Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 30, 2003 FBO #0424
SOURCES SOUGHT

A -- Design,fabricate,installation, startup of plasma arc thermal treatment system

Notice Date
1/28/2003
 
Notice Type
Sources Sought
 
Contracting Office
US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000
 
ZIP Code
07806-5000
 
Solicitation Number
DAAE30-03-R-0805
 
Point of Contact
Sonya Rappoport, Contract Specialist (973)724-2775
 
E-Mail Address
Email your questions to Sonya Rappoport
(srappop@pica.army.mil)
 
Description
The U.S. Army Tank-automotive and Armaments Command, Armament Research, Development and Engineering Center (TACOM-ARDEC), Picatinny Arsenal, NJ 07806- 5000 seeks to acquire the services of a qualified vendor to provide system design, fabrication, installation, start-up, testing and operation of plasma arc thermal treatment systems for the demilitarization of military ordnance. The services are required in order to complete two on-going projects as well as fully execute one new project. The two on-going projects are the Plasma Ordnance Demilitarization System (PODS) being implemented at Hawthorne Army Depot, Hawthorne, NV and the Mobile Plasma Treatment System (MPTS) being implemented at Talon Manufacturing Company, Herndon, WV. Both of these projects employ plasma arc furnace systems designed and fabricated by MSE- Technology Applications, Inc. of Butte, MT. The new project will be a combined plasma arc/cryofracture system and will likely be implemented at Sierra Army Depot, Herlong, CA. This system has not yet been designed or fabricated. The PODS is a full scale plasma arc treatment system that includes a 400 cubic foot primary processing chamber, state-of-the-art pollution abatement system, feed system, water treatment system, PC based control system, and all ancillary support systems (deionize water, chiller, compressed air, etc.). The furnace operates in an oxygen-enriched environment and contains a 1MW simultaneous transferred/non-transferred and 500kW non-transferred plasma arc torch. The system has a 500 lb/hr nominal throughput of pyrotechnic ordnance, which consists of high thermal output and high off gas output burning devices contained in metal, plastic, and cardboard casings. The system has been designed, fabricated, factory acceptance tested, installed and partially tested at HWAD. Services would be required starting in FY04 to complete start-up testing, train HWAD personnel, conduct environmental compliance tests, obtain final environmental permits, update engineering and maintenance documentation, perform process demonstration/validation/optimization tests, perform system maintenance as may be required, and transition the system to full-scale production operations. The MPTS is a transportable plasma arc treatment system that includes a primary processing chamber (furnace), state-of-the-art pollution abatement system, feed system, PC based control system, an air compressor, a 4160V generator, a cooling system and a dionized water system. The furnace operates in an oxygen-starved (reducing) environment and contains a 500kW plasma arc torch. The system has a 300 lb/hr nominal throughput for fuzes and fuze components, which is the feed material that will be processed at the Talon site. The system has been designed, fabricated, assembled and factory acceptance tested. The system is skid mounted and can be transported on 9 flat bed trailers for set-up and operation. Services are required starting in FY04, at which time the system will have already been installed, started-up, and be ready for operation at Talon. Services are required to operate the MPTS for a period of not less than one year in order to complete the fuze demilitarization campaign, evaluate process performance, perform system maintenance, decommission and disassemble the system, load it onto flat bed trailers and transport it to a location to be designated. The combined plasma arc/cryofracture project is intended to provide complete emilitarization of high explosive-containing submunitions downloaded from Cluster Bomb Units (CBUs) and 105MM/155MM artillery rounds. The process involves downloading of the submunitions, handling of the submunitions, cryofracture of the submunitions, transfer of the cryofractured debris into a plasma system, and processing of the debris into a benign slag (or recovered metal) and clean off gas compliant with the latest environmental emission requirements. For the plasma arc process portion of the combined system, the prospective contractor is required to design, fabricate, start-up, demonstrate and transition the system to full scale demil operations, as well as obtain all environmental permits and provide training and maintenance documentation. Integration of the system with the cryofracture portion of the process (Government furnished) is also required. The contractor shall use the existing PODS and MPTS systems as a starting point for the design, to maximize lessons learned and minimize technical risk. For each of the above projects, the prospective contractor should have the following: a. Experience and familiarity in the design, fabrication, installation, testing, and prove-out of plasma systems tailored for the processing of military munitions, of similar design configuration, size, complexity and throughput as the above. b. Test data supporting the ability to operate plasma furnaces in both oxidizing and reducing environments for a continuous 120 hours without torch electrode replacement. Firms with experience in the areas cited above should provide a summary of their company?s capabilities, including a description of facilities, equipment, personnel and past experience to meet this requirement. This shall include documentation describing actual systems designed, fabricated, installed, started-up, tested, and operated, as well as a description of operating experience including wastes processed, processing rates achieved, operating hours logged, torch electrode life data, and maintenance issues/malfunctions encountered. This Market Survey is for planning purposes and should not be construed as a request for proposal or as a commitment on the part of the Government to issue a solicitation. Information and samples shall be submitted at no cost or obligation to the Government. The Government is not obligated to notify respondents of the results of this survey.
 
Web Link
US ARMY TACOM-ARDEC Procurement Network
(http://procnet.pica.army.mil/cbd/SRCSgt/012820030/012820030.htm)
 
Record
SN00247953-W 20030130/030128213324 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.