Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 01, 2003 FBO #0549
SOLICITATION NOTICE

Y -- Los Angeles CA - Alameda Carrier Annex New Construction Owned

Notice Date
5/30/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
United States Postal Service, Facilities Purchasing, Pacific Facilities Service Office, 395 Oyster Point Blvd Suite 225, South San Francisco, CA, 94099-0300
 
ZIP Code
94099-0300
 
Solicitation Number
052571-03-A-0530
 
Response Due
7/2/2003
 
Archive Date
8/2/2003
 
Point of Contact
Nancy Young, contract tech, Phone (650) 615-7241, Fax (650) 615-7243, - Grace Zipagan, Staff Secretary, Phone 650-615-7206, Fax 650-615-7243,
 
E-Mail Address
nyoung@email.usps.gov, gbatesti@email.usps.gov
 
Description
The U. S. Postal Service is soliciting proposals from prequalified firms for the construction of a two-story Postal Service-owned facility of approximately 40,000 square feet in downtown Los Angeles. The first floor of the building will house carrier operations and a bulk mail entry unit. The second floor of the building will house administrative office space for internal personnel. Construction includes but is not limited to: earthwork, sanitary sewerage, gas piping, bituminous concrete paving, plain cement concrete paving, chain link fencing, cast-in-place concrete, concrete unit masonry, structural steel, steel joists, steel deck, steel studs, handrails and railings, grating, carpentry, sheet metal flashing and trim, metal doors and frames, wood doors, hardware, aluminum windows, glazing, lath and plaster, interior framing and gypsum board, carpet, painting, accoustical ceilings, miscellaneous specialties, loading dock equipment, CCTV systems, access control systems, hydraulic elevators, packaged rooftop mechanical units and associated ductwork, plumbing, piping and associated fixtures and fittings, interior and exterior lighting, power transformers, load panels and other electrical components and systems. Estimated construction cost range is $5,000,000-$5,325,000. The work is to be completed in 300 days after notice to proceed. The proposal must contain the offeror?s overhead, profit, bonds, insurance, and all other contingencies. No allowance for such items will be made after contract award. The minority subcontracting goal is 11%. Offers will not be publicly opened. All proposal information will remain confidential until award. The prequalified firms who may submit offers on this project are: Adams/Mallory Construction Inc., 740 S. Van Buren Unit A, Placentia CA 92870-6631; AR Willinger Co. Inc., 240 Newport Center Dr., Ste 220, Newport Beach CA 92260-7514; Berry Contractors Inc., P. O. Box 308, Upland CA 91785-0308; Cox Construction Co., 3170 Scott St., Vista CA 92083-8318; DPR Construction, Inc., 4220 Von Karman Ste. 100, Newport Beach CA 92660-2056; Earl Corp., 199 S. Hudson Ave., Pasadena CA 91101-2998; I E Pacific Inc., 1663 Pacific Rim Ct., San Diego CA 92154-7502; Metro Builders & Engineers, 2610 Avon St., Ste A, Newport Beach CA 92663-4730; Sea Pac Engineering, 608 S. New Hampshire Ave., Los Angeles CA 90005-1341; Stronghold Engineering Inc., 3421 Gato Ct., Riverside CA 92507-6800; West Coast Contractors, 7785 White Fir St., Reno NV 89523-8930. THE SOLICITATION, PLANS, AND SPECIFICATIONS MAY BE ORDERED AFTER 6/2/03 FROM BARKERBLUE DIGITAL IMAGING VIA FAX 650-696-2199 OR VIA EMAIL TO plotting@barkerblue.com. Refer to www.barkerblue.com.
 
Place of Performance
Address: 1055 N. Vignes St., Los Angeles, CA
Zip Code: 90012-9998
 
Record
SN00336861-W 20030601/030531233939 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.