30 -- Power Generation Plant - Camp Solerno, Afghanistan

Notice Date
8/20/2004
 
Notice Type
Modification
 
NAICS
335312 — Motor and Generator Manufacturing
 
Contracting Office
Department of the Army, Army Contracting Agency, ARCENT, Joint Contingency Contracting Office Bagram, Afghanistan, Joint Contingency Contracting Office, APO, AE, 09354
 
ZIP Code
09354
 
Solicitation Number
W913TY-04-R-513
 
Response Due
8/24/2004
 
Archive Date
9/8/2004
 
Point of Contact
Stephen Rogers, Major, Phone DSN 318-231-4746, Fax null,
 
E-Mail Address
rogerss@baf.afgn.army.mil
 
Description
***Must Request Solicitation Package Via Email*** This amendment is issued as a question and answer due to technical difficulties uploading to the Q&A portion of FedBizOps: Question: Do you currently have a covered building with reinforced concrete slabs and concrete footings to miniimize vibration and protect against the elements being prepared by the Corps of Engineers? If so, can you send us plans and specifications? Answer: There is a site picked out on Camp Salerno for the prime power plant. This area has been grubbed and cleared of debri, but that is the extent to which our men will prepare the site. The site is approximately 200' by 200' but can be changed depending on contractor space requirements. There will be no construction at the site done by the Corps of Engineers. Any set-up and designs contemplated by the contractor for the construction/manufacture of protective structures shall be performed by the contractor. Question: We would like to know the elevation of the site. We believe it to be in the range of 4,000 meters. Can you confirm this? Answer: Salerno is at 3700 feet of elevation. ***Please ensure all proposals are sent via email to Major Rogers in addition to Capt. England to ensure it is recieved.*** Send requests to: Capt. Christopher England englandcw@baf.afgn.army.mil Package will be returned the same day. Short Description: The work under this contract consists of supplying and supporting all generator set activities for prime power operations in support of Camp Salerno, Afghanistan. Generator set activities are defined as assessment of power needs, preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, fueling, relocating and recovering generator sets, associated fuel systems (if required), and all transmission/distribution system maintenance including the underground system at Camp Salerno from the generators to the first main breaker of the primary distribution panel. Contractor shall provide all administrative support and logistics required to support contractor personnel except housing, meals, and JP8 fuel which will be provided by the Government. The Contractor shall perform generator set activities twenty-four (24) hours a day, seven (7) days a week including all weekends and holidays. The contractor shall be required to be in compliance with all applicable local ordnances, permits and license requirements. NOTE: THIS NOTICE WAS NOT POSTED TO WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (20-AUG-2004); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/USA/DABM/W913TY/W913TY-04-R-513/listing.html)
 
Place of Performance
Address: Camp Salerno, Afghanistan
Country: Afghanistan
 
Record
SN00649046-F 20040822/040820220324 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.