The ocean surveying may require systems with ranges of 30,000 to 40,000 feet for horizontal and vertical positioning. (5) Demonstrated experience/capability for current and sediment studies in a riverrine/estuarine enviro nment. (6) Demonstrated experience and capability to sample dredge material, both grab and core samples from channels ranging in depth from 6 feet to 40 feet. These samples must be obtained with accurate horizontal locations and depths. Firms are requi red to identify and describe equipment to be used for automated hydrographic surveying and positioning and the vessel in which the survey and positioning equipment will be mounted. (7) Computer Resources ? firms must indicated in Block 10 of the SF 255 t he following items:.: (a) accessibility to and/or familiarity with the Construction Criteria Base (CCB) s ystem. This shall include as a minimum, the SPECSINTACT specification system, the MCACES estimating system; (b) demonstrated CADD capability with capacity to produce output files in ?.DXF? or ?.DWG? file format. b. Professional qualifications: (1) The design team must possess experienced, registered personnel (in-house) in CIVIL ENGINEERING AND LAND SURVEYING disciplines and experience personnel (in-house or by use of consultant) in ENVIRONMENTAL ENGINEER. (2) A Project Team Management Plan inclu ding team organization and proposed method of carrying out the work to meet specific individual task order requirements and schedules. c. Capability to accomplish the work in the required time. Firms must demonstrate ability of the design team to comple te the project as scheduled. d. Past performance on DOD and other contracts: (1) ACASS evaluations (superior performance evaluations on recently completed projects is advantageous); (2) Letters of evaluation/recognition by other clients; (3) Cost cont rol and estimating performance as a percentage deviation between the final estimate and low bid on similar TYPE and SIZE projects; (4) On-time delivery of designs for DOD and similar projects. e. Knowledge of the Locality: as described in Note 24. f. . Location of the firm in the general geographic area of the Norfolk District, Corps of Engineers. G. Volume of DOD Contract awards in the last 12 months. Equitable distribution of contracts among qualified A-E firms, including minority-owned firms, SB and SDB participation and firms that have not had prior DOD contracts will only be considered when used as a tie-breaker?. Considerations may include: (1) ACASS retrievals; (2) Current workload as listed in Block 9 of the SF 255; and (3) Equitable di stribution of work among A-E firms (including minority-owned firms, SB and SDB participation and firms that have not had prior DOD Contracts) will only be considered when used as a ?tie-breaker?.) 4. SUBMISSION REQUIREMENTS: See Note 24 for general submission requirements. All requirements of this announcement must be met for a firm to be considered for selection. Interested firms having the capabilities to perform this work must submit a sing le SF 255 (11/92 edition) for the design team and single copies of current SF 254 (11/92) for the prime firm and each consultant, to the above address not later than the close of business on the 30th day after the date of this announcement. For the purpos e of this notice, day number one is the day following the date of publication. If the 30th day is a Saturday, Sunday, or Federal Holiday, the deadline is the close of business of the next business day. The revised 11/92 edition of the SF255 (NSN 7450-01- 152-8074) & SF254 (NSN 7540-01-152-8073) is required. Forms may be obtained through GPO at (202)512-0132. The SF 255 must also include the following: a. Firms with more than one office (1) Block 4: distinguish, by discipline, between the number of pe rsonnel in the office to perform the work and the total number of personnel in the firm; (2) Block 7c: each key person?s office location; b. Block 3: prime firm?s ACASS # and distance (in terms of POV driving miles) from address of office to perform th e work and the Norfolk District. For ACASS information, call 503-326-3459; c. Block 7f: registrations must include the year, discipline and state in which registered; d. Block 8b: Include a descriptive project synopsis of major items of work; e. Bl ock 9. Indicate fee in terms of thousands of dollars, not percentage of work completed. f. Block 10. Describe owned or leased equipment that will be used to perform this contact. CADD capabilities, an organizational chart including all key elements o f the design team demonstrating the firm?s understanding of and ability to execute projects under the contract. Submittals by facsimile transmission will not be accepted and will be considered nonresponsive. Prior to the final selection, firms considered highly qualified to accomplish the work may be interviewed either by telephone or by formal presentation. Prospective contractors must be registered in the DOD Contractor Registration (CCR) database prior to award of a contract. Information on registration and annual confirmation requirements may be obtained by calling 1-888-227-2423, or via the Internet at http://www.ccr2000.gov Lack of registration in the CCR database will make an offeror ineligible for award. THIS IS NOT A REQUEST FOR PROPOSAL. SOLICITATION PACKAGES WILL NOT BE PROVIDED.
- Place of Performance
- Address: US Army Engineer District, Norfolk - Civil Works 803 Front Street, Norfolk VA
- Zip Code: 23510-1096
- Country: US
- Zip Code: 23510-1096
- Record
- SN00072250-W 20020508/020506213349 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |