Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 30, 2003 FBO #0639
SOLICITATION NOTICE

U -- ASME Boiler and Pressure Vessel Code Section XI Course

Notice Date
8/28/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
Nuclear Regulatory Commission, Office of Administration, Division of Contracts, 11545 Rockville Pike, Rockville, MD, 20852-2738
 
ZIP Code
20852-2738
 
Solicitation Number
RS-HR-03-373
 
Response Due
9/30/2003
 
Archive Date
10/15/2003
 
Point of Contact
Stephen Pool, Senior Contract Specialist, Phone (301) 415-8168, Fax (301) 415-8157,
 
E-Mail Address
smp2@nrc.gov
 
Small Business Set-Aside
Total Small Business
 
Description
The Nuclear Regulatory Commission is responsible for inspecting the facilities of licensees who generate electrical power from pressurized water reactors and boiling water reactors to determine whether operations are conducted in compliance with Federal regulations and license conditions and to identify conditions which might adversely affect the health and safety of the public or the environment. In-service Inspection per the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI is mandated by the Code of Federal Regulations. NRC inspectors and technical staff review information and inspect licensee facilities and necessitates a keen knowledge of the material. The purpose of this procurement is to obtain a course in In-service Inspection per the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI for NRC Regional Reactor Inspectors and NRC Headquarters technical staff. This course will be presented once in Fiscal Year 04. It is estimated that 20 NRC personnel total would attend the course. The course will provide NRC inspectors with an understanding of the In-service Inspection program per the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI used in the nuclear power industry to monitor primary plant structural integrity, an important parameter for the safe operation of nuclear facilities. The contractor shall furnish the necessary qualified personnel, facilities, materials and services to develop and present a training course of approximately 36 to 40 hours duration. This acquistion is 100% set aside for small businesses. The SBA size standard is $6 million in annual average receipts over the last threee years under NAICS 611430. The NRC anticpates posting the RFQ on or about September 12, 2003. See number notes 1 and 26.
 
Place of Performance
Address: Rockville, MD or NRC regional locations.
 
Record
SN00415489-W 20030830/030828214051 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.