MODIFICATION

10 -- SENSOR FUZE WEAPON (SFW) TACTICAL MUNITION DISPENSER (TMD) FUZE MODIFICATION

Notice Date
11/4/2002
 
Notice Type
Modification
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AAC - Air Armament Center, AAC/PK 205 West D Avenue, Suite 433, Eglin AFB, FL, 32542-6864
 
ZIP Code
32542-6864
 
Solicitation Number
Reference-Number-YHK-03-0001
 
Response Due
11/18/2002
 
Point of Contact
Vicki Keider, Contract Specialist, Phone (850)882-3416 x 3162, Fax (850)882-2533,
 
E-Mail Address
vicki.keider@eglin.af.mil
 
Description
Amendment: This action, originally publicized in the Federal Business Opportunities (FBO) dated 18 October 2002, is amended as follows: a) Effort must be complete within 10 months of contract award to meet the Sensor Fuzed Weapon (SFW) production schedule; b) The estimated contract cost for both phases is $2.1M; and c) A Technical Data Package for the fuze and timer assembly is available. Interested firms are requested to contact Vicki Keider at (850) 882-3416, extension 3162 or by email at vicki.keider@eglin.af.mil. POSTED 10/18/2002: The Air Armament Center (AAC) Sensor Fuzed Weapon (SFW) Program Office, AAC/YH, plans to contract with Alliant TechSystems (ATK) for the design of an electronic timer which replaces a mechanical timer in the fuze for the Tactical Munition Dispenser (TMD) section of the SFW system. The fuze is currently manufactured by ATK, and a previous Value Engineering Change Proposal (VECP) 0026-E-0160 has been submitted which describes the detailed methodology that will be used to replace the mechanical timer. The new electronic timer must be physically and functionally interchangeable with the current production fuze, improve performance by reducing timing tolerances, enhance producibility and testablility, and provide cost savings when compared with the present approach. The new timer must operate from the system battery and cannot consume any power over and above the present combination of mechanical elements and electronic circuitry. The new electronic assembly must interface with the current set of mechanical elements including piston actuators, explosive bolts, and detonators. The new circuitry must be laid out on the printed circuit board used in the current fuze section of the TMD. The effort is to be accomplished in two phases. Phase 1 is a design and prototype hardware effort, and phase 2 (a contract option) is to be the qualification and implementation phase. The scope of the design phase of the effort shall be the non-recurring development work required to update the previously submitted VECP fuze design to current electronic technology and to provide prototype hardware. Phase 2 will be the fabrication, prove out, and qualification of hardware effort. The contractor shall identify tasks to be accomplished along with cost and schedule for each phase of the effort. The Contractor shall also provide estimated unit cost of the redesigned fuze. It is anticipated that only one source, Alliant TechSystems, Janesville, WI, Developer of the fuze VECP can satisfy the minimum needs for this unique weapon system. This contractual action is expected to be executed using ?Other than Full and Open Competition? procedures pursuant to FAR 6.032-1(a)(2)(ii). This synopsis is for information and planning purposes only, does not constitute a solicitation for bid or proposals and is not to be construed as a commitment by the government. Direct all communications concerning this acquisition to Vicki Keider at (850) 882-3416, extension 3162. See Numbered Notes 22 and 26. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (04-NOV-2002). IT ACTUALLY FIRST APPEARED ON THE FEDBIZOPPS SYSTEM ON 06-NOV-2002. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Record
SN00201040-W 20021108/021106214138 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.