Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 14, 2002 FBO #0224
MODIFICATION

23 -- Design and Construction of Mobile Laboratory

Notice Date
7/12/2002
 
Notice Type
Modification
 
Contracting Office
Environmental Protection Agency, Usepa R8 T&Ms Grants Audits & Procurement Program, 999 18th St Ste 300, Denver, CO 80202
 
ZIP Code
80202
 
Solicitation Number
RFQ-CO-02-00018
 
Response Due
7/19/2002
 
Description
NAICS Code: 336111 Request for Quotations on Design and Construction of a Mobile Laboratory The U.S. Environmental Protection Agency is requesting quotations for the design and construction of a mobile laboratory. The specifications for the vehicle are listed below. SPECIFICATIONS FOR MOBILE LABORATORY The body of this vehicle has limitations which cannot be adjusted. The main limitation of this vehicle is the dimensions. The Vehicle will be stored in a garage with a low roof. If the vehicle is 25' long, the height of the vehicle must be lower than 10' 8" after 21'. Air conditioner units must be located centrally on the body to meet this specification. GENERAL SPECIFICATIONS Chassis (Based on Ford Econoline E550 Super-Duty RV Cutaway) 1. 25' maximum vehicle length 2. 10' 8" maximum vehicle height not including centrally mounted A/C units 3. Automatic transmission with electronic overdrive 4. Gasoline engine V-10 EFI, 6.8 L 5. Heavy duty alternator system, 130 AMP 6. Super cooling radiator system 7. All season radial tires, load range F - dual rear wheels 8. Heavy duty front and rear suspension and gas shocks 9. Power brakes - ABS all wheels. Foot-operated, transmission mounted parking brake 10. Power steering 11. Dash air conditioning/heater and defroster 12. Cruise control 13. Intermittent dual speed windshield wipers 14. 55 gallon fuel tank 15. Manual door locks 16. Manual windows 17. AM/FM cassette player system 18. Rear bumper heavy duty with towing package 19. Hydraulic stabilizing/leveling jacks 20. Two 12 volt ports at dash 21. Anti-theft alarm 22. Standard trim package 23. Vinyl seat covers 24. High back bucket seats or bench seating 25. Rubberized flooring 26. Driver and passenger air bags 27. Dual electric horns 28. Full-size spare and tools 29. Exterior manual rear view mirrors Body Configuration 30. Steel metal frame construction 31. Aluminum exterior skin panels 32. Double panel insulation R-19 33. 32 inch passenger side entry door, located behind the rear axle 34. Side fold up stairs 35. Rear cargo door, 52" inches wide 36. Dark tinted safety windows 37. Aluminum step ladder at rear of the bus - roof access 38. Roof platform including tie downs for equipment 39. Storage space - exterior with locking door mechanisms 40. Full length passenger side awning 41. Gas cylinder rack, slide-out design, fit 2 @ 9" or 3 @ 7"cylinders 42. Standard trim package 43. 3rd center mounted brake light Air and Ventilation System 44. Two roof mounted air conditioner(s) (13,500 BTU) 45. Heating combination with air conditioning unit 46. Two roof vent fans with epoxy coated high heat blower unit to resist temperatures up to 600 F degrees for GCMS, with diverter valve and mounts for exhaust tubes 47. Two fresh air inlets with HEPA filters 48. Vent with blower for fume hood, hood not to be supplied by vendor Interior finishing 49. Hard separation of driving cab and laboratory, no cab to lab access 50. Heavy duty flooring with anti-skid vinyl flooring - chemical resistant and seamless 51. Walls and ceiling finished with heavy duty vinyl 52. Two floor drains connected to grey water tank 53. Cabinets lightweight metal and epoxy coated - electrodeposition process 54. Counter tops lightweight and chemical resistant 55. Positive latch 1/4 turn hardware on all drawers and doors, flush pulls 56. Sectional/removable counter tops creating continuous counter on 3 walls (see floor plan) 57. Sink with hot/cold water and hand-held drench shower (12 VDC) 58. Overhead storage compartment over driver's cab 59. Aircraft style tie downs for counter 60. Aircraft style tie downs for floor 61. Wall mounted cylinder storage unit 62. Rear located restroom with toilet, exhaust and light Electrical System 63. Gasoline-powered generators, 2 @ 7.0 kW air-cooled with electronic governors, remote start/stop on control panel. Operated from vehicle's 55 gallon fuel tank 64. Control panel for monitoring and controlling AC power, various DC circuits, battery and water tank status. Provision to select operation from one or both sources. Automatic switch over from generator to shorepower. Continuous steady voltage supply 65. Complete 120 volt system thought the vehicle, including GFI protected power outlets 66. Heavy duty shore cord - 50 ft 67. Auxiliary batteries 68. Automatic battery charger, dual-mode, with dual-charging circuits to maintain vehicle and auxiliary batteries 69. Two phone jack ports 70. Two weather proof exterior duplex power outlets AC, 120 VAC/50 amp 71. Wiring and antenna for cellular phone 72. Back up alarm system 73. Rear view camera system 74. Auto reset breaker system 75. All independent circuits protected by 20 AMP breaker Lighting System 76. 120 VAC double tube fluorescent lights with main switch 77. Step entry door lights - door activated with manual switch off 78. Two spot lights mounted at top rear corner of the unit Other equipment 79. Smoke detector 80. Carbon monoxide detector 81. ABC fire extinguisher 82. First aid kit 83. Reflector kit 84. Triangle kit Please include with your quote; Suggested additions or modifications, Warranty information on chassis, body, power train, and interior conversions/up-fitting (Any warranties/guarantees on this vehicle will not become effective until the vehicle has been accepted by the EPA project officer. The final invoice will not be issued to the EPA Finance Office until the vehicle has been inspected and accepted by the EPA project officer. A copy of the warranty shall be included in the quotation.), along with delivery schedules and FOB information. Quotation shall include local (Denver metro area) affiliates for service and maintenance of the vehicle and name and address of vendor who will perform any and all warrantied work. Quotation shall also include schedule of time required to complete the construction of the vehicle. Quotations meeting all technical requirements will be evaluated by price. The following clauses are incorporated by reference: 52.212-3, Offeror Representations and Certifications Commercial Items and 252.212-7000, Offeror Representations and Certifications Commercial Items with its offer, (xii) Clause 52.212-4, Contract Terms and Conditions_Commercial Items, is hereby incorporated by reference, (xiii) Clause 52-212-5 (Deviation) Contract Terms and conditions Required to Implement Statutes or Executive Orders_Commercial Items, 52-222-3 Convict Labor, 52-233-3 Protest After Award, 52-232-33 Payment by Electronics Funds Transfer_Central Contractor Registration, 252.212-7001 (Deviation) Contract Terms and Conditions Required to Implement Statues or Executive Orders Applicable to Defense Registration, 52-52.252-2 Cluases Incorporated by Reference, 52-252-6 Authorized Deviation in Clauses, 252-204-7003 Control of Government Personnel Work Product, 252-204-7004 Required Central Contractor Registration, 52-253-2 Computer GeneratedForms, 52-211-17, Delivery of Excess Quantities, 52-225-1 Buy American Act-Balance of Payments Program - Supplies 52-222-26 Equal Opportunity, 52.222-35 Affirmative Action for Disabled Veterans and Veterns of the Vietnam Era, 52-222-36 Affirmative Action for Workers withDisabilities, 52-222-37 Employment Reports on Disabled Veterans and Veternas of the Vietnam Era, 52-222-21 Prohibition of Segregated Facilities, 52-222-22 Previous Contracts and compliance reports hereby incorporated by reference. This solicitation is being conducted under Simplified Acquisition Procedures (SAP) FAR Part 13. Drawings are available. Please send fax # and email address to Maureen Martin @ martin.maureen@epa.gov or (303)312-7089. Submit questions in writing only (no questions will be answered by phone) to Maureen Martin (martin.maureen@epa.gov) Questions must be received no later than 3 working days before the date quotations are requested to be received by. Please submit quotations by July 19, 2002.
 
Record
SN00115636-W 20020714/020712213710 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.