Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 12, 2002 FBO #0375
SOLICITATION NOTICE

C -- ELKWATER FORK WATER SUPPLY DAM, A&E DESIGN

Notice Date
12/10/2002
 
Notice Type
Solicitation Notice
 
Contracting Office
Department of Agriculture, Natural Resources Conservation Service, West Virginia State Office, 75 High Street, Room 301, Morgantown, WV, 26505
 
ZIP Code
26505
 
Solicitation Number
NRCS-1-WV-2003
 
Response Due
1/17/2003
 
Point of Contact
William Doerr, Supervisory Contract Specialist, Phone 304-284-7556, Fax 304-284-4839, - Theresa Hafer, Contract Specialist, Phone 304-284-7557, Fax 304-284-4839,
 
E-Mail Address
bill.doerr@wv.usda.gov, theresa.hafer@wv.usda.gov
 
Description
The contractor shall furnish the necessary personnel, equipment, labor, materials, transportation, office space and related support facilities to perform the services described herein. All submittals, including 254 and 255 documents, shall be originals. NO fax copies shall be accepted. The services provided consist of preparing the analysis, design, construction drawings, and specifications for a water supply structure to be built on the Elkwater Fork of the Tygart Valley River in Randolph County, West Virginia. The structure will be constructed of roller compacted concrete. The work will include hydrologic analysis, hydraulic proportioning, foundation investigation and evaluation, structural design, preparation of detailed construction drawings and specifications, and computation of quantities and cost estimates. The contract will consist of the following phases: Phase I - DEVELOPMENT OF DATA BASE Field surveys and mapping Subsurface investigation Field and laboratory testing of samples Preparation of geology and soil mechanics report Identification of sources of borrow Earth and rock fill Aggregate for RCC Collection of basic hydrologic data and parameters Phase II - PRELIMINARY DESIGN Hydraulic proportioning Breach inundation mapping. Streamflow diversion plan Preliminary drawings and specifications Preliminary quantities Preliminary cost estimate Phase III - PROJECT PLAN MAP AND STAKEOUT Develop project plan map Stakeout features of the dam, permanent pool, and flood pool Phase IV - FINAL DESIGN Revise preliminary design and prepare final design Prepare final structural design and details Prepare final drawings and specifications Prepare final quantities, cost estimate, and construction schedule Phase V - SERVICES DURING CONSTRUCTION Provide consultative services to the contracting officer during construction. Firms will be evaluated on the following factors: 1) Professional qualifications necessary for satisfactory performance of the required services (20%); evaluation will be based on experience and qualifications of proposed key personnel including specialized technical skills, project coordination, management skills, and experience working together as a team. 2) Specialized experience and technical competence in the type of work required (35%); evaluation will be based on experience related to preparation of preliminary and final designs, specifications, and drawings for the type of work required. 3) Capacity to accomplish the work in the required performance time (20%); evaluation will be based on volume and nature of present workload as it relates to the ability to perform the required work, and the availability of additional contractor personnel or consultants to support expansion or acceleration of the work. 4) Past performance on contracts with federal, state, and local agencies and private industry (15%); evaluation will be based on the quality, as demonstrated by sound technical knowledge and judgement, and timeliness of performance under previous contracts. 5) Location in the general geographic area and knowledge of the locality of the project (10%); evaluation will be based on proximity to Morgantown, West Virginia and the extent of previous work performed in the state of West Virginia. Interested and qualified firms should submit a completed SF-254 and SF-255 to this office no later than January 17, 2003. Four (4) copies of all materials shall be submitted. Only firms responding by this date will be considered for selection. Effective immediately, Natural Resources Conservation Service will be using FedBizOpps for posting government business opportunities. This is an Internet based system and can be accessed at www.fedbizopps.gov. At this site you will review synopsis notices about upcoming solicitations, obtain bid documents, obtain amendments to bid documents, and review information on contract awards.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/USDA/NRCS/WVSO/NRCS-1-WV-2003/listing.html)
 
Place of Performance
Address: U. S. Department of Agriculture Natural Resources Conservation Service (NRCS) 75 High Street, Room 301 Morgantown, WV 26505
 
Record
SN00220923-F 20021212/021211052701 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.