Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 13, 2002 FBO #0285
SOLICITATION NOTICE

70 -- COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS)

Notice Date
9/11/2002
 
Notice Type
Solicitation Notice
 
Contracting Office
3610 Collins Ferry Road (MS-002) P.O. Box 880 Morgantown, WV 26507-0880
 
ZIP Code
26507-0880
 
Solicitation Number
DE-RQ26-02NT20950
 
Point of Contact
Robert Mohn, Contracting Officer, 412-386-4963, mohn@netl.doe.gov
 
Small Business Set-Aside
N/A
 
Description
SUBJECT: COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 13, Simplified Acquisitions, as supplemented with additional information included in this notice. THIS ANNOUNCEMENT CONSTITUTES THE ONLY SOLICITATION; PROPOSALS ARE BEING REQUESTED AND A WRITTED SOLICITATION WILL NOT BE ISSUED. Responses shall reference :Request for Quotations? No. DE-RQ26-02NT20950. This acquisition is being set aside for small business, small disadvantaged business, hubzone, or 8(a) business. The U.S. Department of Energy, National Energy Technology Laboratory (NETL), Pittsburgh, PA intends to purchase the following: A. Scope Of Work This statement of work (SOW) is for a Computerized Maintenance Management System (CMMS) software package that is intended to replace the current CMMS software for the National Energy Technology Laboratory (NETL). For the purposes of this SOW, NETL is comprised of NETL related sites and facilities. B. Requirement Narrative This SOW is for only a CMMS product component. However, additional consideration will be given to product suites that have the capability to integrate add-on component elements within the suite, such as: Managing vehicle fleets, inventory, assets, safety, and projects. Further consideration will be given to those suites that require no customization to integrate these elements with the base CMMS. Identify the proposed CMMS software vendor customer base to include federal government agencies and commercial entities to identify the degree to which this software is utilized relating to its breadth, scope and complexity. Provide brief timeline of the proposed software to represent the level of product maturity. Additionally, provide a brief description of the company history as it relates to the proposed product. A Work Order component shall provide the ability to identify, describe, and classify problems while initiating work requests. Work requests need to be generated for any type of work required including service, emergency repairs, After-the-Fact, project work, Preventive Maintenance, etc. Workflow processes should have the ability to be assigned and routed for approval electronically and notifications sent via e-mail. Once a work request has been generated, the work order component shall provide planned work, a review capability, and duplicate work request detection. Engineering change notice control may be applied during the work planning process. Equipment data may also be analyzed prior to work package development. When the review is complete, work package development is executed. Provide the ability to perform approval routing in order to review estimated costs. Work order scheduling functions may also be performed from the work order component or may be imported from an integrated scheduling system. When the work is complete, provide the ability to compare estimated and actual costs; identify and analyze repair information along with lessons learned; update costs and post all related labor and material information; and archive historical equipment repair information. The proposed Preventive Maintenance suite shall provide the ability to develop work packages and establish approval routing for work planners. A list of equipment to be worked on or inspected shall be defined. The system shall establish preventive maintenance performance frequencies including; seasonal; specific calendar dates; high/low performance values; consideration for outages and plant down days and weekends and other frequencies defined by the maintenance management organization. Multiple preventive maintenance performance triggers shall also be defined. The preventive maintenance software module shall enable the maintenance organization to fine tune preventive maintenance tasks by analyzing task performance. The system shall also provide extensive forecasting information including dates needed, labor requirements, material, tools, etc. The CMMS software shall provide the ability to quickly match the critical workforce assets for the required work on the critical equipment and/or location assets. A scheduler component shall provide planners the ability to determine the current work order backlog and upcoming preventive/predictive maintenance routines. The system shall also provide the ability to print schedules and review schedule compliance for completed work. For all implementation or migration consulting services, vendor shall provide individual(s) with a full knowledge of the product, infrastructure requirements, and database migration. The individual(s) shall have experience commensurate with the scope and complexity associated with a migration at a DOE national laboratory. C. General CMMS Requirements Unlimited User site license for NETL related sites and facilities Electronic entry of work requests by customer from Internet/Intranet Electronic query of work requests/work orders by customers from Internet/Intranet Electronic approve/reject work requests by DOE Work Authorization Managers System/component link for assets/equipment with maintenance cost association Ability to add fields to database Preventive/Predictive maintenance capabilities Attach any electronic file including drawings, procedural text, spreadsheet data collection and templates to application documents Work order scheduling with charts Connectivity-TCP-IP (LAN and WAN) Use of an Oracle Database Role based access providing end users access to only authorized information Ability to save files in multiple formats Provide graph, e-mail, print, and export mechanismsD. Requirement Details D. Requirement Details Web Access Provide featured set of functions to authorized users with access to a web browser: Log work requests via Internet browsers Query on select work requests and work orders List open and closed work orders Check the status of work requests and work orders Query for work orders and display current status Administration, Security, and Work Flow Provide administrative tool suite to manage system authentication, role based access consisting of form level and field level access Provide custom configuration of the business process workflow for a variety of document types throughout the system User defined approval routing levels and e-signature requirements: Provide trace-ability of the routing levels Establish and manage multi-level, multi-signature approval routes for a variety of documents within the system Capability to Modify User Interface Customization of software forms and application, while maintaining the baseline software package Add user-defined fields to any form Add existing fields to forms Move, rename, resize and change tab order for any field on a form Change a database column validation and add error message Make non-required fields required Attachments Attach any electronic file type to any record within the database View and manipulate attached document Print appropriate documents with related database documents (i.e. work orders with procedure text documents, MSDS and drawings) Employee management component capabilities: Current and historical employment information Multi-trade / skill / qualifications definition Work force availability calendar for scheduling Time card and attendance information Day / week / month time sheet generation Pre-load time sheets from scheduling function Time card approval routing Work force training curriculum and participation Certification renewal frequency notification Accident history OSHA accident / body part reporting codes Adding overhead percentage charges to labor rates Multiple trade/craft, skill level and charge rates Detailed employment history records Personnel management time reporting capabilities: Multiple time reporting methods including clerk, individual and clock time entry windows Overtime, differential pay and non-productive code for Time card reporting User defined timecard approval routing On-line time sheet reports for operations and managerial personnel Timecard recording for payroll department User defined call-in overtime management window Detailed call-in overtime history records by employee identification number Personnel management training capabilities: Definition and tracking of all certification and training requirements by trade/craft Complete training event history information by employee identification number Database of qualified training providers On-line view of personnel requiring re-certification/training Accident history profiles: Complete accident history information OSHA illness type codes Accident reporting capabilities Equipment component capabilities: General, asset and user defined boilerplate data pages Asset cost and location information Equipment specification cross-reference Bills of Material cross-reference Procedure text cross-reference Equipment availability calendars Equipment safety cross-reference Access to work orders and PM/PDM's Equipment service agreement contracts Operator log book Equipment relocation Life cycle equipment location tracking Scrap equipment tracking Equipment maintenance history information Warranty management Downtime and equipment failure statistical information Multiple account, equipment, and part tree structure Graphical equipment material and labor cost history Mean-time-between-failure and mean-time-to-repair statistical information Equipment performance analysis and maintenance strategy planning Maintenance History capabilities: Instant access to all current work orders and job plans for equipment Instant access to all PM/PDM procedures and the ability to record meter readings Complete Work Order History for all closed or canceled Work Orders Location and Parent/Child hierarchy history tracking by equipment Warranty Management design capabilities: Instant access to warranty, lease, rental agreement and service contract information Equipment Location Tracker capabilities: Detailed equipment location information Unlimited Parent/Child hierarchical relationship development for equipment and locations Bill of Material design capabilities: Unlimited Bills of Material (parts lists) to equipment cross-reference Make/model bills of material creation and tracking Automatic bill of material creation during part issue Equipment tree view capabilities: Graphical equipment/location tree view Drag and drop equipment/location relocation functionality Equipment/location detail drill-down capability Work Order component capabilities: Create, plan, approve, schedule, and track user defined work orders User Defined Work Order Types Unlimited Work Order Steps On-line View of Estimated and Actual Costs User Defined Problem, Failure, Cause, Effect and Action Codes Instant Access to Safety Related Information Including Permit to Work, Lockout/Tagout Procedures, Required Permits, Confined Space Entry Log, Gas Test Log, PPE, etc. Assign work - direct work to request approval, planning group User definable work order numbers (manual or auto-number) Duplicate request detection Engineering change notice control Work Order account costing Equipment data analysis Review closed work orders with modeling Review of estimated costs Warranty notification Schedule work for outage Automatic rejection notification to planner / requester Work order approval routing via E-mail / Messaging functionality Access to employee / skill level / qualification availability schedules Access to equipment / equipment tree availability schedules Schedule work based on material availability Schedule work based on windows of opportunity scheduling Scheduling compliance determination functionality Create and maintain a library of job plans and tasks Archive historical equipment repair information Work Requests with Work Order capabilities: Stand alone work request document Problem tag printing Internet enabled work request capability Work request to work order conversion or consolidation Complete work request audit trail Work History features include: Complete work order details sent to history User defined delays for work order completion ? Closure and cost accumulation Work Order Process Flow Definition includes: User defined work order business process flow User defined approval routing levels and signature requirements Internal routing mailbox and e-mail functionality Job Plans features: The Library of Job plans/Job standards Instant conversion into PM/PDM routines or work orders Job plan to permit to work association Microsoft Project Interface: Baseline API to Microsoft Project for resource leveling Preventive Maintenance/Predictive Maintenance component: Create, track, and analyze PM/PDM routines Work task library Previous equipment repair review Review performance standards PM approval routing User defined PM/PDM calendar and meter frequencies PM/PDM performance route definition PM/PDM account costing PM/PDM performance analysis Completion comments and repair codes Cancellation statistics and consequences Forecast requirements PM/PDM actual and projected cost review Increase / decrease frequency based on mean-time-between-failure Preventive Maintenance task and routine features: Library of Preventive/Predictive Maintenance procedures Conversion of job plan/job standard into PM/PDM routine Seasonal activation of PM/PDM work Fixed and float PM/PDM reset capability Tasking On-demand PM/PDM performance route definition User Defined Preventive Maintenance Schedules and Meter Frequencies: User defined calendar/occurrence Frequencies Accumulating, increasing, fixed and fluctuating value meter reading type Unlimited meter types Unlimited meter triggers for each PM/PDM Complete meter reading history capability Meter reading validation formula definition Meter instrument tracking Preventive Maintenance capabilities: PM/PDM history analysis and graphing capability Preventive Maintenance Due List Forecasting features: "What If" PM/PDM forecasting capability "Due List" printing and E-mailing Work order generation and scheduling from due list "Skip PM/PDM" and trigger reset capability Scheduler component: Definition of scheduling parameters including; activity source, work order, preventive maintenance, projects; crew, trade, shift, department; work order type, work order status; Scheduled start date and duration Evaluate schedule possibilities based on activities and workforce availability Printing of committed schedules in GANT chart format Schedule compliance review of committed schedule with actual work performed Project Tracking features: Create and track the estimated, actual, committed, and remaining costs for projects Electronic access to all documents associated to a project Planner notification for project cost limits Direct Labor and Material Charge features: Differentiation of Labor, contract labor, and material costs Labor and material account definition at the project task level Direct Labor and Material Charges are maintained via the following features: Differentiation of Labor, Contract Labor, and Material Costs Labor and Material Account Definition at the Project Task Level Cost Accumulation at the Task and Project Level Project Tracking Cost Recalculation features: Project Cost Adjustment Functionality On-line Project Cost Recalculation Reporting: Use of any third party ODBC compliant report writer, such as Crystal Reports Ability to create new reports and the ability to incorporate reports into forms/menus Provide body of standard reports relevant to subject areas Include report writing capability within base system END OF STATEMENT OF WORK. DELIVERY: FOB Destination is required (all freight included). FAR 52.212-1 Instructions to Offers - Commercial Items (AUG 1998) is incorporated by reference and applies to this acquisition. Within FAR 52,212-1 an reference to ?offer? is changed to read as ?quote?. The provisions at 52.212-2 Evaluation ? Commercial Items (JAN 1999) does not apply to this acquisition. Instead, the following information will be used for evaluation of offerors: An award shall be made to the responsible offeror submitting a technically acceptable quote and offering the lowest evaluated price. Evaluation is based on best value including cost and ability to meet stated requirements above. Offerors shall submit descriptive literature and drawings detailing features, technical capabilities and warranty data. Technical acceptability will be determined solely on the content and merit of the information submitted response to this provision as it compares to the minimum characteristics provided above. Therefore, it is essential that offerors provide sufficient technical literature, documentation, etc., in order for the Government evaluation team to make an adequate technical assessment of the quote as meeting technical acceptability. Price shall be the deciding factor among technically acceptable quotes. The offeror shall provide backup information to support the quoted prices (e.g. a copy of current catalog or established price list, etc.). all Offerors will need to include a completed copy of the provision at FAR 52.212-3, Offeror Representation and Certification ? Commercial Items with the offer. The clause at 52.212-4, Contract Terms and Conditions ? Commercial Items, and FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders ? Commercial Items, applies to this acquisition. All commercial provisions and FAR clauses referenced in this solicitation are available in full text at the following website location: http://www.arnet.gov/far/. ALL INTERESTED PARTIES SHALL SUBMIT OFFERS WITH THE FOLLOWING INFORMATION: Federal Tax Identification (TIN); Dun & Bradstreet Number (DUNS); remit to address if different; and business size. EVALUATION: The following factors shall be used to evaluate offers in order or precedence: Technical compliance with the specifications of this RFQ and cost. A Firm Fixed Priced Purchase Order shall be issued using the Simplified Acquisition Procedures FAR Part 13. Responses/offers are due no later than 5:30 p.m. Eastern Time Zone on September 23, 2002. Quotes may be faxed to Mr. Robert Mohn, at 412-386-5770 or E-mailed mohn@netl.doe.gov. Technical Representative for this above item is Mr. David Dowdell at 412-386-4689.
 
Web Link
Click here for further details regarding this notice.
(http://e-center.doe.gov/iips/busopor.nsf/Solicitation+By+Number/D1D185E4D39DA25885256C3100831158?OpenDocument)
 
Record
SN00163299-W 20020913/020911213345 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.