SOLICITATION NOTICE
99 -- Dumpster service
- Notice Date
- 8/23/2002
- Notice Type
- Solicitation Notice
- Contracting Office
- Attn: Department of Veterans Affairs Connecticut Health Care System, Contracting Officer, (90C), 950 Campbell Avenue, Bldg. 11, West Haven, Connecticut 06516
- ZIP Code
- 06516
- Solicitation Number
- 689-12-3
- Response Due
- 8/27/2002
- Point of Contact
- Contracting Officer - Mark Reveaux, Contract Specialist, (203) 937-4732
- E-Mail Address
-
Email your questions to Mark Reveaux
(mark.reveaux@med.va.gov)
- Description
- Waste hauler to furnish dumpsters for the removal of 14000-square feet of modular trailers, brush, concrete piers, bituminous concrete walk and scrap steel trailer frames. Delivery and pickup will be prompt. Arrangements will be made for drop-off and pick-up every day during the demolition process. For any technical questions, call Deane Bruce at 860-667-6829. Require your quotation sheet with all pricing filled in by 8/27/02, Faxed to Mark Reveaux at 203-937-4994. If you need to speak with my, I can be reached at 203-937-4732. Basis of pricing. The Government will pay based on the size of dumpster, product separation into dumpsters and tipping fee. Concrete piers are roughly 7-foot diameter by 7-foot long. There are 110-piers. Cost per dumpster = $ Cost for pickup = $ Cost for tipping per ton = $ Stipulate size provided = Approximate how many are needed = Steel trailer frames approximated to be 10-tons and cut up Cost per dumpster = $ Cost for pickup = $ Cost for tipping per ton = $ Stipulate size provided = Approximate how many are needed = Mixed waste removal of building products crushed volume approximated to be 1800-cubic yards. 100-cubic yard trailers are preferred. Also, (4) 30-cubic yard dumpsters needed for final waste cleanup. The building materials are wood truss, wood stud and drywall, wood & carpet floors, hung acoustical lay-in ceiling, solid wood doors, rubber roof on wood deck, T1-11 plywood siding. Also medium size landscaping bushes. Cost per dumpster = $ Cost for pickup = $ Cost for tipping per ton = $ Stipulate size provided = Approximate how many are needed =
- Web Link
-
RFQ 689-12-3
(http://www.bos.oamm.va.gov/solicitation?number=689-12-3)
- Record
- SN00148750-W 20020825/020823213405 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |