SOLICITATION NOTICE
Y -- Construction Dredging, 42-Foot Project, Fisherman Channel through Lummus Turning Basin, Maintenance Dredging, 36-Foot Project, Cut-1 through Main Turning Basin, Miami Harbor, Dade County, Florida
- Notice Date
- 5/23/2003
- Notice Type
- Solicitation Notice
- Contracting Office
- U.S. Army Engineer District, Jacksonville - Civil, P.O. Box 4970, Jacksonville, FL 32232-0019
- ZIP Code
- 32232-0019
- Solicitation Number
- DACW17-03-R-0016
- Response Due
- 8/6/2003
- Archive Date
- 9/1/2004
- Point of Contact
- Deidra Cox, 904-232-1215
- E-Mail Address
-
U.S. Army Engineer District, Jacksonville - Civil
(deidra.w.cox@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- NA A proposal may be submitted for either Alternate A, Alternate B, or both. Alternate A work includes construction dredging of approximately 1,107,000 cubic yards of unclassified material from Fisherman Channel through Lummus Turning Basin to a required dep th of 42-foot plus 1-foot allowable overdepth with placement at Ocean Dredged Material Disposal Site (ODMDS). Option 1 work includes maintenance dredging of approximately 210,000 cubic yards of shoal material from Cut-3 through Main Turning Basin to requi red depth plus 1-foot allowable overdepth with placement at ODMDS, Option 2 work includes construction dredging of approximately 194,000 cubic yards of unclassified material from berthing area adjacent to Fisherman Channel and Lummus Turning Basin to 42-fo ot required depth plus 1-foot allowable overdepth, with placement at the ODMDS. Option 3 work includes construction dredging of approximately 5,000 cubic yards of unclassified material from Dodge Island Cut berthing area to 34-foot required depth plus 1-fo ot allowable overdepth, with placement at the ODMDS. Option 4 work includes maintenance dredging approximately 22,000 cubic yards from Cut-1 and Cut-2 and placing in a separate sand cell within Virginia Key Disposal area. Option 4 work also includes the co nstruction of the sand cell within Virginia Key Disposal area complete with dike reinforcement, drainage structures and seeding. Option 5 work includes maintenance dredging approximately 22,000 cubic yards from Cut-1 and Cut-2 and placing at the ODMDS. Con struction dredging work also includes Drilling and Blasting, Endangered Species Observers (Hopper Dredges Only), turbidity monitoring, vibration monitoring/control activities, and Dolphin/Manatee Watch Plan Activities. Maintenance dredging work includes tu rbidity monitoring and Species Observers (Hopper Dredges Only). The Alternate A (All Material Off-Shore) Base Construction Performance Period is 332 calendar days (does not include 30 days mob/demobilization); Option 1 is 40 calendar days; Option 2 is 85 calendar days; Option 3 is 17 calendar days; Option 4 (Upland Disposal Sand Cell Beach Quality for Placement by Sponsor at a later date) is 39 calendar days; for a total of 513. However, Option 5 (Upland Disposal Mixed) is 18 calendar days. Therefore, i f Option 5 is awarded instead of Option 4, the total calendar days for base, Option 1, Option 2, Option 3, and Option 5 is 492. Alternate B work includes construction dredging of approximately 1,107,000 cubic yards of unclassified material from Fisherman Channel through Lummus Turning Basin to a required depth of 42-foot plus 1-foot allowable overdepth with placement in Virgina key disposal area. Option 1 work includes maintenance dredging of approximately 210,000 cubic yards of shoal material from Cut-3 t hrough Main Turning Basin to required depth plus 1-foot allowable overdepth with placement in the Virginia Key Disposal area. Option 2 work includes construction dredging of approximately 194,000 cubic yards of unclassified material from berthing areas ad jacent to Fisherman Channel and Lummus Island Turning Basin to 42-foot required depth plus 1-foot allowable overdepth with placement in Virginia Key Disposal area. Option 3 work includes construction dredging of approximately 5,000 cubic yards of unclassi fied material from Dodge Island Cut Berthing Area to 34-foot required depth plus 1-foot allowable overdepth with placement in Virginia Key Disposal area. Option 4 work includes maintenance dredging approximately 22,000 cubic yards from Cut-1 and Cut-2 and placing in a separate sand cell within Virginia Key Disposal area. Option 4 work also includes the construction of the sand cell complete with dike reinforcement, drainage structures and seeding. Option 5 work includes maintenance dredging approximately 22 ,000 cubic yards from Cut-1 and Cut-2 and placing at the Virginia Key Disposal area. Construction dredging work also includes Drilling and Blasting, Endangere d Species Observers (Hopper dredges only), turbidity monitoring, vibration monitoring/control activities, and Dolphin/Manatee Watch Plan Activities. Maintenance dredging work includes turbidity monitoring and Species Observers (Hopper dredges only). Prepar e/construct dikes and weirs to receive all material in Virginia Key Disposal Area located approximately 1.0 mile south of Miami Harbor Fisherman Channel. The Alternate B (All Material Upland) Base Construction Performance Period is 328 calendar days (does not include 30 days mob/demobilization); Option 1 is 33 calendar days; Option 2 is 83 calendar days; Option 3 is 16 calendar days; Option 4 (Upland Disposal Sand Cell Beach Quality for Placement by Sponsor at a later date) is 39 calendar days; for a total of 499. However, Option 5 (Upland Disposal Mixed) is 18 calendar days. Therefore, if Option 5 is awarded instead of Option 4, the total calendar days for base, Option 1, Option 2, Option 3, and Option 5 is 478. Magnitude of construction is between $2 5,000,000.00 and $100,000,000.00. Award will be made to the offeror whose proposal represents the best value to the Government. The Contracting Officer will use a trade-off process to determine which offer represents the best value to the Government. Al l evaluation factors other than price, when combined, are significantly more important than price. The following factors will be used to determine best value: Technical Merit, Past Performance, and Price. The solicitation will be issued on or about June 19, 2003 and proposals will be due on or about August 6, 2003. The solicitation will be posted on our website, and can be downloaded from http://ebs1.saj.usace.army.mil/ebs/AdvertisedSolicitations.asp Any interested offerors must register electronicall y. If you are not registered, the United States government is not responsible for providing you with notifications of any changes to this solicitation. The registration form is located at https://ebs1.saj.usace.army.mil/ebs/AdvertisedSolicitations.asp. This acquisition is an unrestricted procurement being issued pursuant to the Small Business Competitive Demonstration Program. All responsible sources may submit a proposal which will be considered. There will be a price preference for identified HUBZone small business concerns that comply with the requirements of the solicitation as stipulated in FAR 19.1307. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call 1-888-227- 2423 for more information. NAICS Code 237990, size standard $17.5 million. NOTE: THIS NOTICE MAY HAVE POSTED ON WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (23-MAY-2003). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 26-JUN-2004, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link to FedBizOpps document.
(http://www.eps.gov/spg/USA/COE/DACA17/DACW17-03-R-0016/listing.html)
- Place of Performance
- Address: U.S. Army Engineer District, Jacksonville - Civil P.O. Box 4970, Jacksonville FL
- Zip Code: 32232-0019
- Country: US
- Zip Code: 32232-0019
- Record
- SN00610902-F 20040628/040626214116 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |