MODIFICATION
Z -- Repairs and improvements to several buildings at the Defense Acquisition University Fort Belvoir Campus.
- Notice Date
- 4/8/2004
- Notice Type
- Modification
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- ACA, Capital District Contracting Center, Directorate of Contracting, 9410 Jackson Loop, Suite 101, Fort Belvoir, VA 22060-5116
- ZIP Code
- 22060-5116
- Solicitation Number
- W91QV1-04-T-0057
- Response Due
- 4/21/2004
- Archive Date
- 6/20/2004
- Point of Contact
- Beverly A. Greene, 703-806-4428
- E-Mail Address
-
Email your questions to ACA, Capital District Contracting Center
(beverly_a_greene@belvoir.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- The combined synopsis/solicitation for the repair and improvements to several buidlings at the Defense Acquisition University Fort Belvoir Campus is hereby modified to change the statement of work as follows and extend the closing date to 21 April 20 04 at 4:00pm. 1. Handicap access and support issues: (a) Install push buttons, made by Dor-O-Matic with Senior Swing, that meet ADA standards for the following bathrooms and are similar to the exterior door handicap push button access capability. First f loor bathrooms in buildings 204, 205, 206, 207, and 208, and 209. (b) Install a new threshold in buildings 204 and 205 1st floor womens bathrooms between the hallway and the bathroom in order to allow smooth entry by a wheelchair. (c) Install a handicap rail in the large, handicap in the large, handicap bathroom stall in the following bathroom: building 208 1st floor mens room. 2. Replace the following external building doors with similar solid core wood doors. Each will have a glass opening for eye-lev el viewing. The area of the glass will be not less or greater than ten percent of the current glass area, unless approved by the government POC. (A) All 2nd floor fire exit doors for buildings 202, 204, 205, 207, and 209. Installation will include new pa nic bars, door closers, and nonremovable hinges. (b) Two external doors for the Waelchli Room (only the door on the north side facing buidling 205 should have a glass area). Installation will include a new frame with metal jamb and Von Duprin panic bars. Doors and jambs will be painted. (c) The single door leading into the storage area at the west end of building 208 (this door will not have a glass area). Install a threshold on the adjacent door that leads into the 208 basement. 3. Replace the following external doors with new metal doors, including closers and panic bars (all doors will have a glass viewing area except where noted): (a) Single door at the east end of building 205 that leads out from the Wellness Center; also the frame must be replaced on this door. (b) Double door at the west end of building 206 from the maintenance area. This door does not require a panic bar. Glass insert only on the right door. (c) Both ends of buildings 204 and 209 and the east end of building 207. The single doors on the east end of 204 and 207 require a new frame. 4. Install a metal louvered door with a glass insert in the open door area on the west side of building 226. 5. Replace the two wood windows on the side of the 207 west end doors. The windows should be viny l and fit in the same 27 inch x 29 1/2inch opening. 6. Install a glass door in the lobby of building 226 with closer to replace the wood door that leads to the 2nd floor. The door should be similar to the glass door in the same area that leads to the Libra ry. 7.All doors will be painted using one coat of primer and two finishing coats. 8. Building 226 bathrooms (a) 1st Floor mens room: (i) Remove the wall between the bathroom and room 101 and install a new wall that expands the bathroom up to the left edge of the window in room 101. Also remove the wall between room 101 and 102 and adjust all area to make one large office area. The current door leading into room 101 will be removed and a wall will be constructed to match existing wall. Contractor will utili ze carpet provided by DAU to fill carpet patch areas created by the wall removal. (ii) Install new wall tile using the building 209 first floor bathroom as a baseline. The height of the tile will be approximately 48 inches. Color will be selected by the go vernment POC prior to installation. (iii) Paint all wall area above the new tile and all ceiling areas. Color TBD. (iv) Install one each new paper towel dispenser, trash container, and soap pump dispensers. The paper towel and trash containers will be ins talled internal and flush with the plan of the wall. The soap dispenser will be part of the new vanity. (v) Replace the existing ceiling and vanity lights and i nstall two additional ceiling fixtures. (vi) Install four new urinal and new non-metal dividers between each of the urinals on the wall adjacent to the hallway. Add 2 commodes/stalls and install the total of four stalls on the outside exterior wall at the end of the bathroom away from the entry door. (vii) Install a new vanity with 2 sinks and mirror similar to the vanity in the 1st floor building 205 ladies room. The mirror should cover an area as wide as the vanity/sink area. The new vanity area will be t he current location of the urinals. b. 1st floor ladies room (1) Replicate 8a (ii)-(v)and (vii) (2) Eliminate the three sinks on the wall with the stalls. (3) Install two additional stalls adjacent to the existing stalls. c. 2nd floor bathrooms: (1) Implem ent all common improvements noted in 8a(ii)-(v) and (vii). (20 Add two urinals to the mens rooms by removing the sinks on the same wall as existing urinals. d. Each of the four doors from the hallway into the bathrooms will be replaced with a similar solid wood core door; the finish will be matched to the other hallway office doors. The 1st floor mens room door will be changed to open from the opposite direction. e. All electrical switches and outlets will be moved to accommodate the changes in each bathroo m. f. All bathroom partitions will be replaced with partitions that are solid phonolic, color is TBD. g. Exposed floor to ceiling pipes in the bathrooms will be boxed to facilitate tile installation. h. All new toilets will be floor-mounted, rather than wa ll mounted. 9. Paint: All exterior paint will be McCormick super white 27100; interior bathrooms paint will be McCormick designer white 18012. NOTE: Government POCs are Dave Scibetta 703-805-2151 and Gary Hitt 703-805-4458. My e-mail address is beverly_a_g reene@belvoir.army.mil
- Place of Performance
- Address: ACA, Capital District Contracting Center Directorate of Contracting, 9410 Jackson Loop, Suite 101 Fort Belvoir VA
- Zip Code: 22060-5116
- Country: US
- Zip Code: 22060-5116
- Record
- SN00562555-W 20040410/040408212219 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |