Y -- Paint Booth and Dust Collection Booth

Notice Date
10/31/2002
 
Notice Type
Sources Sought
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Luke AFB Contracting Squadron, 14100 W. Eagle Street, Luke AFB, AZ, 85309
 
ZIP Code
85309
 
Solicitation Number
Reference-Number-F02604
 
Archive Date
12/15/2002
 
Point of Contact
Rebecca Schaffer, Contract Specialist, Phone 623-856-7179x253, Fax 623-856-3438, - Mary Peetz, Contract Specialist, Phone 623) 856-6402 x250, Fax (623) 856-3438,
 
E-Mail Address
rebecca.schaffer@luke.af.mil, mary.peetz@luke.af.mil
 
Description
This is a sources sought notice for a paint booth and dust collection booth from Luke AFB, AZ. NAICS code is 233310 and SIC code is 1541. Please respond if your company would be able to provide the items specified below or if your company has the ability to provide comparable items. Respond by 30 Nov 02 at 4:30p.m. Arizona time. Include in your response any applicable specifications of the items along with an estimated range of cost. You may address your responses and any questions to SSgt Rebecca M. Schaffer, Contract Administrator or Mrs. Mary Peetz, Contracting Officer. Any questions must be submitted to the 56th Contracting Squadron in writing by 15 Nov 02. Contact phone numbers are 623-856-7179 ext.253 and ext.250 respectively. Contact fax number is 623-856-3438. Mailing address is: Attn: SSgt Rebecca M. Schaffer 56 CONS/LGCB 14100 W. Eagle Street Luke AFB, AZ 85309 Paint Booth Requirements Definition Scope: Custom Downdraft booth with multi stage filtering, Carbon Stage and VOC sampling (with monitor). Pressurized with intake chamber: Clean air will be introduced through a ceiling intake located at the top of the booth and exhausted through filter chambers located on the sides or floor of the booth. Air will be pulled downward from the ceiling to the floor at or above an average velocity of 100 fpm. The intake and exhaust filter layout will be designed for even air velocity throughout the working area of the booth Dimensions: 18? wide x 14? high x 40? deep Materials: Booth will be constructed from 18 gauge galvanized steel sheets. Panels should be pre-punched and companion flanged for easy assembly. Booth will be rigidly reinforced with structural steel construction. Booth should include: 4 ea. 30? Vane axial in-line exhaust fans 4 ea. High efficiency motor 46 ea. 48? 4-tube access fluorescent fixtures on side- walls and ceiling 1 set Solid, Swing type product entry door (13?4? wide x 14? high) 1 set Solid, Swing type product exit door (13?4? wide x 14? high) 2 ea. Side doors for personnel use (36? wide x 84?high; with observation window ?18 x 24?) 1 ea. Ceiling type intake filter chamber 4? high 4 ea. Side or floor exhaust filter chambers 1 ea. ?? 3-way Solenoid Valve to prevent spraying in booth when fans are off or light tube access door is opened 1 set Intake filters 1 lot Three-stage filtration system - 1st stage: primary exhaust filter - 2nd stage: secondary exhaust panel filters - 3rd stage: final filter bag filter 1 lot Carbon filter cells (necessary for VOC emissions in PPM) 1 ea. Flame ionization gas detention unit - Monitor and recorder of VOC emissions in PPM - Start-up supply of calibration gas Exhaust duct: 4 lots 30?dia. Exhaust ductwork for a 45? high-pitched roof to include 4 ea. 8? sections spiral duct with connecting rings on both ends 1 ea. 8? section spiral duct with inspection door and connecting rings at both ends 1 ea. Pitched roof flange 1 ea. Automatic roof ventilator stack head with connecting rings Controls: 1 ea. Pre-wired electrical control panel featuring single point connection 1 ea. Auto-balance system (system consists of a variable frequency drive that controls the exhaust fan motor, differential pressure gauge and sensing probes) Pressurized: 1 ea. Paint curing system. Air replacement unit utilizing outside air for curing air 1 ea. Electric Air make-up unit 1 lot Air make-up unit ductwork to include: 1 ea. 29? straight duct Installation: Booth installation will include all necessary labor and materials to install the spray booth, air make-up unit, exhaust duct, intake duct and electrical connections from electrical control panel for operation (turn key ready). Booth Installation will consist of: - Uncrating of equipment - Supply all necessary assembly hardware for spray booth and air make-up unit - Supply necessary labor for installation - Mechanical erection of booth, air make-up unit, and controls panel - Provide all electrical wiring for spray booth and air make-up components - Electrical connection from control panel to customer supplied electrical supply source - Provide lifting devices capable of lifting men to any point necessary during installation - Clean up of equipment and working area in which the installation was performed Dust Collection Booth Requirements Definition Scope: Cartridge Style Dust Collection System with total re-circulating and self-cleaning dust collection side draft. Dimensions: 18? wide x 14? high x 40? deep Booth Enclosure: Heavy duty 18 gauge galvanized steel. Each steel panel should be flanged and precision punched on 6? centers for easy, fast and accurate on-site assembly. Booth should include: 2 ea. Cartridge Modules: Module Includes - 22? high velocity centrifugal fan - Heavy duty totally enclosed fan cooled motor - 15 ea. High efficiency durable cartridge filters with 99.8% rating, at .5 microns. (Air to Filter ratio: 2:6:1) - Air pulse valves incorporated with a Venturi increases the cleaning efficiency of the cartridge filters and provides added filter service life. - Air manifold internally mounted - Large storage drawers for waste collection designed for easy access and maintenance 24 ea. 48? 4-tube access fluorescent fixtures on walls and ceiling 1 set Swing-type filtered product entry/exit doors (13?4? wide x 14? high) 2 ea. Side doors for personnel use (36? wide x 84?high; with observation window ?18 x 24?) 1 ea. Fire suppression system 1 ea. Breathing air unit; forced air system (4 persons max) 1 ea. Working air supply (compressor supplying 90 psi) 1 lot Necessary assembly hardware Control: 1 ea. Electrical control panel (tri-voltage 208/230/460 volts, 3 phase, 60 hz)
 
Place of Performance
Address: Luke AFB, AZ
Zip Code: 85309
Country: USA
 
Record
SN00197071-W 20021102/021101073853 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.