MODIFICATION
Y -- Highway Construction: WA PRA-MORA 10(10), STATE ROUTE 123, PHASE 1
- Notice Date
- 10/14/2003
- Notice Type
- Modification
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, WA, 98661-3801
- ZIP Code
- 98661-3801
- Solicitation Number
- DTFH70-04-B-00001
- Response Due
- 4/15/2004
- Point of Contact
- Contracts Office, Western Federal Lands Highway Division, Phone (360)619-7520, Fax (360)619-7932,
- E-Mail Address
-
contracts@wfl.fha.dot.gov
- Description
- WA PRA-MORA 10(10), STATE ROUTE 123, PHASE I, Mount Rainier National Park, Pierce & Lewis counties, Washington. BY ISSUE OF THIS MODIFICATION WE ANNOUNCE THIS SOLICITATION IS AVAILABLE FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS. This project will be bid with TWO SCHEDULES, Schedule A and Schedule B. This WORK CONSISTS OF 8.5 km of grading, drainage, recycle aggregate, asphalt, paving, buttresses, retaining walls, rails, & pit development. The project consists of construction survey & staking; contractor sampling & testing; construction schedules; blasting consultant; 6,000 m soil erosion control devices; 20,000 cu m watering for dust control; 5.6 ha clearing & grubbing; 24 ea removal of structures & obstructions; 10,000 cu m excavation & embankment; 7,000 sq m earthwork geotextiles; 2,300 sq m roadway obliteration; 8,000 sq m scarify asphalt surface; 200 cu m riprap; 1,000 sq m MSE walls; 75,000 cu m rock buttresses; 11,000 t untreated aggregate courses; 250 cu m recycled aggregate course; 400 cu m aggregate topsoil course; 11,000 t hot asphalt concrete pavement; 2,200 t minor hot asphalt concrete; 20 t asphalt tack coat; 50,500 sq m continuous cold recycled asphalt base course; 200 m painting bridge railing; 20 ea concrete headwalls; 200 m culverts; 190 m underdrains; 70 m curb; 100 m horizontal drains; 180 sq m sidewalk; 200 m guardrail; 3,000 cu m topsoil; 78 sq m permanent traffic control devices; 50,000 m permanent pavement markings; 2,600 flagger hours; 200 pilot car hours; 2 ea signals; and other smaller items of work. Project is located approximately 25 km North of Packwood, Washington. Work shall be completed by July 2006 (Schedule B) or August 2006 (Schedule A). Estimated price range is between $5,000,000 and $10,000,000. PRELIMINARY PLANS CURRENTLY AVAILABLE for download by accessing FedBizOpps at http://www1.eps.gov/spg/dot/fhwa/wfl/postdate_1.html and selecting the above project number and title. When solicitation documents are issued, THE INVITATION FOR BID (specifications) and bidder?s packet will also be in electronic format only at the above site. Pending finalization of details to make plans available electronically, plans will only be available in paper format. REQUEST PLANS by e-mail to contracts@wfl.fha.dot.gov, or by fax to (360)619-7932. The following applies only to Minority, Women-Owned and Disadvantaged Business Enterprises (DBEs): The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. The DOT Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT?s Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at prime rate. For further information about the Bonding Assistance Program, call (800) 532-1169. Internet address: http://osdbuweb.dot.gov
- Place of Performance
- Address: Project is located approximately 25 km north of Packwood, Washington.
- Record
- SN00451967-W 20031016/031014213129 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |