Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 30, 2003 FBO #0608
SOLICITATION NOTICE

59 -- Telephone Cable for VARO Phone System

Notice Date
7/28/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
Attn: Department of Veterans Affairs Denver Distribution Center, P.O. Box 25166, Denver, Colorado 80225-0166
 
ZIP Code
80225-0166
 
Solicitation Number
791-12-03
 
Response Due
8/6/2003
 
Archive Date
9/5/2003
 
Point of Contact
Point of Contact - Albert Hauer, Chief, Acquisition & Materiel Management, (303) 914-5181, Contracting Officer - Albert Hauer, Chief, Acquisition & Materiel Management, (303) 914-5181
 
E-Mail Address
Email your questions to Albert Hauer
(al.hauer@mail.va.gov)
 
Description
STATEMENT OF WORK 1. Title of Project: Denver VA Regional Office Telephone Switch Cable Installation 1. Scope Of Work a. Award will be a small business set-aside to install voice cable at the Veterans Affairs Regional Office (VARO) located at 155 Van Gordon Street, Lakewood, Colorado. Labor and materials are to be identified separately and all materials are to be itemized. Quotes are to be signed, dated and received via mail, fax, no later than August 6, 2003. Attached SF 129 must accompany quote. Visits to prepare quote are authorized and will be done at one time with all interested bidders. Contact Lyle Miller at (303) 914-5888 to arrange the time. b. Install Category 3 plenum cable from the 1st floor PBX room, to the 4th floor computer room. All cables will be installed into existing cable trays, tie wrapped, use existing holes and junction boxes, no floor coring or holes in walls are to be drilled, patch panels will be category 5E 48 port, wiring to be 1000 pair. All cables will be routed according to TIA/EIA standards and will be placed sufficient distance away from EMI/EFI interference. All materials utilized in the suspended ceiling will be plenum rated. All cables will be labeled, and tested. All cable must be installed and functional within 16 calendar days of the award of the contract or August 25, 2003. Must be available to provide support and make necessary adjustments to the cable and repair if needed at the time VARO installs new phone system c. Specify terms and conditions of warranty in quote. Conditions of the warranty may be considered as a tiebreaker if two estimates are the same. d. Installation and materials must meet all state and local building codes and contractor is required to obtain necessary permits and have Workers Compensation and Liability insurance. e. Payment within 30 days of receipt of invoice and acceptance and completion of the project.
 
Web Link
RFQ 791-12-03
(http://www.bos.oamm.va.gov/solicitation?number=791-12-03)
 
Record
SN00384495-W 20030730/030728213405 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.