Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 02, 2003 FBO #0580
SOLICITATION NOTICE

F -- HYDROW MOWING FOR PACK CREEK RANCH PROJECT ON THE MANTI-LASAL NF

Notice Date
6/30/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
Department of Agriculture, Forest Service, R-4 Geospatial Service & Technology Center, 2222 West 2300 South, Salt Lake City, UT, 84119
 
ZIP Code
84119
 
Solicitation Number
RFP-10-03-089
 
Response Due
8/17/2003
 
Archive Date
9/10/2003
 
Point of Contact
Nelda Montgomery, Purchasing Agent, Phone (801)975-3443, Fax (801)975-3478, - Karen Goodsell, Contracting Officer, Phone (801) 975-3442, Fax (801) 975-3483,
 
E-Mail Address
nmontgom@fs.fed.us, kgoodsell@fs.fed.us
 
Small Business Set-Aside
Total Small Business
 
Description
This project consists of reducing the density of small diameter vegetation in the 1" to 8" DBH on the Pack Creek Ranch hazardous fuel reduction area. Stubble height of the treated vegetation will be less than 6". Dominant vegetation in the majority of the project area is pinyon pine and Utah juniper, with lesser amounts of oak brush and sagebrush. Project area is in San Juan County on U.S. Forest Service public land. Size of the project area is approximately 630 acres. Vegetation shall be reduced to a mulch material with a minimum of 80% of the woody material less than 1" in diameter and 6" long. The mulch shall be scattered evenly across the surface and not remain in piles deeper than 6" deep. Stumps shall be left with a jagged cut to decrease time of decomposition. All work will be accomplished with a machine mounted, vertical-shaft cutting, thinning and shredding machine containing large (flotation type) lugged rubber tires to reduce impact to the ground, and ride over the remaining stumps and mulched vegetation. All costs to the contractor (such as transportation of equipment and travel by the operator) are to be included in the cost per project. Contractor will only be paid for the actual completion of the project. The Contracting Officer?s Representative (COR) will mark areas to be treated and/or avoided. The boundary of the units will be marked by existing fence lines, or flagged with ribbon. Treated areas may be in the form of small clear cuts, strips, mosaics, or general thinnings. All treatments will be directed by the COR. Any known archaeological sites in the project area will be flagged prior to the start of the mowing operations. These archaeological sites will be avoided. Solicitation package will be approx. be uploaded into FedBizOpps on July 17, 2003.*****
 
Place of Performance
Address: San Juan County, UT
 
Record
SN00360002-W 20030702/030630213153 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.