Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 30, 2002 FBO #0179
SOLICITATION NOTICE

Y -- Y--Construction of Rehab Power Plant HVAC System, Fort Randall Dam, Pickstown, South Dakota.

Notice Date
5/28/2002
 
Notice Type
Solicitation Notice
 
Contracting Office
US Army Corps of Engineer - Omaha District, 106 S. 15th Street, Omaha, NE 68102-1618
 
ZIP Code
68102-1618
 
Solicitation Number
DACW45-02-B-0019
 
Response Due
6/27/2002
 
Archive Date
7/27/2002
 
Point of Contact
Diana Vanderzanden, 402-221-4044
 
E-Mail Address
Email your questions to US Army Corps of Engineer - Omaha District
(diana.l.vanderzanden@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
NA On or about 28 May 2002, this office will issue Invitation for Bids for the construction of Rehab Power Plant HVAC System, Fort Randall Dam, Pickstown, SD. Bids will be opened on or about 27 June 2002. This Solicitation Is Unrestricted And Open To Both L arge And Small Business Participation. Contractors interested in inspecting the site of the proposed work should contact Norm Ronfeldt or Ron Gall, US Army Corps of Engineers, Fort Randall Project, 605-487-7845 ext. 3003 or ext. 3004 respectively. Telephon e calls regarding Small Business matters should be made to: 402-221-4110. Telephone calls on contents of drawings and specifications should be made to the Project Manager, Richard Lynch at (402) 221 - 4171 or Marylee Stobbe in Specification Section at: (4 02) 221-4411. Telephone calls regarding Contractual questions should be made to Diana L. Vanderzanden, the Contract Specialist at (402) 221-4044. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See registratio n. The work will include the following: (Approx. quantities) The work in this contract involves the removal of oil-bath air filters and replacement with new system, removal and replacement of cooling coils, removal of pneumatic controls and replacement wi th electronic controls, replacement of miscellaneous fittings and piping. The estimated construction cost of this project is between $250,000 and $500,000. Contractor's Quality Control will be a requirement in this contract. Large business concerns submitt ing bids for services exceeding $500,000 or for construction exceeding $1,000,000, shall comply with Federal Acquisition Regulation 52.219-9 regarding the requirement for a subcontracting plan. The U.S. Army Corps of Engineers considers the following goal s reasonable and achievable for fiscal year 2002: (a) Small Business: 61.4% of planned subcontracting dollars. (b) Small Disadvantaged Business: 9.1% of planned subcontracting dollars. * (c) Women Owned Small Business: 5.0% of planned subcontracting dollar s. * (d) Severely Disabled Veterans 3.0% of planned subcontracting dollars.* (e) Hubzones 2.5% of planned subcontracting dollars.* *- Small business concerns owned and controlled by. The Contractor will be required to commence work within 10 days after no tice to proceed and complete the work 120 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. The plans and specifications are available on Compact Disk (CD-ROM) and will be provided free of charge. It has been determined that the number of Compact Disks be limited to one (1) per firm. Plans and Specifications will not be provided in a printed hard copy format. Contractors may view and/or download this project from the Internet at the following Internet address: http://ebs.nwo.usace.army.mil/ Ordering of CD-ROM shall be made through the Internet address above. To register on the Omaha District website, go to the Solicitation Registration section of the synopsis and click on the link for Registering. Please include the following information: 1) Name of Firm; 2)Point of Contact; 3)Mailing Address; 4)Street Address for Parcel Delivery Service; 5)Telephone and Fax Phone Numbers with Area Code (FAX numbers are mandatory to ensure the receipt of any amendments that may be faxed. Amendments will be available through the Internet address indicated above. Contractors, Subcontractors and suppliers shall be responsible to check the internet address for amendments.); 6) Level of Participation (General Contractor, Subcontractor, Supplier or Plan Room); and 7) Large Business, Small Business or Small Disadvantaged Business. If any of the information changes during the advertisement period, go into the web site and edit your input for registration for plans and specifications. Failure to provide the above inform ation and any changes may cause a delay in receiving CD-ROM and amendments. Questions regarding the ordering of the same should be made to: Diana L. Vanderzanden at 402-221-4044 or email: diana.l.vanderzanden@usace.army.mil. Commander, U.S. Army Engineer District, Omaha, ATTENTION: CENWO-CT-C,106 South 15th Street, Omaha, NE 68102-1618
 
Place of Performance
Address: Fort Randall Power Plant P.O. Box 199 Pickstown SD
Zip Code: 57367
Country: US
 
Record
SN00084161-W 20020530/020528213406 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.