C -- ARCHITECTURAL AND ENGINEERING SERVICES

Notice Date
5/10/2004
 
Notice Type
Modification
 
NAICS
541310 — Architectural Services
 
Contracting Office
Department of the Navy, Office of Naval Research, Naval Research Laboratory, 4555 Overlook Ave. S.W., Washington, DC, 20375
 
ZIP Code
20375
 
Solicitation Number
N00173-04-R-CB03
 
Response Due
6/1/2004
 
Archive Date
6/16/2004
 
Point of Contact
Cheryl Burkhardt, Contract Specialist, Phone 202-767-6542, Fax 202-767-6197,
 
E-Mail Address
burkhardt@contracts.nrl.navy.mil
 
Description
This notice modifies the previous synopsis that was posted on May 4, 2004 of the FedBizOpps. The following questions are addressed with an individual response: QUESTION 1 What is the appropriate response to item (5) which states that contractors will be evaluated based on their location in the general geographic area of the project? ANSWER 1 The appropriate geographic area is between 180 to 200 miles from the Naval Research Laboratory (NRL). QUESTION 2 Is there a preference for an architect or engineer to lead this team as prime? ANSWER 2 We do not have a preference as to whether the lead is an engineering or architectural firm. QUESTION 3 Is this a new or existing contract? ANSWER 3 These are new contracts. There have been more than one contracts of a similar nature. QUESTION 4 Will you be holding presentations or interviews following a shorlist or will you be awarding directly from the submissions? If there is an interview, what is the anticipated date for that? ANSWER 4 Interviews are held with the firms that are slated. These are held within a month of the approval of the Slate Board Report. The goal is to have the Slate Board Report approved within a month of the closing date of the Announcement. QUESTION 5 What is the anticipated date of award for the contracts? ANSWER 5 Award is approximately three (3) months from the closing date of the Announcement. QUESTION 6 Is there any duct cleaning or mold remediation jobs involved with the renovation and replacement of HVAC systems? ANSWER 6 None is expected for the lead projects. SUBMITTALS The correct submittals for these projects are the 254 and 255 only.
 
Place of Performance
Address: Contractor Facility
 
Record
SN00583318-W 20040512/040510212439 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.