Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 31, 2003 FBO #0703
SOLICITATION NOTICE

Y -- CONSTRUCTION OF STREAM BANK PROTECTION FOR PETITE SALINE CREEK/BELLAIR BRIDGE

Notice Date
10/29/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
US Army Engineer District, Kansas City, ATTN: CENWK-CT, 700 Federal Building 60l East 12th Street, Kansas City, MO 64106-2896
 
ZIP Code
64106-2896
 
Solicitation Number
W912DQ-04-B-0001
 
Response Due
12/9/2003
 
Archive Date
2/7/2004
 
Point of Contact
Rosalind M. Whitfield, (816)983-3923
 
E-Mail Address
Email your questions to US Army Engineer District, Kansas City
(rosalind.m.whitfield@nwk02.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
NA The proposed project is a Section 14 Emergency Stream Bank Stabilization Project on the Petite Saline Creek, upstream and downstream of the Bellair Bridge, in Cooper County, Missouri. Work will include stabilizing approximately 530 linear feet of the left stream bank and 80 linear feet of the right stream bank (approximately 610 linear feet total)using approximately 2020 tons of stone. Associated work includes clearing and grading temporary access routes, and the grading, excavation, and fill work needed to prepare bank slopes for the revetment. The contractor work and services includes but not limited to mobilization, demobilization, site utilities and facilities, all site survey work, clearing and grubbing, tree and brush removal, transport and unloadin g at disposal site, snagging, cutting, clearing drift and dead trees from river change as needed, all earthwork and associate earth hauling, construction of access lanes and ramps, site restoration and grading, tree planting, grass seeding and mulching, pr ovide 2020 ton graded stone MoDOT Type 2 Quarry Run Stone, testing and emplacement of such stone. The estimated construction cost is $100,000 to $250,000. A Pre-Bid Conference/Site Visit is scheduled for 24 November 2003 at 10:00 a.m. at Cooper County, M issouri/Bellair Bridge. Estimated time of completion of project is 90 days from Notice To Proceed. This solicitation will be web based and will be available on or about 17 November 2003. Registration will be required to download the solicitation and any amendments at the U.S. Army Corps of Engineers, Kansas City District website at http://www.nwk.usace .army.mil/contract/contract.html. Bids are due 9 December 2003. The successful bidder will perform, in accordance with the provisions of Clauses 52.219-14, Limitations on Subcontracting, at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. A subcontracting plan is required with this submittal. This is a firm fixed price contract. To be eligible for contract award, a firm must be registered in the DoD Central Contractor Registration (CCR). Registe r via the CCR Internet site at http://www.ccr.gov or by contracting the DoD Electronic Commerce Information Center at 1-800-334-3414. The North American Industry Classification System (NAICS) code for this action is 238190. Question of a technical nature may be addressed to Mary Hix at 816-983-3233; questions of a contractual nature may be addressed to Robert Williams at 816-983-3843.
 
Place of Performance
Address: US Army Engineer District, Kansas City ATTN: CENWK-CT, 700 Federal Building 60l East 12th Street Kansas City MO
Zip Code: 64106-2896
Country: US
 
Record
SN00461572-W 20031031/031029213322 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.