Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 25, 2004 FBO #1003
MODIFICATION

Z -- John W. Bricker Federal Building, 200 N. High Street, Columbus, OH, Renovation and Parking Garage Repair

Notice Date
6/14/2004
 
Notice Type
Modification
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Property Development Division (5PC), 230 South Dearborn Street, Room 3512, Chicago, IL, 60604
 
ZIP Code
60604
 
Solicitation Number
GS05P04GBC0019
 
Response Due
4/2/2004
 
Point of Contact
Bobbie Tyler, Contracting Officer, Phone (312)886-7875, Fax (312)886-4103, - Leafie Clark, Contract Assistant, Phone 312-353-5897, Fax 312-353-9186,
 
E-Mail Address
bobbie.tyler@gsa.gov, leafie.clark@gsa.gov
 
Description
Columbus, OH, 200 N. High Street, J.W. Bricker Federal Building, Renovation & Parking Garage Repair, GS05P04GBC0019 This Amendment/Modification covers the above referenced solicitation and is hereby amended as follows: 1. The tentative date for release of the Request For Proposal (RFP) package on CD-Rom(specifications & drawings)is May 6, 2004. 2. The anticipated date for receipt of proposals in response to this Request For Proposal (RFP) is June 7, 2004, at 4:00p.m, Chicago time. 3. All other terms and conditions remains the same. ANY FURTHER ANNOUNCEMENTS REGARDING THIS SOLICITATION WILL BE POSTED ON FEDBIZ OPPS AT WWW.EPS.GOV. l LEED Requirements"? For example, we interpret that all requirements listed in Spec Section 01524 Construction Waste Management are to be included in pricing for Option 16 and not the base bid. Is this correct? It would be helpful to be very specific about exactly what are the "Additional LEED Requirements". Response: This option shall include the requirements of the three referenced specification sections only. The intention of labeling this as “additional” requirements refers to the fact that some submittals, testing or documentation is required in the base bid standard product specifications. This work shall remain in the base bid, even though it is also mentioned as a requirement of the LEED specification. The Option price should only include the “additional” testing, or submittals required. Section 01524 is not listed in the description of this option and therefore shall be part of the base bid. As full documentation of the waste management plan is required to be submitted for LEED and Section 01352 any “additional” documentation / copy requirements would become part of the Option. 7. Is it a requirement that the comparable projects were under a general construction vs. other delivery system Response: No, other delivery systems are acceptable as long as the intended level of responsibility is demonstrated and the process and specific roles are explained. 8. The count of more than 1 but maximum 5 comparable projects—is this count for each of the offeror and each key subcontractor or a total for all combined? Response: The requirement is for each key subcontractor 9. Section 01810 Part 1.11 - A.: Please clarify if the CxA meetings shall be conducted weekly, biweekly or monthly. All three of these options currently appear in the specifications. Response: the meetings will probably average biweekly. It is anticipated that there will be less meetings required during the early phases of the project and weekly meetings required during the commissioning phases. 1.2 PROJECT MANUAL A. Section 01100, Summary 1. Per Addendum 1 the dates for the anticipated date for Notice of Award and Notice to Proceed were inverted and should read as follows a. July 16, 2004 - Notice of Award b. August 2004 - Notice to Proceed 2. The Phasing Plan .PDF files included for floors 1 and 2 were corrupt. Attached are current files. 3. Phasing Plans – the furniture systems manufacturer and installers vary at each tenant space. It is the responsibility of the contractor to make themselves familiar with the existing conditions. B. Section 01260, Options 1. Paragraph 3.1 D, per Option No. 4 the removal of existing and installation of new Roller Shades is in the base bid. The Option only includes the purchase of same. All curtains/draperies shall be reinstalled. 2. It is the intention of the Government to make timely Award of all options so as not to impact the overall project schedule. C. Setion 01322, Photographic Documentation 1. Paragraph 3.3, C, provide Construction Period Videos at a frequency of one time during the construction of each tenant space, and as may be needed during construction in specific areas of special interest, concern or as directed by the Contracting Officer. D. Section 08110, Doors and Frames 1. Door Schedule, Doors 6-003 and 6-004, there is no work associated with these doors 2. See item ‘1.3, A’ below under Project Drawings for further clarification of door that are not on the schedule. E. Section 12494 Roller Shades (Option) 1. Paragraph 2.1, A, 2, add item e. to read as follows: "Sun or Shade, a Division of Inside Outfitters." F. Section 15891 Duct Cleaning 1. Paragraph 3.2-7d, it is the intent that this is referring to the ductwork in these areas (Mechanical Rooms and Corridors). This work shall be completed prior to installation of any downstream ductwork, to prevent contamination of new. The individual tenant areas are to be cleaned as you begin work in that area. Under all scenarios, prevent introducing dust and debris into the new ductwork and/or into the tenant spaces. G. Section 15900 1. Paragraph 2.1B, mentions “packaged pump systems” – This refers to the variable flow chilled water system that is being provided by the pump package manufacturers and not a skid mounted pump package. H. Section 15900, HVAC INSTRUMENTATION AND CONTROLS 1. Page 4, Paragraph 2.1.B, add SyncroFlo to the acceptable manufacturers. I. Section 15971, VARIABLE FREQUENCY DRIVES 1. Page 2, Paragraph 2.1.A, add GE/Fuji to the acceptable manufacturers. 2. Page 5, Paragraph 2.11.E, Change “Contactors shall be NEMA rated.” To “Contactors shall be NEMA or IEC rated.” 1.3 PROJECT DRAWINGS A. AD Series Drawings, Demolition Floor Plans, Door Schedules 1. On Addendum #1 paragraph, 1.3 Project drawings, Item E. a. Disregard the response given in addendum #1, to correct the conflict, revise the documents as follows: 2. Revise General Note #17 to read as follows: "EXISTING DOORS IDENTIFIED WITH A DOOR MARK ARE TO RECEIVE HARDWARE MODIFICATIONS OR REPLACEMENT AS PART OF BASE SCOPE OR OPTION #1. REFER TO SPECIFICATION SECTION 01260 FOR DESCRIPTION OF WORK, SECTION 08110 DOOR SCHEDULE, 08712 HARDWARE SCHEDULE AND A1 SERIES DRAWINGS. ALL DOOR NUMBERS IDENTIFIED ON THE DOOR SCHEDULE WITH REMARK #2 ARE PART OF OPTION #1, ALL OTHERS SHALL BE CONSIDERED PART OF BASE SCOPE." B. Drawing No. A1 B1G, A1 1G, A1 2 –7G, A1 8G 1. Revise coded note #14 to read as follows: Existing concrete curb to be cut and removed, refer to new Detail #4 being added to drawing A1 2-7G. 2. Add attached Typical Curb Cut Detail to A1 2-7G C. Drawing No. AG – 0 – 01 1. General Note #5 – the intent is to require the contractor to patch any sprayed on fire proofing that is knocked off in the course of doing work on, near, or attaching to the structure. D. A7 Series Drawings, Reflected Ceiling Plans 1. Access doors are not required in rooms that have an exposed structure. All required wall ratings are shown on the architectural reflected ceiling plans. All access doors in ceilings are non-rated. E. Drawing No. S 1 01 G thru S 108 G A2-1, 1. The following question was listed but was not responded to in addendum #1. a. Plan note 4 on structural drawings, regarding crack repair, states "See repair types 1 and 2 on sheet S 0 02 for required repair procedures". Repair type 1 is for cracks wider than 0.08" and repair type 2 is for cracks narrower than 0.08". Please advise which cracks are wider than 0.08" and which cracks are narrower than 0.08" Response: Referring back to plan note 4 on sheets S101G through S108G, it states in the second sentence that "UNLESS NOTED OTHERWISE, CRACKS ARE LESS THAN 0.08" IN WIDTH." Further, the cracks are generally less than 0.08" in width. Where wider cracks exist, coded notes call out the length of any crack that is wider than 0.08". F. Drawing No. A 1 03 1. On south side of building between col. Lines C & E and 6 & 7 ther is a curtainwall system that is missing a label. This opening should be labeled as type ‘A’. G. Drawing No. AD 1 03 1. Note 13 in the Dining Area should be deleted at this plan location only H. Drawing No. A 1 03 1. Note 15 in the Dining Area should be deleted at this plan location only I. Drawing No. A 1 01 1. Door 01-107, at Vestibule 124A, the frame type should be per J3 on A 6 01 J. Drawing No. A 1 07 1. The walls at room 717h located at the southeast corner shall tie into the storefront per Coded Note #28 K. Drawing No. A 202 1. Curtainwall section is indicated by general notes as an ‘I’ elevation. The floor plan shows this as ‘J1’ elevation. The ‘J1’ reference is correct. L. Drawing No. M – 6 series 1. To clarify, the BMS contractor is required to provide Routers as shown on on the riser diagram on sheet M-600 2. The BMS contractor shall include alarm points for all points indicated on the control diagrams on the M-6 drawings M. Mechanical MD 1 PH 1. To further explain the coded and General Notes; a. At the penthouse, existing pneumatic tubing from existing temperature control panels to pneumatic valve actuators, damper actuators, and misc. pneumatic devices are to be demo in the entirety I they are not being re-used. b. Existing temperature control panels, that are not being re-used for new controls ,and that house pneumatic/electric controls, are to be demolished. These panels are located in front of AHU1 and AHU2. c. Existing conduit and wiring from existing Andover panels to end control devices are to be demo in the entirety. This would apply to any conduit and wiring that would not be reused. TO REQUEST A FAX COPY OF THE FOLLOWING: DRAWING 4-7 G, PHASING PLAN FLOOR 1, AND PHASING PLAN FLOOR 2, PLEASE CONTACT BOBBIE TYLER AT (312) 886-7875 OR EMAIL AT BOBBIE.TYLER@GSA.GOV NOTE: THIS NOTICE MAY HAVE POSTED ON WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (14-JUN-2004). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 23-AUG-2004, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/GSA/PBS/5PCI/GS05P04GBC0019/listing.html)
 
Place of Performance
Address: 200 North High Street Columbus, OH
Zip Code: 43215-0000
Country: U.S.
 
Record
SN00650100-F 20040825/040823214121 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.