Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 05, 2003 FBO #0583
SOLICITATION NOTICE

Z -- Replace house foundation, central WA

Notice Date
7/3/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
PWR - NOCA North Cascades NPS Complex 7280 Ranger Station Road Marblemount WA 98267
 
ZIP Code
98267
 
Solicitation Number
N9471031144
 
Response Due
8/14/2003
 
Archive Date
7/2/2004
 
Point of Contact
Sarah J. Welch Contract Specialist 360873459011 Sarah_Welch@nps.gov;
 
E-Mail Address
Email your questions to Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Total HUB-Zone
 
Description
PROJECT SUMMARY: This contract is to replace the foundation on the two-story "Castle" residence, including raising the house, removing the existing foundation, lowering the house, and attaching it to the new foundation. LOCATION: Stehekin is a remote community located 50 miles from Chelan, Washington, at the north end of Lake Chelan. The Stehekin valley is isolated; the roads do not connect with any highway system. Stehekin is accessible from Chelan only by boat, barge, or float airplane. Within the Stehekin valley, the project area may be reached on roads suitable for hauling heavy equipment. Lodging and meal services are available on a limited basis. Cellular phones do not work. DESCRIPTION DETAILS: The contractor shall raise the house, which measures 27 feet by 34 feet, at least four (4) feet above its present elevation. The NPS will be responsible for disconnection of utilities, removal of the fireplace/chimney, and the exterior stairways and decks prior to contractor raising the building. Contractor shall place cribbing or supports under the raised building in accordance with the written technical approach to be provided by the contractor with their proposal and approved by the NPS. The contractor shall remove existing foundation materials currently in place and replace the foundation with poured-in-place footings and piers along with Concrete Masonry Unit (CMU) foundation walls in accordance with foundation plan drawings provided with the NPS architectural drawings. Following completion of the new foundation construction and minimum 28 day cure time for concrete and mortar, the contractor shall lower the building onto the foundation and securely attach the structure to the new foundation as per the drawings and specifications. Contractor shall be responsible for the security and safety of the structure for the duration of the contract. SOLICITATION DETAILS: This is a best value procurement, set-aside for HUBZone concerns only. The estimated price range for this project is between $25,000 and $100,000. This solicitation will be available at http://ideasec.nbc.gov on or about July 22, 2003. Hard copies of the solicitation will not be provided.
 
Web Link
Please click here to view more details.
(http://ideasec.nbc.gov/ecprod/owa/ec$cbd.sypfirstcount?P_SERVER_ID3=NP144302&P_OBJ_ID1=1098968)
 
Place of Performance
Address: Stehekin WA, Chelan county
Zip Code: 98852
Country: USA
 
Record
SN00363914-W 20030705/030703213652 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.