Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 05, 2004 FBO #1075
SOURCES SOUGHT

46 -- Equipment for industrial wastewater clarification process

Notice Date
11/3/2004
 
Notice Type
Sources Sought
 
NAICS
333319 — Other Commercial and Service Industry Machinery Manufacturing
 
Contracting Office
TACOM - Anniston, Directorate of Contracting, ATTN: AMSTA-AN-CT, Building 221, 7 Frankford Avenue, Anniston, AL 36201-4199
 
ZIP Code
36201-4199
 
Solicitation Number
W911KF05S0002
 
Response Due
11/8/2004
 
Archive Date
1/7/2005
 
Small Business Set-Aside
N/A
 
Description
Anniston Army Depot, Anniston, Alabama is seeking companies who can provide equipment replacement and/or addition for industrial waste water clarification process. Equipment shall provide adequate and continuous clarification of industrial wastewater. Discharged waters shall meet all permitted state and federal effluent limitations. Equipment shall provide short hydraulic retention time (HRT) and construction shall have a small footprint. Chemical usage costs shall be less than or equal to current chemical usage costs. Equipment shall be reliable and easy to operate. ACCEPTABLE QUALITY LEVEL: The Industrial Wastewater Treatment Plant is composed of two separate waste streams. One waste stream is discharge from steam cleaning operations. It consists of oils, greases, dirt, and detergents. Flow rate is approximately 100,000 GPD. The other waste stream is general waste. It consists of heavy metals and acid/alka li rinse water. Flow rate is approximately 100,000 GPD. The equipment shall provide clarification of raw water to meet the following effluent limitations (standards based on 200,000  300,000 GPD process flow): CONTAINMENT; UNITS; DAILY MAXIMUM; AVERAGE : Copper, Total ppd 3.33, 1.67. Chromium, Total ppd 4.62 ,2.85; Iron, Total ppd 33.36, 16.68; Lead, Total ppd 1.15, 0.62; Nickel, Total ppd 2.45, 1.23; Zinc, Total ppd 4.3, 2.47; Silver, Total ppd 0.72, 0.40; Cyanide, Available ppd 0.54, 0.27; Cadmium, T otal ppd 0.50, 0.25; Chromium, Hexavalent ppd 0.50, 0.25; Oil and Grease mg/l 100, 50; Total Suspended Solids mg/l 45, 30. ppd  pounds per day, flow proportional (avg. flow = approx. 250,000 GPD Total). All effluent limitations shall be met 100 % of the time during discharge. Sludge from the two waste streams shall remain separated for d isposal purposes. The clarification process must have a hydraulic retention time of 10 minutes or less. The overall footprint of the clarification process and associated equipment shall be less than or equal to 160 square feet. The chemical costs (floccu lants, coagulants, etc.) associated with the equipment shall be less than or equal to $4,000.00 per month at average market values. Interested companies are requested to provide brochures, literature, published prices lists, and POCs for similar products , not later than 5 days after synopsis appears in the FedBizOpps. Information must be submitted electronically. Information may be faxed to 256-235-4618 or sent to Rita Dingler at dinglerr@anad.army.mil. This is a sources sought  do not request a soli citation.
 
Place of Performance
Address: TACOM - Anniston, Directorate of Contracting ATTN: AMSTA-AN-CT, Building 221, 7 Frankford Avenue Anniston AL
Zip Code: 36201-4199
Country: US
 
Record
SN00703274-W 20041105/041103212041 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.