SOLICITATION NOTICE
13 -- MDI Combined ID/IQ
- Notice Date
- 7/10/2003
- Notice Type
- Solicitation Notice
- Contracting Office
- US Army ARDEC, AMSTA-AR-PC, Picatinny Arsenal, New Jersey 07806-5000
- ZIP Code
- 07806-5000
- Solicitation Number
- DAAE30-03-R-0109
- Response Due
- 7/24/2003
- Archive Date
- 8/23/2003
- Point of Contact
- John Ebanks, Contract Specialist, 973-724-3244
- E-Mail Address
-
John Ebanks
(ebanks@pica.army.mil)
- Description
- Date Issued: 07/10/03 Closing Date and Time:07/24/03 U.S. Army TACOM-ARDEC, Picatinny Arsenal, NJ has a requirement for the production of the following Modern Demolition Initiator (MDI) items: (1) Cap, Blasting, Non-electric, delay, M15 which consist of a 70 foot length of shock tube coiled in a figure 80 configuration. On one end it is a factory installed 200-millisecond delay number 12 commercial blasting cap and with a 25 millisecond cap packaged into a holder at the other end. The holder has the capability of holding a range of one to five shock tube lines. The shock tube consists of a small diameter plastic tube of extruded polymer with a very fine layer of energetic materiel deposited on the inner wall. The shock tube is non- fragmenting and noiseless. (2) Cap, Blasting, Non-electric, 70ft shock tube with initiator, M15 Inert. The M15 Inert physically represents the actual M15 except that all its components are inert. (3) Cap, Blasting, Non-electric, Delay, M18. The M18 consists of a length of M700 Time Blasting Fuse, complying with MIL-F-45144, environmentally sealed at one end, with a non-electric, factory installed, 0-delay blasting cap at the other end with an output equivalent to a number 12 commercial blasting cap, and must be capable of initiating composition C-4. The M18 have a fuse burn time of 5minutes and 20 minutes, respectively. (4) Cap, Blasting, Dual, in-line initiator, non- electric, 200ft minitube, M19. The M19 dual blasting cap assemblies consists of M42C1 primers built into the end of two 200 foot lengths of mini tube, outside diameter not to exceed 0.095 inch with a non-electric, non-delay blasting cap, attached at the other end, with an output equivalent to a number 12 commercial blasting cap, and must be capable of initiating composition C-4. Attached to the primer end shall be the Firing Assembly, P/N 8822504 of the M81 Igniter. (5) Cap, Blasting, Dual, in-line initiator, non-electric, 200ft minitube, Inert, M20. The M20 physically represent the actual M19 except that all its components are inert. (6) Booster, Demolition Charge M151. The M151 consist of a 10ft length of detonating cord sealed at one end and with a non- electric, factory installed non-delay booster at the other end with an output equivalent to a number 112 commercial blasting cap, and must be capable of initiating composition C-4. It should include a detonating clip or similar device at the sealed end. (7) Booster, Demolition Charge M152. The M152 consist of a 30ft length of detonating cord sealed at one end and with a non- electric, factory installed non-delay booster at the other end with an output equivalent to a number 12 commercial blasting cap, and must be capable of initiating composition C-4. It should include a detonating clip or similar device at the sealed end. (8) Booster, Demolition Charge M152 Inert. The M152 Inert physically represents the actual M152 except that all its components are inert. A firm-fixed price Indefinite Delivery/Indefinite Quantity contract will be used for this acquisition. The government reserves the right to make multiple awards in this effort. The contract will consist of five (5) years in which the government reserves the right to procure any or all of the items listed above at any time within the contract performance period thus not binding the government to specific items at a specific time. The anticipated minimum guarantee amount of this contract is estimated at $250,000 with a maximum of $25,000,000 over the five-year period of performance (FY 2004 to FY 2009). Eight (8) bid samples of the following; M15, M18 and M151 are anticipated to be required for evaluation and source selection purposes. Note that the requirements for the M19 and M20 are planned to be included in the last two years of this contract. The competitive Request for Proposal (RFP) will be available electronically at the following Internet address: http://procnet.pica.army.mil on or about fifteen (15) days from date of this announcement. Proposals will be required within thirty (30) days of date of release of the RFP. Point of contact for this requirement is Mr. John Ebanks, Contract Specialist, AMSTA-AQ-APA, Bldg. 10, Picatinny Arsenal, NJ 07806-5000; email: ebanks@pica.army.mil, telephone number: (973) 724-3244. See numbered notes 26.
- Web Link
-
US ARMY TACOM-ARDEC Procurement Network
(http://www.eps.gov/spg/USA/USAMC/DAAE30/DAAE30-03-R-0109/listing.html)
- Record
- SN00369104-F 20030712/030710221257 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |