Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 25, 2004 FBO #0972
SOLICITATION NOTICE

Y -- Rehabilitation and Construction of Rhododendron Trail, Ocoee Whitewater Center

Notice Date
7/23/2004
 
Notice Type
Solicitation Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-8 Cherokee National Forest, P.O. Box 2010, Cleveland, TN, 37320
 
ZIP Code
37320
 
Solicitation Number
IFB-SAZ-04-04-38
 
Response Due
8/31/2004
 
Point of Contact
James E. McDonald, Contract Specialist, Phone 423-476-9711, - Nina Barrow, Procurement Assistant, Phone 423-476-9706,
 
E-Mail Address
emcdonald@fs.fed.us, nbarrow@fs.fed.us
 
Description
PROJECT DESCRIPTION: Contractor shall provide all personnel, supervision, equipment, tools, materials, supplies, and incidentals necessary to rehabilitate approximately 950 feet of the Rhododendron Trail at the Ocoee Whitewater Center. In addition, contractor shall construct one wooden truss bridge, 300 ft. of completed 6 ft wide trail surface and 265 ft of 7 ft clear width elevated boardwalk. Additive Item 1: Construct 1000 ft. of 6 ft wide trail and one wooden truss bridge, site adjustment at TVA No. 3 powerhouse concrete bridge. Additive Item 2: Construct 1000 ft of 6 ft finished treadwidth trail, one 20 ft x 6 ft rock wall. Additive Item 3: Construct 1000 ft of trail and one log stringer bridge. Additive Item 4: Construct 1200 ft of 6 ft finished treadwidth and two log stringer bridges. Additive Item 5: Construct 700 ft of finished treadwidth and connect with elevated boardwalk. Note: Contractor?s trail width during construction phase can be up to 7 ft wide for equipment. Contract time is 180 calendar days from effective date of Notice to Proceed. Desired date to start work is 9/27/2004. ESTIMATED PRICE RANGE: between $100,000 and $250,000. PROJECT LOCATION: Cherokee National Forest, in Polk County, Tennessee. From Cleveland, TN, take Hwy 64 East toward Ducktown, TN, approximately 29 miles from Cleveland, to the US Forest Service Ocoee Whitewater Center. One end of the trail shall be located at the river left side of the recreation site across the second bridge, which is downstream of the building. The trail will run along the sideslope from this bridge for 1.3 miles to the concrete bridge at TVA Powerhouse #3. SOLICITATION DOCUMENTS: The solicitation, IFB SAZ 04-04-38, and related documents will be issued via FedBizOpps as an Invitation for Bid and will be available for downloading on or about August 5, 2004. All potential contractors and subcontractors should register on the FedBizOpps website as an Interested Vendor. The Interested Vendor?s List will be the only Bidder?s List maintained for this procurement.
 
Place of Performance
Address: Ocoee Whitewater Center, Rt. 1, Box 285, Copperhill, TN
Zip Code: 37317
Country: USA
 
Record
SN00629294-W 20040725/040723211810 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.