SOURCES SOUGHT
99 -- CONSTRUCTION OF CHILLED WATER SYSTEM MODIFICATIONS AT THE AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC), MEMPHIS, TENNESSEE.
- Notice Date
- 10/26/2004
- Notice Type
- Sources Sought
- Contracting Office
- FEDERAL AVIATION ADMINISTRATION, ASO-55 Southern Region (ASO)
- ZIP Code
- 00000
- Solicitation Number
- DTFASO-05-R-00001
- Response Due
- 11/17/2004
- Description
- THIS REQUIREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS CONCERNS. THE CONSTRUCTION INCLUDES THE REMOVAL OF THE EXISTING 4" AND 6" CHILLED WATER BY-PASS PIPING TO EXISTING CHILLER 400. INSTALL NEW 10" TEES WITH ISOLATION VALVES AND INSTALL NEW 6" CHILLED BY-PASS PIPING TO EXISTING CHILLER 400. INSTALLATION OF 6" FLOW METER IN THE NEW BY-PASS SECTION ALONG WITH NEW FLOW CONTROL VALVES AT THE CHILLERS. TEE OFF AND INSTALL A SEPARATE 4" CHILLED WATER SUPPLY AND RETURN PIPING FOR POWER SERVICE BUILDING. CONSTRUCTION ALSO INCLUDES UPGRADING THE CONTROL SYSTEM WITH ADDITIONAL MONITORING REQUIREMENTS. MISCELLANEOUS IMPROVEMENTS IN THE CHILLER ROOM AND ADJACENT BOILER ROOM, WHICH INCLUDES PAINTING, FIRESTOPPING PENETRATIONS, INSTALLATION OF VCT AND LIGHTING. ALL WORK TO BE DONE WITHOUT INTERRUPTION TO THE FACILITY'S AIR CONDITIONING SYSTEM AND WITHOUT INTERRUPTION OF THE OPERATION OF THE ARTCC FACILITY. PERFORMANCE TIME: 90 CALENDAR DAYS. ESTIMATED PRICE: $150,000.00 TO $250,000.00. ALL REQUESTS SHOULD BE FAXED TO TONY ORTIZ @ (404) 305-5774 OR E-MAIL TO tony.c.ortiz@faa.gov.
- Web Link
-
FAA Contract Opportunities
(http://www.asu.faa.gov/faaco/index.cfm?ref=3882)
- Record
- SN00699112-W 20041028/041026211746 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |