SOLICITATION NOTICE
Y -- Replace HVAC System, Bldg 64, VAPAHCS, Livermore Division
- Notice Date
- 8/16/2002
- Notice Type
- Solicitation Notice
- Contracting Office
- Attn: Department of Veterans Affairs Palo Alto Health Care System, 3801 Miranda Avenue, Bldg. 6, Rm C-140, Palo Alto, California 94304
- ZIP Code
- 94304
- Solicitation Number
- 261-0262-02
- Response Due
- 9/20/2002
- Point of Contact
- Point of Contact - William N. Hollingsworth, Contracting Officer, (650) 849-0387, Contracting Officer - William N. Hollingsworth, Contracting Officer, (650) 849-0387
- E-Mail Address
-
Email your questions to William N. Hollingsworth
(william.hollingsworth@med.va.gov)
- Description
- A. Contractor service to provide all labor and materials, transportation and supervision neccesary to complete Project No. 640-336, Replace HVAC System, Bldg. # 64 at the VA Palo Alto Health Care System in Livermore, CA. B. Visits to the site by Bidders may be made only by appointments with Health Care System Contracting Officer's Technical Representative (COTR). Contact either Wilson Bunoan at 650-493-5000 Ext 36403 or Gary Geisenhofer at 650-493-5000 Ext 36158. C. Unless otherwise noted, testing of materials is the responsibility of the contractor. All testing is to be performed by a qualified, registered, testing laboratory selected by the contractor. The contractor shall notify the Contracting Officer not less than 3-working days prior to testing of specimens or field inspections, such that, if elected, a Government representative can be present to observe the testing. STATEMENT OF BID ITEM: A. Replace HVAC system, Building No. 64, per plans & specifications. Livermore, Ca. NOTE: Alternate Bid shall provide for - a. Reuse existing duct risers from crawl space to First floor, including distribution ductwork (diffusers/registers). b. Reuse existing ductwork (from main kitchen to roof, around large existing kitchen hood). Existing diffusers to be replaced. CONSTRUCTION PHASING: (Work includes demolition and Removal) A. Phase 1: Installation of chillers; cooling towers; building automation system (BAS); underground piping from Building No.64 to Building ?C?; Interconnecting piping & controls @ Building ?C?; modification & integration of existing ?Johnson Controls? @ Building ?C? to new building automation system, and HVAC work on roof of Bldg. # 64. (Maximum construction duration ? 20 Weeks) B. Phase 2: Second Floor: Kitchen area, including adjacent dishwashing area, storage rooms, dietetic offices, elevator equipment room, and related work on roof. (Maximum construction duration ? 5 weeks) C. Phase 3: Second floor, Fitness center, VSO office, corridor, toilets, Cafeteria, including dining areas, store, food service patio and related work on roof. (Maximum construction duration ? 4 Weeks) D. Phase 4: First floor, Library, Credit Union, Men's/Women's locker rooms, Corridor, Office, storage, and adjoining offices and facilities. (Maximum construction duration ? 4 Weeks) E. Phase 5: First floor Audio logy rooms, Prosthetics and storage rooms, Telephone room, and related work on roof and crawl space. (Maximum construction duration ? 4 Weeks) F. Phase 6: First floor, Recreation, including Kitchen, Office/Storage, Chapel, Adjacent rooms and related work on roof and crawl space. (Maximum construction duration ? 6 Weeks) NOTE: Alternate Bid shall be provided by the contractor to perform the work of Phase 2 to Phase 6 at night (9:00 PM to 5:30 AM).
- Web Link
-
Draft RFP 261-0262-02
(http://www.bos.oamm.va.gov/solicitation?number=261-0262-02)
- Record
- SN00142625-W 20020818/020816213406 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)