FBO DAILY ISSUE OF OCTOBER 06, 2004 FBO #1045
SOURCES SOUGHT

Y -- Substation Testing and Commissioning Services at the Nevada Test Site

Notice Date
10/4/2004
 
Notice Type
Sources Sought
 
NAICS
238210 — Electrical Contractors
 
Contracting Office
Department of Energy, Bechtel Nevada Corp (DOE Contractor), Bechtel Nevada, PO Box 98521, Las Vegas, NV, 89193
 
ZIP Code
89193
 
Solicitation Number
132591-GM-05
 
Response Due
10/12/2004
 
Archive Date
10/27/2004
 
Small Business Set-Aside
Total Small Business
 
Description
STATEMENT OF WORK Background: The Nevada Test Site (NTS) power system is a 138 kV primary power transmission loop, approximately 100 miles in length. The NTS is located remotely (about 60 miles north of Las Vegas, Nevada) from large sources of power and therefore has two distinct power sources. The 138 kV primary power transmission loop is fed from Nevada Power Company (NPC) and the Valley Electric Association (VEA). Source one is a 138 kV transmission line which connects the NTS system to NPC at the Mercury Switching Center (MSC), and a line between Jackass Flat Substation (JF) and MSC provides a feed at that point. The second source to the NTS is tied to the VEA via a 138 kV transmission line which runs from JF to the VEA Substation at Lathrop Wells. This Overall Task Order Subcontract is to furnish the following Technical Services: 1. Provide testing and commissioning services for the Nevada Test Site (NTS) power transmission and distribution systems for new and existing substations, as well as periodic additions and upgrades to these systems. 2. The support will include inspection and testing services to assure that all new and upgraded electrical equipment is functional and operational within industry and manufacturer?s tolerances and is installed in accordance with the design documents. 3. The Testing Firm (Subcontractor) shall provide all material, equipment, labor, and technical supervision to perform such tests and inspections 4. The tests and inspections shall determine suitability for energization of specified equipment and systems. 5. The Subcontractor shall be responsible for implementing all interim and final settings and adjustments on protective devices in accordance with the Contractor?s specified values. 6. The Subcontractor must be familiar with and use Electrocon International?s CAPE programs for relay setting calculations and setting input. 7. The Subcontractor must be familiar with and use the SEL-5010 computerized program for setting the Schweitzer relays.
 
Place of Performance
Address: Nevada Test Site, Mercury, Nevada
Zip Code: 89023
 
Record
SN00688421-W 20041006/041004211630 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.