Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 31, 2004 FBO #0978
MODIFICATION

Z -- HVAC Distribution System for Facility 20015

Notice Date
7/29/2004
 
Notice Type
Modification
 
NAICS
238390 — Other Building Finishing Contractors
 
Contracting Office
1940 Allbrook Drive Suite 3 Wright-Patterson AFB, OH, 45433-5309
 
ZIP Code
45433-5309
 
Solicitation Number
FA8601-04-R-0062
 
Response Due
8/18/2004
 
Archive Date
12/15/2004
 
Point of Contact
Thomas J. Kielbaso,(937) 257-6571 extension 4124
 
E-Mail Address
Email your questions to Tom.Kielbaso@wpafb.af.mil
(Tom.Kielbaso@wpafb.af.mil)
 
Small Business Set-Aside
N/A
 
Description
UPDATE: This update is to post Amendment #1 to the solicitation which consists of Addendum #1 to the specifications, establishment of additional options, 3 new drawings, and a change to the site visit date. The date for submission of the proposal is unchanged from 18 Aug 2004. UPDATE: This update is to notify all that an amendment to the solicitation will be posted today, 28 July 2004. Accordingly, the site visit scheduled for today at 0900, has been postponed until 04 Aug 2004, at 0900. This acquisition is for the Replacement of the HVAC Distribution System AFRL Headquarters Facility 20015, Project 920014C. The renovation of AFRL Headquarters is in accordance with the long range Strategic Plan to improve office space to an acceptable standard and maximize efficient utilization of WWII facilities. A major rework of the HVAC system (1970?s vintage) and upgrade of Fire and Life Safety systems is long overdue. In addition to code compliance issues, a new suspended ceiling system, new fire detection and suppression system, new carpet and paint will be installed. Project will be completed in two phases due to the configuration of the air handling units and the lack of temporary office surge space. Special Requirements and Concerns: Tight control of all subcontractors will be imperative for success of this project due to the high profile occupants in the building, HQ AFRL, GAO, and ASC/JA. The construction will be completed in two phases. Occupants will have to relocate to another building during their phase of construction. Contractor will not be able to start work on Phase II until he has completed Phase I, the occupants have moved back to Building 15 and Phase II occupants and their furniture have been relocated. Contract will include maintaining temporary electrical and HVAC systems to occupied portions of the building during construction. Scope also includes hazardous material abatement of asbestos and lead paint. For more information on 04R0062--HVAC Distribution System for Facility 20015 please refer to http://www.pixs.wpafb.af.mil/pixslibr/04R0062/04R0062.asp
 
Web Link
04R0062-HVAC Distribution System for Facility 20015
(http://www.pixs.wpafb.af.mil/pixslibr/04R0062/04R0062.asp)
 
Place of Performance
Address: Wright-Patterson AFB, OH
Zip Code: 45433
Country: United States
 
Record
SN00632942-W 20040731/040729212120 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.