Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 20, 2003 FBO #0662
MODIFICATION

41 -- ALTERATION TO HVAC SYSTEM, FORT HAMILTON ARMY GARRISON, 114 WHITE AVENUE, BROOKLYN, NEW YORK

Notice Date
9/18/2003
 
Notice Type
Modification
 
Contracting Office
ACA, Fort Hamilton, Directorate of Contracting, 111 Battery Avenue, Room 115, Brooklyn, NY 11252-5000
 
ZIP Code
11252-5000
 
Solicitation Number
DABJ21-01-B-0001
 
Response Due
9/23/2003
 
Archive Date
11/22/2003
 
Point of Contact
Hillary Gonzalez, 718-630-4794
 
E-Mail Address
Email your questions to ACA, Fort Hamilton
(gonzalezh@hamilton.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
NA Correct Solicitation Number is DABJ21-03-B-0001. The purpose of this amendment is to reflect the following information: 1. The response date has changed from 17 Sep 2003 to 23 Sep 2003 at 10:00am. 2. Responses to all questions are as follows: QUESTIONS AND ANSWERS 1. QUESTION: SECTION 01110 N SUMMARY OF WORK PAGE 1: ON THE OF THE PAGE BUILDING 114 SOUTH HVAC IN PARA 1.1, LINE 4 DRAWING NO. 17340-003, BLDG 218 BASEMENT SOUTHSIDE. WHAT NUMBER OF BLDG IS CORRECT: EITHER 114 OR 218? ANSWER: BUILDING 114. 2. QUESTION: NO TECHNICAL SPECIFICATIONS AND SCHEDULES ARE AVAILABLE FOR PROJECT FOR PROJECT EQUIPMENT (AIR HANDLING UNITS AND DEHUMIDIFIERS). PROVIDE US, PLEASE WITH TECHNICAL DATA FOR MENTIONED EQUIPMENT. ANSWER: TECHNICAL DATA CAN BE OBTAINED FROM THE FOLLOWING WEBSITES: AIR HANDLING UNIT: HTTP://WWW.COMMERCIAL.CARRIER.COM DEHUMIDIFIER: HTTP://WWW.ALLERGYBUYERSCLUBSHOPPING.COM MITSUBISHI CITY MULTI UNIT: HTTP://WWW.CITYMULTI.COM 3. QUESTION: HOW MANY FLOORS ARE THERE IN BUILDING 114 (AFFECTED AREA)? WHAT IS A HEIGHT OF EACH FLOOR (LEVEL)? WE HAVE TO KNOW THE MENTIONED TO GET A HEIGHT OF INSTALLATION OF CONDENSER LENGTHS OF REFRIGERANT PIPES AND ELECTRICAL CONDUIT. ANSWER: THE BUILDING IS A TWO-STORY STRUCTURE WITH A CELLAR (BASEMENT). AT THE SOUTHEASTERN CORNER OF THE BUILDING, THE DEPTH OF THE VENTILATION PIT IS 8' +/- BELOW GRADE. THE HEIGHT OF THE ROOF ABOVE THE VENTILATION PIT IS 25' +/- ABOVE GRADE. 4. QUESTION: DRWG M-200 TOP, ROOF PLAN: INSTALL MITSUBISHI ELECTRIC MODEL PURY-P250YMFC DRWG M-300 TOP, ROOF PLAN: CONDENSER UNIT: INSTALL MITSUBISHI ELECTRIC MODEL PURY-80 TMU?????? WHICH MODEL IS CORRECT? ANSWER: THE ROOF TOP UNIT IS MODEL PURY-P250YMF-C. 5. QUESTION: THERE IS INSUFFICIENT INFORMATION FOR ELECTRICAL PORTION OF WORK: A. POWER AND VOLTAGE FOR AIR HANDLING UNITS AND DEHUMIDIFIERS B. DATA/ DESCRIPTION OF NEW HVAC POWER PANEL C. ELECTRICAL LINES (NOT SHOWN) TO DUPLEX RECEPTACLE FOR HUMIDIFIERS ANSWERS: A. POWER AND VOLTAGE INFORMATION CAN BE SECURED FROM THE WEBSITES. B. CONTRACTOR TO SIZE NEW POWER PANEL BASED ON TOTAL EQUIPMENT LOAD THAT HE CAN CALCULATE FROM TECHNICAL DATA. C. EXISTING RECEPTACLES SHOWN ON DRAWINGS. DEHUMIDIFIERS ARE TO BE PLUGGED INTO RECEPTACLES.
 
Place of Performance
Address: ACA, Fort Hamilton Directorate of Contracting, 111 Battery Avenue, Room 115 Brooklyn NY
Zip Code: 11252-5000
Country: US
 
Record
SN00437528-W 20030920/030918213242 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.