MODIFICATION
66 -- DC Nullmeter
- Notice Date
- 3/5/2004
- Notice Type
- Modification
- NAICS
- 334515
— Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, AFMETCAL, 813 Irving Wick Dr. W., Heath, OH, 43056-6116
- ZIP Code
- 43056-6116
- Solicitation Number
- FY2333-04-Q-0022
- Response Due
- 3/15/2004
- Archive Date
- 12/31/2004
- Point of Contact
- Lisa Engle, Contract Specialist, Phone 740-788-5049, Fax 740-788-5157, - Glenna Pound, Contracting Officer (Location Admin), Phone 740-788-5043, Fax 740-788-5157,
- E-Mail Address
-
Lisa.Engle@Afmetcal.af.mil, glenna.pound@afmetcal.af.mil
- Description
- The purpose of the modification is to revise the requirements previously posted on 09 Feb 2004. as solicitation number number FY2333-04-Q-0022, DC Nullmeter. This requirement has been changed as follows. This requirement is for 38 each, DC Nullmeters, Data and an Extended Five (5) Year Warranty, in accordance with Purchase Description number 1M-04-MLEE-RR-26, Revision 1, dated 17 October 2003, and available at this site. The data requirement DD1423-1 has been changed. A total of 43 manuals are required. Solicitation also includes a FY05 Option quantity of 0-45 each. The requirement for a bid proposal sample had been deleted. A First Article requirement has been added. One first article unit shall be delivered within 180 days from the date of contract. First Article testing of the unit may take up to 45 days after receipt at AFMETCAL, Heath OH. The First Article Unit will be tested to determine compliance with all of the characteristics listed in the Purchase Description 1M-04-MLEE-RR-26, Revision 1, dated 17 October 2003. Items delivered under any resulting contract must conform to the approved first article unit submitted. Delivery of the production units shall be a minimum of 3 each, maximum of 5 each to be delivered within 45 days of acceptance of the first article unit. Delivery shall continue at this rate until complete. Production units will be tested for compliance. Testing may take up to 45 days to complete. Payment will not be processed until units have passed acceptance testing. Offers are due by 15 March 2004 at 4:00 PM EST to: Lisa Engle, AFMETCAL Det 1/MLK, 813 Irving-Wick Dr W, Bldg. 2, Heath OH 43056-6116. Facsimile submissions to 740-788-5157 are permissible with the follow-up of an original sent by mail or submit by email to lisa.engle@afmetcal.af.mil. Any offer or modifications to the offer received after the exact time specified for receipt of offers/quotes may not be considered. All contractors must be registered in the Central Contractor Registration (CCR) Database. All responsible sources may submit an offer, which shall be considered by this agency. Please see the original posting, the purchase description, and the data requirements which are available at this site.
- Web Link
-
Link to FedBizOpps document.
(http://www.eps.gov/spg/USAF/AFMC/AFMETCAL/FY2333-04-Q-0022/listing.html)
- Record
- SN00538388-F 20040307/040305233734 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |