Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 03, 2002 FBO #0213
MODIFICATION

16 -- Thin-Pack Parachute Ensembles for E-2C Aircraft

Notice Date
7/1/2002
 
Notice Type
Modification
 
Contracting Office
Department of the Navy, Naval Air Systems Command, Naval Air Warfare Center Weapons Division Dept.1, Commander, NAWCWD, Code 210000D, 1 Administration Circle, China Lake, CA, 93555-6100
 
ZIP Code
93555-6100
 
Solicitation Number
N68936-00-G-0001-0013
 
Response Due
7/22/2002
 
Archive Date
8/6/2002
 
Point of Contact
William Monckton, Contract Specialist, Phone (760) 939-8234, Fax (760) 939-7510, - Maureena Mueller, Procuring Contracting Officer, Phone (760) 939-8176, Fax (760) 939-7510,
 
E-Mail Address
moncktonwt@navair.navy.mil, muellermr@navair.navy.mil
 
Description
This modification increases the maximum number of E-2C Parachute Survival Ensembles and components to be order under Order 00013 of Thin-Pack Parachute Basic Ordering Agreement N68936-00-G-001 from by 5 from 95 to up to 100 E-2C parachute systems. See synopsis posted June 5, 2002 for details. Order 0013 is a continuation of the production line started under Order 0005 under this BOA. Deliveries to start in November 2002. Contractor shall deliver 8 systems per month until completion of order. This requirement is being negotiated on a sole source basis with SEI as the Thin-Pack drawing packages have proprietary markings making design information unreleaseable. SEI is the only source currently producing the parachute survival ensembles incorporating the Thin-Pack/Lightweight Environmentally Sealed Parachute Assembly (LESPA) technology. The "Thin-Pack" lightweight systems have a 5 1/2 year repack cycle (versus 240-670 days) with a goal of 27.5 years total life (versus 10 years). No other source has SEI's unique knowledge and expertise in the Thin-Pack technology for E-2C. The production of the supplies listed requires a substantial initial investment or an extended period of preparation for manufacture. Proposed order type: Firm Fixed Price. FOB Origin. The PSE are to be delivered to Northrop-Grumman, Melbourne, FL for incorporation into the E-2C Aircraft coming off Grumman's production line. Packing, marking and shipping requirements will be covered by separate order under the BOA. All responsible sources may submit a bid, proposal or quotation, which will be considered by the Agency. Interested parties other than SEI must respond in writing (via mail, email, or fax) demonstrating the offeror's experience and capabilities in parachutes incorporating the Thin-Pack technology and the level of maintenance support required by the Government. Address: Commander Code 210000D, NAWCWD, Attn: William T. Monckton, 1 Administration Circle, Bldg. 20259, China Lake, CA 93555-61000. RFP is available at https://contracts.nawcwd.navy.mil/rfp-nawc.htm. Anticipate release date of RFP: July 1, 2002. Estimate closing date: July 22, 2002. Anticipated award date: July 29, 2002. Parties interested in subcontracting opportunities need to contact Mr. Jaime Richardson, SEI's Contract Manager at (828) 277-1979 x222 or richardson@sei.simula.com. See Notes 22 and 26.
 
Place of Performance
Address: SEI, 537 Sweeten Creek Industrial Park, Asheville NC,
Zip Code: 28803
Country: USA
 
Record
SN00103548-W 20020703/020701213654 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.