SOLICITATION NOTICE
Y -- Center for Nanophase Materials Science (CNMS)
- Notice Date
- 1/8/2003
- Notice Type
- Solicitation Notice
- Contracting Office
- Department of Energy, Oak Ridge National Laboratory - UT Battelle LLC (DOE Contractor), Oak Ridge National Laboratory, Bethel Valley Road P.O. Box 2008, Oak Ridge, TN, 37831-6192
- ZIP Code
- 37831-6192
- Solicitation Number
- F5-2681-02-RFP02-1096
- Archive Date
- 4/23/2003
- Point of Contact
- Ralph Helton, AE/CM Procurement Specialist, Phone 865-241-7592, Fax 865-574-3877,
- E-Mail Address
-
heltonrs@sns.gov
- Description
- 1. All inquiries relative to the contents of this Pre-Solicitation Notice are to be addressed to: Knight/Jacobs Joint Venture 701 Scarboro Road, Mail Stop 6476, Oak Ridge Tennessee 37830, Attention: Jerry Ferguson - Telephone (865) 241- 8098, E-Mail Address: fergusonj@ornl.gov, Facsimile (865) 574-3872. 2. All parties interested in receiving a formal solicitation for this construction project must be an approved and pre-qualified as a general contractor. The Knight/Jacobs Vendor Pre-qualification questionnaire can be obtained through the point of contact (POC) identified in Note 1 above or via the Web at www.sns.gov/pro/ . 3. The following information is applicable to all potential subcontractors: (a) Knight/Jacobs Joint Venture is the Architect Engineer and Construction Manager for the Center for Nanophase Materials Sciences (CNMS) building General Construction Project. (b) UT-Battelle, LLC is the Management and Operations contractor of the Oak Ridge National Laboratory as prime contractor to the U.S. Department of Energy. (c) There are no classified security requirements associated with the construction of the CNMS Project. (d) All construction subcontractors are required to become signatory to the Project Labor Agreement (PLA). The PLA is only subject to work performed on the CNMS Project. A copy of the PLA is available for review through the POC identified in note 1 above. (e) All work is deemed "Green Field" construction and is not considered "inside the fence" of the DOE reservation. (f) The CNMS Project Site is a Drug Free Workplace and all successful subcontractors will be subject to a pre-site access alcohol and drug screening. (g) All successful subcontractors will possess an Interstate Experience Modification Rate (EMR) of 1.0 or less for the previous full three (3) year period. (h) The successful subcontractor will be required to furnish performance and payment bonds. (i) The successful subcontractor will be required comply with the Office of Federal Contract Compliance Programs goals for employment of protected classes of individuals. (j) The successful subcontractor will be required meet or exceed Small Business Subcontracting Goals established under the subcontract. 4. The construction magnitude for the Center for Nanophase Materials Sciences (CNMS) scope of work is in excess of $15M and has an estimated completion of 550 calendar days after issuance of notice to proceed. 5. A formal solicitation is scheduled to be issued on or about February 25, 2003. 6. The CNMS building is a 80,000 gross square foot facility providing the office, laboratory and "Clean Room" necessary to operate the facility. The facility is comprised of a four (4) story curved office and laboratory structure connected to a one story "Clean Room" Facility. The "Clean Room Facility " is a bay and chase fabrication facility with supporting equipment and storage rooms. This portion of the facility shall be constructed by an experienced clean room subcontractor and shall be built in compliance with an approved clean construction protocol (rules) established to minimized the potential for contamination of the interior surfaces of the clean room. Protocol levels establish defining limits of permissible construction activities to ensure appropriate cleanliness is maintained for a particular phase of construction. More detail information may be obtained by referring to ISO 14644. Following is a synopsis of the Summary of Work: The work to be performed under this subcontract shall consist of furnishing all plant, tools equipment, materials, supplies and manufacturing articles, and furnishing all labor, field engineering, surveying, transportation, and services including fuel, power, water, and essential communications, or other operations required to install all elements of the Center for Nanophase Materials Sciences (CNMS) in accordance with details and dimensions shown on the drawings, and specifications. Required work also involves CM Furnished Materials and Equipment (CMFE), pre-established Directed Procurement (DP) sources for certain materials and or services .
- Place of Performance
- Address: CNMS Project Site, Bethel Valley Road, Oak Ridge, TN
- Zip Code: 37830
- Country: USA
- Zip Code: 37830
- Record
- SN00235414-W 20030110/030108213320 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |