Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 05, 2003 FBO #0583
MODIFICATION

16 -- Manufacture of Horizontal Stabilizer Actuator Assembly applicable to C-5 Aircraft

Notice Date
7/3/2003
 
Notice Type
Modification
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, WR-ALC, WR-ALC/PK Acquisition Opportunities 235 Byron St,, Warner Robins, GA, 31098-1611
 
ZIP Code
31098-1611
 
Solicitation Number
F09603-03-R-35247
 
Response Due
8/14/2003
 
Archive Date
8/29/2003
 
Point of Contact
Sharon Broughton, Contracting Officer, Phone (478) 926-0172, Fax (478) 926-7649,
 
E-Mail Address
Sharon.Broughton@robins.af.mil
 
Description
The sole source requirement is for a firm fixed price requirements contract for the manufacture of a C-5 Horizontal Stabilizer Actuator Assembly, NSN 1680-01-177-5069UC, P/N: 42093-407 and an Acme Screw and Nut Assembly, NSN 1650-01-241-8143UC, P/N: 42093R187. Theses items are applicable to the C-5 aircraft. MATL: Steel and Aluminum DIMENSIONS for horizontal stabilizer Actuator assembly: 21 in. H x 23 in. W x 54 in. D, 670 lbs. FUNCTION: This actuator assembly is a hydraulically powered unit; electrically and manually controlled: used to actuate the horizontal stabilizer pitch trim on the C-5 aircraft. DIMENSIONS for Acme screw and nut assembly: 10? in diameter, 72? long, Weight: 210 lbs. FUNCTION: The Acme screw and nut assembly drives the trim surface of the horizontal stabilizer either to the nose-up or nose-down altitude. DELIVERY: First Article for horizontal stabilizer actuator assembly is due 360 calendar days from date of contract with production items for actuator and screw and nut assembly due 90 days after approval of First Article. The requirement consists of a Basic Ordering Period and 4 Annual Ordering Periods. Delivery will be to Robins AFB GA 31098. DATA IS NOT AVAILABLE FOR THIS REQUIREMENT. This requirement is sole source to Rolls Royce Gear Systems (82402). The approximate RFP issue date will be 14 Jul 2003 with the approximate response date of 14 August 2003. RFP will be available for viewing or downloading at www.fedbizopps.gov.only. No telephone requests. NO HARD COPIES WILL BE ISSUED. Notes 22,26
 
Record
SN00363753-W 20030705/030703213502 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.