Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 02, 2002 FBO #0335
MODIFICATION

99 -- 3-AXIS, 3-CHANNEL LOAD CELLS

Notice Date
11/1/2002
 
Notice Type
Modification
 
Contracting Office
NASA/Lyndon B. Johnson Space Center, Houston Texas, 77058-3696, Mail Code: BH
 
ZIP Code
00000
 
Solicitation Number
9-BH13-95-02-82P
 
Response Due
11/5/2002
 
Archive Date
11/1/2003
 
Point of Contact
Sharyn L Willis, Contract Specialist, Phone (281) 483-5863, Fax (281) 244-5337, Email sharyn.l.willis1@jsc.nasa.gov - Krystine O. Bui, Contracting Officer, Phone (281) 483-4186, Fax (281) 244-5331, Email krystine.o.bui1@jsc.nasa.gov
 
E-Mail Address
Email your questions to Sharyn L Willis
(sharyn.l.willis1@jsc.nasa.gov)
 
Description
THIS NOTICE CONSTITUTES AMENDMENT NO. 1 TO THE COMBINED SYNOPSIS/RFQ FOR 3-AXIS, 3-CHANNEL LOAD CELLS. Companies shall acknowledge all amendment(s) in their quote. This notice serves as the official amendment to subject synopsis/RFQ and a written amendment will not be issued. The purpose of this amendment is to answer the following questions. Q1. How many electrical outputs are needed at the connector? i.e. three outputs only for Fx, Fy & Fz? or six outputs for Fx, Fy, Fz, Mx, My & Mz? A1. Only three channels of data (electrical outputs) for Fx, Fy, and Fz. Q2. What type of connector(s) are needed? MS type, D Subminiature, Lemo type? Can there be more than one connector? A2. If you have a connector on sensor side, it must be positively locking and metallic. If there is no connector on the sensor side, it must provide a 10 ft long, Teflon insulated, strain relieved cable. There in no requirement to have a connector on the free end of the cable. Q3. The 4 holes that have 0.256 dia thru hole, do they have to be accessible from the inside? A3. Not sure if I am interpreting the question correctly, if the question is can you have a blind hole verses a through hole that is that has access to put a wrench on top to secure a fastener, the yes. If the blind hole has an A286 1/4"-28, insert with 1/2" thread engagement. Q4. Is testing required for each of the axis including the Force & Moment axis? in both directions for each of the axis? A4. Yes, testing and calibration are required for each axis, for each load cell per gov standard as stated in spec. Q5. Since higher sensitivity for Fx, Fy, and Fz is desirable, can we offer amplified (external or internal) output such as +/- 5VDC at the rated capacities? A5. No, our system already provides external amplification. The due date for receipt of offers is not extended. Companies shall provide the information stated in the synopsis/RFQ posted on the NASA Acquisition Internet Service (NAIS) on 11/5/02. Documents related to this procurement are available over the Internet and are in Microsoft Office 97 format and reside on the World Wide Web (WWW) server which may be accessed using a WWW browser application. The Internet site, or URL, for the NASA/JSC Business Opportunities home page is http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=CL&pin=73
 
Web Link
Click here for the latest information about this notice
(http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=73#103361)
 
Record
SN00196808-W 20021102/021101073538 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.