Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 26, 2002 FBO #0236
SOLICITATION NOTICE

Y -- Other Work Package - Fort Bragg, North Carolina

Notice Date
7/24/2002
 
Notice Type
Solicitation Notice
 
Contracting Office
US Army Corps of Engineers, Savannah - Military Works, P.O. Box 889, Savannah, GA 31402-0889
 
ZIP Code
31402-0889
 
Solicitation Number
DACA21-02-B-0024
 
Response Due
9/12/2002
 
Point of Contact
Elaine Radcliffe, (912) 652-5416
 
E-Mail Address
Email your questions to US Army Corps of Engineers, Savannah - Military Works
(elaine.p.radcliffe@sas02.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
NA NOTE: Any prospective bidder/offeror interested in obtaining plans and specifications for this solicitation must register on our website at https://ebs.sas.usace.army.mil/. Contractor will only be able to view or download this solicitation from the Inter net. Paper copies and CD?s of this solicitation will not be available. Description of Work: This solicitation will consist of three schedules. Offerors may bid on any or all schedules. (1) Schedule I: Upgrade Sludge Holding Beds WWTP (Complete) (FW-0 049-1). This project will construct a pre-engineered steel roof over a 70 by 100 foot area of the Fort Bragg waste water treatment plant sludge drying beds. Storm drain pipe from downspounts to existing storm sewer will be constructed using directional b oring. The project will include enlarging the existing concrete footings and push walls and placing a new concrete floor; repair or upgrade of the existing sanitary sewer drainage; new interior and exterior lighting; relocation of existing electric lines; and seeding and mulching disturbed areas for erosion control. Depending on soil tests, the project may include disposal of contaminated soil. The estimated cost for this schedule is between $250,000 and $500,000. (2) Schedule II: Construct Company HQ Bu ilding D-3713. Construct a 4,400 SF administration facility and POV parking lot. The admin facility will be constructed using wood framing with brick veneer. Supporting utilities (outside 5 ft line) will include electrical/power, communications, and wat er distribution systems. It will also include storm drainage, erosion control, and sanitary sewer. The estimated costs of this schedule is between $250,000 and $500,000. (3) Schedule III: Construct Addition to Oxygen Building O-1900. Construct breathing equipment room addition to Building O-1900 in SOTF compound. The estimated cost of the project is between $250,000 and $500,000. Network Analysis will be required. This solicitation is issued on an unrestricted basis pursuant to the Business Opportunit y Development Reform Act of 1988. This solicitation will available on or about August 12, 2002. Notification of amendments will be through use of the Internet. No additional media (CD-ROM, floppy disks, faxes, etc) will be provided. It is the contracto r?s responsibility to check the Internet address provided above as necessary for any posted changes to this solicitation and all amendments. For additional information or assistance, you may contact Nora Louise Jarrell, Contract Specialist, 912-652-5705.
 
Record
SN00124536-W 20020726/020724213625 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.