Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 17, 2003 FBO #0411
SOLICITATION NOTICE

56 -- Maintain Airfield Pavements, Runway, Taxiways, and Aprons

Notice Date
1/15/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
USPFO for Colorado, ATTN: Mail Stop 53, 660 South Aspen Street, Building 1005, Aurora, CO 80011-9511
 
ZIP Code
80011-9511
 
Solicitation Number
DAHA05-03-B-0004
 
Response Due
1/31/2003
 
Archive Date
4/1/2003
 
Point of Contact
Onwuatuegwu Echezona, (303) 677-8679
 
E-Mail Address
USPFO for Colorado
(eche.echezona@co.ngb.army.mil)
 
Small Business Set-Aside
N/A
 
Description
NA Contractor shall provide all plant, labor, equipment, materials, and transportation to construct Project Numbers CRWU88-2033, Maintain Airfield Pavements, Runway; CRWU 01-2006, Repair Taxiway F Pavements; CRWU 01-2007, Repair West Apron Ramp; CRWU 01-2008, Repair Taxiway B,C,G, W, X, & Y Pavements; CRWU 98-2068, Repair East Apron Ramp at Buckley Air Force Base, Aurora, Colorado. Project shall consist of providing approximately 281,450 SY of asphaltic concrete pavement and 19,900 SY of PCC pavements; repair approximately 16,050 SF of PCC pavement; and approximately 283,000 LF of joint resealing. Site work shall consist of mill and overlay asphalt runway, taxiway, overruns, and apron; provide new PCC pavement and repair activities; repair spalls, cracks, and joint sealant at various project locations; perform runway arrestor system (BAK-12) upgrades and support activities; expand North overrun pavement, install new SALS base cans and duct banks; and provide runway, taxiway, overruns, and apron markings. This contract will close the runway at Buckley for a period of not to exceed 90 days. Work to be accomplished on the runway and within 125 feet of the runway on taxiways will be completed within this 90 day window or heavy liquidated damages will be assessed on the contractor. This construction contract will consist of a base bid plus multiple bid additives, which may or may not be awarded depending on funds availability. The estimated bid opening date is 21 March 2003. The estimated construction period is 2 27 calendar days with an estimated construction completion of 8 December 2003. Estimated cost of construction is between $5,000,000 and $10,000,000. Based on this solicitation, a firm-fixed price contract will be awarded. The contract solicitation will be available approximately 13 February 2003. The solicitation package will be limited to one set per bidder and will be issued on a first come, first served basis. Copies of the solicitation will be distributed to various Plans Rooms throughout Colorado. Bid documents for the Maintain Airfield Pavements project will be available on the Internet at http://www.nationalguardcontracting.org/Ebs/AdvertisedSolicitations.asp. The site visit date will be identified in the solicitation package. Place of perfo rmance is Buckley Air Force Base, Aurora, Colorado. 2. This solicitation is UNRESTRICTED: however, small businesses, veteran-owned businesses, service-disabled veteran-owned businesses, HUBZONE Small businesses, small disadvantaged businesses are encouraged to participate. A subcontracting plan will be requ ired if the bidder is a large business.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/USA/NGB/DAHA05/DAHA05-03-B-0004/listing.html)
 
Place of Performance
Address: USPFO for Colorado ATTN: Onwuatuegwu Echezona, Mail Stop 66, 660 South Aspen Street, Building 1005 Aurora CO
Zip Code: 80011-9511
Country: US
 
Record
SN00239720-F 20030117/030115215502 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.