MODIFICATION
Y -- Replace Hydrant Fuel System, SGBP 050017, Offutt AFB, Nebraska
- Notice Date
- 10/28/2003
- Notice Type
- Modification
- Contracting Office
- US Army Corps of Engineer - Omaha District, 106 S. 15th Street, Omaha, NE 68102-1618
- ZIP Code
- 68102-1618
- Solicitation Number
- DACA45-03-R-0051
- Response Due
- 1/8/2004
- Archive Date
- 3/8/2004
- Point of Contact
- Cindy Siford, 402-221-4824
- E-Mail Address
-
Email your questions to US Army Corps of Engineer - Omaha District
(cindy.m.siford@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- NA Site Visit information has been changed to read as follows: A Site Visit will be conducted on 11 December 2003 at 1000 hrs. To facilitate entry into Offutt AFB, the group will meet at the Willow Lakes Golf Course, 12301 S. 25th Street, Bellevue, NE, located midway between Highway 370 and Capehart Road. Air Force Tr ansportation will be used to visit the construction site. Photo Identification will be required for entrance on to the base. All Contractors planning to attend the site visit must provide the requested information listed below for security review by the Air Force. Requests to attend the site visit must be made a minimum of seven (7) days in advance of the site visit date: Project Information has been changed to read as follows: (In Approx. quantities) The work will include a new Hydrant Fuel Pumphouse (3500 square feet single story pump room with a control room to house the control panels, small latrine, and mechanical room; CMU exterior walls and standing seam metal roof; five (5) 125 HP fueling pumps to provide a 2400 GPM hydrant fueling system), two (2) 10,000 BBL fuel storage tanks with concrete containment dikes, eighteen (18) hydrant fuel pits, 7000 LF of 12-inch fuel distribution piping, 4000 gallon product recovery tank, cathodic protection (impr essed current) for fuel piping and fuel storage tanks, cathodic protection (galvanic anode) for all other metallic lines and structures, two (2) truck fill stands, the extension of the existing fuel transfer line to the new pumphouse, the extension of exis ting fuel piping from Pumphouse 531 to the new fuel distribution loop, 210 feet 6-inch sewer line, 125 feet 4-inch sewer line, 800 feet 8-inch water line and 80 LF of 2-inch water service line), underground electrical distribution and lighting, 300Kw elect rical generator, airfield pavement removals and replacement (15,500 square yards of 16-22 inches PCC with 18 inches of rigid base course), 450 feet of new FE-6 type chain-link security fence, and demolition of existing Pumphouses 528 and 529 (including rem oval of twelve (12) - 50,000 gallon underground fuel storage tanks, one (1) - 10,000 gallon fiberglass site containment underground storage tank, and two (2) - 2,000 gallon product recovery underground storage tanks). All other information remains unchanged. For the most current information on this project, visit the Omaha District Website at http://ebs-nwo.wes.army.mil. Those interested in receiving a copy of this solicitation must register through the Omaha District website.
- Place of Performance
- Address: US Army Corps of Engineer - Omaha District 106 S. 15th Street, Omaha NE
- Zip Code: 68102-1618
- Country: US
- Zip Code: 68102-1618
- Record
- SN00460983-W 20031030/031028213333 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |