Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 15, 2004 FBO #1054
MODIFICATION

23 -- Mobile Field Kitchens

Notice Date
10/13/2004
 
Notice Type
Modification
 
NAICS
423990 — Other Miscellaneous Durable Goods Merchant Wholesalers
 
Contracting Office
Department of the Army, Project and Contracting Office, Project and Contracting Office, Iraq, Republican Presidential Compound APO, Baghdad, Iraq, AE, 09316
 
ZIP Code
09316
 
Solicitation Number
W914NS-05-Q-9007
 
Response Due
10/26/2004
 
Archive Date
11/9/2004
 
Point of Contact
Robert Mueller, Contracting Officer, Phone 7033439222,
 
E-Mail Address
robert.mueller@cpa-iq.org
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. (II) Solicitation W914NS-05-Q-9007 is being issued as a request for quote (RFQ). (III) This solicitation incorporates clauses and provisions in effect through the Federal Acquisition Circular 01-24. (IV) This requirement is being synopsized as full and open competition under standard industrial classification code 5012, NAICS Code 423110. The resulting contract will be a Firm Fixed Price type Contract under FAR Part 12 ? Acquisition of Commercial Items. (V) COMMERCIAL ITEM DESCRIPTION: Contractor shall provide a complete and usable end product. Contractor must provide pricing on all items FOB destination for their quotes to be accepted. No alterations, additions, or deletions shall be made unless by prior written approval of the Contracting Officer. All work must meet or exceed acceptable industry standards and codes for the building trades. Items will be listed by line item number, **LINE ITEM 0001** 2 EACH, Mobile Kitchen Trailer - (MKT-90) NSN 7360-01-313-2238 will also consider trailer which has a minimum of 2 burners, can feed 250 people 3 meals a day, can be towed by a 5 ton, and has a refrigeration unit (VII) Place of delivery / performance: Tadji Iraq-38SMC3190208695 Airfreight is not required. Sea shipment is acceptable. ?Shipping shall be included in the unit cost?. All Cost included, Firm-Fixed Price. All duties and tax are the responsibility of the Contractor. PCO Logistics is required to track equipment, materials and goods coming into Iraq under the Re-building Iraq effort. This tracking and inherent accountability process will assist in assuring that all equipment materials and goods are able to cross the borders and move to final destination with minimal delay and at reduced risk. However, in order to accomplish this mission, maximum cooperation is necessary. Prompt notification and compliance with our information requirements will assist in providing advance notice to the point of entry of all inbound shipments. This process affords coordination in the movement of all convoys which will enable improved monitoring and de-conflicted convoy schedule. Prompt notification also improves security coordination through the operations center. To get started follow the following steps: Step One: Upon contract award the contractor is required to provide the necessary logistical information needed by PCO Logistics. This information can be provided and updated as necessary by going to the PCO website (http://www.rebuilding-iraq.net) and logging in by selecting ?Contractor/Vendor Log In? under the Logistic heading. Initial log in will require the user to request a user name and password. Once the username and password is provided the user can identify and grant access to the other members or subcontractors. Should there be any problems with this process contact the Logistics Movement Coordination Center (LMCC) Watch Officer directly at the following e-mail address: pcolmcc@halliburton.com and the necessary assistance will be provided. If the interim process is still in place the contractor will find four (4) forms listed and available under the logistics heading (Logistics Information Requirements Form, Reconstruction Levy Exemption Form, Cargo Plaques and Logistical Support Request). Those forms should be individually completed and, with the exception of the cargo plaque, sent electronically to the above mentioned e-mail address for the LMCC. The first form submitted will be the Logistics Information Requirements Form. The Logistics Information Requirements Form should be completed upon award of contract and updated as necessary. All updates and changes to this form should be sent to the same e-mail address as the original form. Additional contact information is available on the website mentioned above. Always reference the contract number. Step Two: CPA 1-47 CUSTOMS LEVY EXEMPTION AND SHIPMENT REQUIREMENTS FOR RECONSTRUCTION PROJECTS UNDER PROJECT AND CONTRACTING OFFICE (PCO) Effective 15 April 2004 Tariff Regulations pursuant to CPA Orders #54, as amended by Order #70 (Orders #54 and #70 are posted on the website), require commercial importations into Iraq to pay a 5% levy except for food, books, medicine, medical equipment, clothes and oil. Additional exemptions include NGO?s, International Organizations, Reconstruction Projects under PCO, and single exempt donations. Items shipped under this contract are exempt from this ?Levy? provided a completed Reconstruction Levy Exemption Form is attached and included with each invoice and packing slip. The contractor is required to fill out the Reconstruction Levy Exemption Form and attach the duty free form to each shipment of goods under this contract that crosses the border into Iraq in order to qualify for the exemption. The contractor must submit one copy of the completed duty free form and a copy of the first page of the primary contract, for customs verification, to the contracting officer and the PCO Logistics Office at pcocustoms@halliburton.com) 72 hours prior to the planned arrival date at the Iraq point of entry. Step Three: The items being acquired are for Iraqi Reconstruction and as per the ?Packing and Marking Instructions? of this contract, and shall be Packaged and Marked accordingly. Additionally, a Cargo Plaque is available from the website at http://www.rebuilding-iraq.net under the logistics tab located at the top of the page. There is a memorandum posted that explains how to complete the plaques. There are three plaques, one is for shipments arriving into Baghdad International Airport, one is for shipments arriving into the Port of Umm Qasr, and the third one is for all other shipments. The use of these plaques will ensure they are properly identified as PCO shipments and will reduce risk of loss or pilferage. Each shipment must have a cargo plaque affixed to all sides of each container, pallet, or package. The following is information will be provided upon award to assist with the completion of the cargo plaque Primary Contract Number #: W914NS-05-X-XXXX POC for Arrival: Is already identified for our two current locations. Final Destination: This is the final delivery point or location of the end user. Address: Provide as much descriptive detail as possible. Grid Coordinate: If available POC at Final Destination: (Self Explanatory) Name: XXXXX Phone: XXXXX E-mail: XXXXXX Requiring Activity: Who is the Customer (i.e. Ministry of Transportation etc.) Delivery Info: Any specific instructions the vendor or end user may have. Step Four: If this contract has the shipment bound for a PCO warehouse location and will require PCO Logistics to assist in the shipment from the point of entry into Iraq or material handling equipment support at the warehouse, a Logistical Support Request (LSR) must be completed and submitted 48 hours prior to expected movement of the shipment or its arrival at the point of entry. The LSR can be found at the above mentioned web site under the logistics tab. It is the contractor?s responsibility to provide all the requested information mentioned above as well as using the identified cargo plaques in sufficient time to allow for required delivery. Failure to comply with these instructions may result in a delay of the goods and materials being shipped from arriving at their final destination. Delays resulting from failure to follow the above steps may be assigned as the contractor?s responsibility. The Contracting Officer will EVALUATE QUOTES on the basis on the Prices. Required delivery is not later than 90 calendar days from date of award. Quotes must state delivery time Tadji . F.O.B. POINT IS DESTINATION. (VIII) Provision 52.212-1, Instructions to Offerors- Commercial Items applies. (IX) Provision 52-212-2, Evaluation _ Commercial Items applies. Quotes will be evaluated on price. (X) Offerors are required to submit a completed copy of 52.212-3 Offerors Representations and Certifications- Commercial Items with their offer, which can be found at http://www.arnet.gov/far/. (XI) Clause 52.212-4, Contract Terms and Conditions- Commercial Items and any addenda the clause applies to this acquisition. (XII) Clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items applies to the award document. (XIII) N/A. (XIV) N/A. (XV) N/A. (XVI) Quotes will be due to the Project and Contracting Office (PCO) ? Contracting Activity, Republican Presidential Compound, Baghdad, Iraq APO AE 09316, by 26 Oct 04, 4:30 p.m. local time (Baghdad). Due to the limited resources available at the PCO location, please limit your company name or logo to just the cover page of your submission/s. Zip files can not be opened at our locations, so please do not send your quote in this type of a format. (XVII) Point of Contact is Robert.mueller@CPA-IQ.org. Quotes should be sent to the PoC.
 
Place of Performance
Address: Tadji Iraq
Country: Iraq
 
Record
SN00693402-W 20041015/041013211831 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.