Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 09, 2003 FBO #0464
MODIFICATION

Y -- Compressed Natural Gas (CNG) Fueling Facility at Four Mile Run Division, Arlington, VA

Notice Date
3/7/2003
 
Notice Type
Modification
 
Contracting Office
Washington Metropolitan Area Transit Authority, Procurement and Materiels, PRMT-JGB, 600 5th Street, Washington, DC, 20001
 
ZIP Code
20001
 
Solicitation Number
FN3021-FMP
 
Response Due
3/20/2003
 
Archive Date
4/4/2003
 
Point of Contact
Fred Pohlmann, Contract Administrator, Phone (202) 962-1529, Fax (202) 962-1228,
 
E-Mail Address
fpohlmann@wmata.com
 
Description
Proposals are solicited for RFP FN3021/FMP, Compressed Natural Gas (CNG) Fueling Facility at Four Mile Run Division. This is a Design-Build-Operate-Maintain (DBOM) project that requires the Design-Builder to design, obtain all required permits, construct, manufacture, procure equipment/material, install, test, maintain in a possible stand-by mode until the fuel delivery is provided, and operate and maintain the fueling facility to support the CNG bus fleet to be located at the Four Mile Run Division in Arlington, Virginia. The requirement to operate and maintain the existing CNG fueling facility at Bladensburg Division in Washington D. C. is also included as a five-year renewable option. The work includes, but is not limited to, installation of: natural gas dryers, compressors, dispensing systems, buffer control system, bus defueling system, fuel management system, control panels, emergency stop system, electrical equipment, gas and flame detection system, air supply control devices, and gas storage vessels. The Design-Builder, through itself or others, shall provide professional engineering and architectural services and technical, subprofessional, administrative, and other services necessary for the complete design and preparation of the Final Design and Final Design Drawings and Specifications, as well as the schedules and cost estimates the Contract requires. The Design-Builder shall also furnish all labor, equipment, materials, project management, quality control/assurance, and architecture and engineering services required for the construction of the project in accordance with Contract requirements. The period of performance is 270 calendar days after NTP for the design and construction and an additional 365 calendar days after final acceptance to operate and maintain. Proposals due o/a March 20, 2003. Estimated cost: $5,000,000 to $10,000,000. DBE Participation Goal is 22%. Contract plans/specs o/a February 18, 2003, send $50 to WMATA Plans Room, Stone Straw Building, 900 Franklin Street, N.E., Washington, DC 20017, Phone 202-269-4575. For contractual questions, Fred M. Pohlmann at 202-962-1529 or fpohlmann@wmata.com. For Technical questions, Alan S. Kolodne at 202-962-1750 or akolodne@wmata.com.
 
Place of Performance
Address: 3501 South Glebe Road, Arlington, VA
Zip Code: 22202-2326
Country: United States
 
Record
SN00274199-W 20030309/030307213903 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.