MODIFICATION
41 -- ALTERATION TO HVAC SYSTEM, FORT HAMILTON ARMY GARRISON, 114 WHITE AVENUE, BROOKLYN, NEW YORK
- Notice Date
- 9/18/2003
- Notice Type
- Modification
- Contracting Office
- ACA, Fort Hamilton, Directorate of Contracting, 111 Battery Avenue, Room 115, Brooklyn, NY 11252-5000
- ZIP Code
- 11252-5000
- Solicitation Number
- DABJ21-01-B-0001
- Response Due
- 9/23/2003
- Archive Date
- 11/22/2003
- Point of Contact
- Hillary Gonzalez, 718-630-4794
- E-Mail Address
-
Email your questions to ACA, Fort Hamilton
(gonzalezh@hamilton.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- NA Correct Solicitation Number is DABJ21-03-B-0001. The purpose of this amendment is to reflect the following information: 1. The response date has changed from 17 Sep 2003 to 23 Sep 2003 at 10:00am. 2. Responses to all questions are as follows: QUESTIONS AND ANSWERS 1. QUESTION: SECTION 01110 N SUMMARY OF WORK PAGE 1: ON THE OF THE PAGE BUILDING 114 SOUTH HVAC IN PARA 1.1, LINE 4 DRAWING NO. 17340-003, BLDG 218 BASEMENT SOUTHSIDE. WHAT NUMBER OF BLDG IS CORRECT: EITHER 114 OR 218? ANSWER: BUILDING 114. 2. QUESTION: NO TECHNICAL SPECIFICATIONS AND SCHEDULES ARE AVAILABLE FOR PROJECT FOR PROJECT EQUIPMENT (AIR HANDLING UNITS AND DEHUMIDIFIERS). PROVIDE US, PLEASE WITH TECHNICAL DATA FOR MENTIONED EQUIPMENT. ANSWER: TECHNICAL DATA CAN BE OBTAINED FROM THE FOLLOWING WEBSITES: AIR HANDLING UNIT: HTTP://WWW.COMMERCIAL.CARRIER.COM DEHUMIDIFIER: HTTP://WWW.ALLERGYBUYERSCLUBSHOPPING.COM MITSUBISHI CITY MULTI UNIT: HTTP://WWW.CITYMULTI.COM 3. QUESTION: HOW MANY FLOORS ARE THERE IN BUILDING 114 (AFFECTED AREA)? WHAT IS A HEIGHT OF EACH FLOOR (LEVEL)? WE HAVE TO KNOW THE MENTIONED TO GET A HEIGHT OF INSTALLATION OF CONDENSER LENGTHS OF REFRIGERANT PIPES AND ELECTRICAL CONDUIT. ANSWER: THE BUILDING IS A TWO-STORY STRUCTURE WITH A CELLAR (BASEMENT). AT THE SOUTHEASTERN CORNER OF THE BUILDING, THE DEPTH OF THE VENTILATION PIT IS 8' +/- BELOW GRADE. THE HEIGHT OF THE ROOF ABOVE THE VENTILATION PIT IS 25' +/- ABOVE GRADE. 4. QUESTION: DRWG M-200 TOP, ROOF PLAN: INSTALL MITSUBISHI ELECTRIC MODEL PURY-P250YMFC DRWG M-300 TOP, ROOF PLAN: CONDENSER UNIT: INSTALL MITSUBISHI ELECTRIC MODEL PURY-80 TMU?????? WHICH MODEL IS CORRECT? ANSWER: THE ROOF TOP UNIT IS MODEL PURY-P250YMF-C. 5. QUESTION: THERE IS INSUFFICIENT INFORMATION FOR ELECTRICAL PORTION OF WORK: A. POWER AND VOLTAGE FOR AIR HANDLING UNITS AND DEHUMIDIFIERS B. DATA/ DESCRIPTION OF NEW HVAC POWER PANEL C. ELECTRICAL LINES (NOT SHOWN) TO DUPLEX RECEPTACLE FOR HUMIDIFIERS ANSWERS: A. POWER AND VOLTAGE INFORMATION CAN BE SECURED FROM THE WEBSITES. B. CONTRACTOR TO SIZE NEW POWER PANEL BASED ON TOTAL EQUIPMENT LOAD THAT HE CAN CALCULATE FROM TECHNICAL DATA. C. EXISTING RECEPTACLES SHOWN ON DRAWINGS. DEHUMIDIFIERS ARE TO BE PLUGGED INTO RECEPTACLES.
- Place of Performance
- Address: ACA, Fort Hamilton Directorate of Contracting, 111 Battery Avenue, Room 115 Brooklyn NY
- Zip Code: 11252-5000
- Country: US
- Zip Code: 11252-5000
- Record
- SN00437528-W 20030920/030918213242 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |