Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 18, 2002 FBO #0167
SOLICITATION NOTICE

Z -- Addition/alteration of commissary facility at Fort Leonard Wood, MO, Solicitation Number F41689-02-R-0075. Solicitation Package should be available approximately 4 Jun 02.

Notice Date
5/16/2002
 
Notice Type
Solicitation Notice
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Specialized Contracting Squadron - DeCA Support, 2250 Foulois Street, Suite 3 Bldg 8400, Lackland AFB, TX, 78236-1007
 
ZIP Code
78236-1007
 
Solicitation Number
F41689-02-R-0075
 
Response Due
7/9/2002
 
Archive Date
7/24/2002
 
Point of Contact
Devindranath Gokool, Contracting Officer, Phone 210-671-8428, Fax 210-671-1196, - Albert Berlanga, Contracting Officer, Phone 210-671-1193, Fax 210-671-1196,
 
E-Mail Address
Gokool.Devindranath@randolph.af.mil, albert.berlanga@randolph.af.mil
 
Description
Contractor will be responsible for addition/alteration of the existing commissary and expansion of the parking lot. Phasing of the overall construction work will be required to allow for Grocery operations and sales to remain in full and complete operation during the duration of the contract. The work to be done includes but is not limited to the following: Extend the sales floor eastward through the current produce preparation, storage areas and deli then westward through the manager's office spaces, frozen food freezer, and into the warehouse. Sales area depth will be reduced to provide space to relocate all preparation and refrigeration storage spaces. Provide and installed new Defense Commissary Agency (DeCA) decor package through out the Sales Area, construct new administration offices by expanding into the existing warehouse, construct new sensitive storage room, damaged merchandise room, controlled temp. storage room, and meat/produce managers office in the existing warehouse; construct new admin. vestibule at front of commissary; upgrade the lighting in the sales area; complete replacement of the product refrigeration system equipment including the compressor racks, refrigeration piping, refrigeration monitoring control system (RMCS); some HVAC, plumbing and associated electrical work is also required. Time for project completion is approximately 540 calendar days. Offerors are responsible for Periodic Preventative Maintenance (PPM) 30 days after Notice to Proceed (NTP) and will continue 90 calendar after final acceptance of the project. This acquisition is unrestricted. The magnitude of construction is between $5,000,000.00 and $10,000,000.00. Bid guarantee is required. Estimated closing date for offers is on or about 9 July 2002. This project will be a Performance Price Tradeoff (PPT) solicitation. Proposals will be evaluated on past performance and price, with past performance being more important than price. All responsible sources meeting the criteria set forth in the RFP may submit an offer, which will be considered by the Government. Telephone request for this proposal will not be honored. Written request must cite RFP F41689-02-R-0075. Requesters should provide full address, Point of Contact, and telephone number. Requesters should also furnish the 9 digit zip code. Award of this project is subject to the availability of funds. This is not a Commercial Item as defined in FAR PART 12. Only the specifications and drawings will be available by mail on CD ROM, all other sections of the solicitation will be posted on the FedBizOpps, via the internet.
 
Record
SN00078245-W 20020518/020516213144 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.