Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 02, 2004 FBO #0949
SOLICITATION NOTICE

Z -- Repair Band Building, B123

Notice Date
6/30/2004
 
Notice Type
Solicitation Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Air Force, Air Combat Command, 55 CONS, 101 Washington Sq Bldg 40, Offutt AFB, NE, 68113-2107
 
ZIP Code
68113-2107
 
Solicitation Number
FA4600-04-B-0011
 
Response Due
8/16/2004
 
Archive Date
8/31/2004
 
Point of Contact
Lee Smales, Contract Specialist, Phone 402-294-3622, Fax 402-294-4069, - Rex Amicone, Contract Specialist, Phone 402-294-4352, Fax 402-294-4069,
 
E-Mail Address
lee.smales@offutt.af.mil, rex.amicone@offutt.af.mil
 
Small Business Set-Aside
Service-Disabled Veteran-Owned
 
Description
SYNOPSIS for Offutt AFB Projects SGBP 94-0005A2, Repair Band Building Auditorium, Bldg 123; SGPB 94-0005B1, Repair Band Building Stage, Bldg 123; and SGBP 94-0005A3, Repair Band Building Lobby and Exterior, Bldg 123. This is a three-phase project. Phase One has already been completed. Phase Two consists of the renovation to the auditorium (SGBP 94-0005A2) and stage (SGBP 94-0005B1). The scope of Phase Two of this project includes the renovation of a Historic building on Offutt AFB with an area of approximately 4,100 square feet of existing storage and an auditorium. Renovations to the existing areas are office areas and music practice space and will add a new office/library. The following general construction disciplines will be required for this project: masons, carpenters, framers, electrical, mechanical, plumbers, and finish trades. Period of performance for Phase Two is 126 days. Phase Three consist of the renovation of the lobby and exterior of the building (SGBP 94-0005A3). Phase Three of this project includes the renovation of a Historic building on Offutt AFB with an area of approximately 1,260 square feet of existing office, storage and library spaces. Renovations for the exterior of the building will consist of tuck pointing the brick, new sidewalks, painting, and door and window replacement. The following general construction disciplines will be required for this project: masons, carpenters, framers, electrical, mechanical, plumbers, and finish trades. Period of performance for Phase Three is 140 days. All potential bidders are reminded of DFARS 252.204-7004, Required Central Contractor Registration, lack of registration in the CCR will make a bidder ineligible for award. Project Numbers: SGBP 94-0005A2 / 94-0005B1 / 94-0005A3 Drawings: OFF-B-5759 Dated 9/6/95 (For SGBP 94-0005A2 and 94-0005B1) OFF-B-5760 Dated 9/6/95 (For SGBP 94-0005A3) Project Magnitude: $500,000 to $1,000,000 NAICS Code: 236220 SBA Size Standard: $28.5M THIS PROCUREMENT ACTION IS SET ASIDE 100% FOR SERVICE DISABLED VETREAN OWNED SMALL BUSINESS CONCERNS ONLY. Drawings and Specifications will be available via email or FAX request only! Please submit your requests with mailing address and a contact person to lee.smales@offutt.af.mil or by FAX to 402-294-4069. Phone requests will not be accepted. The estimated release date of this solicitation is scheduled on or around 16 Jul 04. A site visit will be conducted for this project and attendance is highly encouraged. A special notice will be posted to this web site with specific instructions and submission deadlines for attendance.
 
Place of Performance
Address: OFFUTT AFB, NE
Zip Code: 68113
Country: USA
 
Record
SN00612834-W 20040702/040630211907 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.