MODIFICATION
39 -- W914NS-05-Q-9036
- Notice Date
- 12/5/2004
- Notice Type
- Modification
- NAICS
- 333924
— Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
- Contracting Office
- Department of the Army, Project and Contracting Office, Project and Contracting Office, Iraq, Republican Presidential Compound APO, Baghdad, Iraq, AE, 09316
- ZIP Code
- 09316
- Solicitation Number
- W914NS-05-Q-9036
- Response Due
- 12/8/2004
- Archive Date
- 12/23/2004
- Point of Contact
- Robert Mueller, Contracting+Officer, Phone 2399222,
- E-Mail Address
-
robert.mueller@cpa-iq.org
- Description
- Further clarification CLIN 0004 is rough terrain. Quotes due date is extended until 8 Dec. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. (II) Solicitation W914NS-05-Q-9036 is being issued as a request for quote (RFQ). (III) This solicitation incorporates clauses and provisions in effect through the Federal Acquisition Circular 01-24. (IV) This requirement is being synopsized as full and open competition under standard industrial classification code 3537, NAICS Code 333924. The resulting contract will be a Firm Fixed Price type Contract under FAR Part 12 ? Acquisition of Commercial Items. (V) COMMERCIAL ITEM DESCRIPTION: Contractor shall provide a complete and usable end product. Contractor must provide pricing on all items FOB destination for their quotes to be accepted. No alterations, additions, or deletions shall be made unless by prior written approval of the Contracting Officer. All work must meet or exceed acceptable industry standards and codes for the building trades. Items will be listed by line item number, **LINE ITEM 0001** 4 EACH, Truck fork lift 4K w/o cab NSN 3930-01-330-8907 or equal. **LINE ITEM 0002** 16 EACH, truck lift hand NSN 3920-00-242-5764 or equal **LINE ITEM 0003** 4 EACH Truck fork lift electric NSN 3930-01-095-7449 or equal **LINE ITEM 0004** 4 EACH Truck fork lift 4K NSN 3930-01-112-2285 or equal ALL LINE ITEMS ARE FOR NEW ITEMS (VII) Place of delivery / performance: Tadji Military Training Base IRAQ, 38SMC3190208695 The destination is NOT negotiable. ?Shipping shall be included in the unit cost?. All Cost included, Firm-Fixed Price. All duties and tax are the responsibility of the Contractor. Currency Clause (21 November 2007) At the option of the Disbursing Officer, invoices will be paid in either new Iraq Dinars or United State Dollars (USD) to Iraqi Based contractors. If the Disbursing Officer chooses new Iraq Dinars, the US Government will use the official exchange rate obtained from ?The Currency Site? (www.oanda.com/convert/classic) on the date payment is made. The US Government will convert the USD invoice to Dinars and disburse to the contractor this amount in Dinars. Coalition contractors are also encouraged to pay their Iraqi subcontractors and suppliers in local currency whenever they can. (questions on which currency will be used to make payment will not be answered since the decision will not be made until date of payment) 52.252-2 -- Clauses Incorporated by Reference. (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://farsite.hill.af.mil 52.212-4 -- Contract Terms and Conditions -- Commercial Items. (Feb 2002) 52.204-4 - Printed or Copied Double-Sided on Recycled Paper. (Aug 2000) 52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (June 2003) __X_ (24) 52.225-13, Restriction on Certain Foreign Purchases (June 2003)(E.O. 12722, 12724, 13059, 13067, 13121, and 13129). __X_ (29) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (May 1999)(31 U.S.C. 3332). 52.233-4 ? Applicable Law for Breach of Contract Claim. (OCT 2004) 252.225-7041 Correspondence in English. (JUN 1997) The Contractor shall ensure that all contract correspondence that is addressed to the United States Government is submitted in English or with an English translation. 252.232-7008 Assignment of Claims (Overseas). (JUN 1997) 252.233-7001 Choice of Law (Overseas). (OVERSEAS) (JUN 1997) AFARS 5152.225-74-9000(c)(4) Contractors Accompanying the Force This specific clause was published in the Federal Register / Vol 68, No. 229 / Friday, November 28, 2003 / rules and Regulations 66741 Currency Clause (21 November 2007) At the option of the Disbursing Officer, invoices will be paid in either new Iraq Dinars or United State Dollars (USD) to Iraqi Based contractors. If the Disbursing Officer chooses new Iraq Dinars, the US Government will use the official exchange rate obtained from ?The Currency Site? (www.oanda.com/convert/classic) on the date payment is made. The US Government will convert the USD invoice to Dinars and disburse to the contractor this amount in Dinars. Coalition contractors are also encouraged to pay their Iraqi subcontractors and suppliers in local currency whenever they can. MANDATORY SHIPPING DIRECTIONS PCO Logistics: PCO Logistics is required to track equipment, materials and goods coming into Iraq under the Re-building Iraq effort. This tracking and inherent accountability process will assist in assuring that all equipment materials and goods are able to cross the borders and move to final destination with minimal delay and at reduced risk. However, in order to accomplish this mission, maximum cooperation is necessary. Prompt notification and compliance with our information requirements will assist in providing advance notice to the point of entry of all inbound shipments. This process affords coordination in the movement of all convoys which will enable improved monitoring and de-conflicted convoy schedule. Prompt notification also improves security coordination through the operations center. To get started follow the following steps: Step One: Upon contract award the contractor is required to provide the necessary logistical information needed by PCO Logistics. This information can be provided and updated as necessary by going to the PCO website (http://www.rebuilding-iraq.net) and logging in by selecting ?Contractor/Vendor Log In? under the Logistic heading. Initial log in will require the user to request a user name and password. Once the username and password is provided the user can identify and grant access to the other members or subcontractors. Should there be any problems with this process contact the Logistics Movement Coordination Center (LMCC) Watch Officer directly at the following e-mail address: pcolmcc@halliburton.com and the necessary assistance will be provided. If the interim process is still in place the contractor will find four (4) forms listed and available under the logistics heading (Logistics Information Requirements Form, Reconstruction Levy Exemption Form, Cargo Plaques and Logistical Support Request). Those forms should be individually completed and, with the exception of the cargo plaque, sent electronically to the above mentioned e-mail address for the LMCC. The first form submitted will be the Logistics Information Requirements Form. The Logistics Information Requirements Form should be completed upon award of contract and updated as necessary. All updates and changes to this form should be sent to the same e-mail address as the original form. Additional contact information is available on the website mentioned above. Always reference the contract number. Step Two: CPA 1-47 CUSTOMS LEVY EXEMPTION AND SHIPMENT REQUIREMENTS FOR RECONSTRUCTION PROJECTS UNDER PROJECT AND CONTRACTING OFFICE (PCO) Effective 15 April 2004 Tariff Regulations pursuant to CPA Orders #54, as amended by Order #70 (Orders #54 and #70 are posted on the website), require commercial importations into Iraq to pay a 5% levy except for food, books, medicine, medical equipment, clothes and oil. Additional exemptions include NGO?s, International Organizations, Reconstruction Projects under PCO, and single exempt donations. Items shipped under this contract are exempt from this ?Levy? provided a completed Reconstruction Levy Exemption Form is attached and included with each invoice and packing slip. The contractor is required to fill out the Reconstruction Levy Exemption Form and attach the duty free form to each shipment of goods under this contract that crosses the border into Iraq in order to qualify for the exemption. The contractor must submit one copy of the completed duty free form and a copy of the first page of the primary contract, for customs verification, to the contracting officer and the PCO Logistics Office at pcocustoms@halliburton.com) 72 hours prior to the planned arrival date at the Iraq point of entry. Step Three: The items being acquired are for Iraqi Reconstruction and as per the ?Packing and Marking Instructions? of this contract, and shall be Packaged and Marked accordingly. Additionally, a Cargo Plaque is available from the website at http://www.rebuilding-iraq.net under the logistics tab located at the top of the page. There is a memorandum posted that explains how to complete the plaques. There are three plaques, one is for shipments arriving into Baghdad International Airport, one is for shipments arriving into the Port of Umm Qasr, and the third one is for all other shipments. The use of these plaques will ensure they are properly identified as PCO shipments and will reduce risk of loss or pilferage. Each shipment must have a cargo plaque affixed to all sides of each container, pallet, or package. Step Four: If this contract has the shipment bound for a PCO warehouse location and will require PCO Logistics to assist in the shipment from the point of entry into Iraq or material handling equipment support at the warehouse, a Logistical Support Request (LSR) must be completed and submitted 48 hours prior to expected movement of the shipment or its arrival at the point of entry. The LSR can be found at the above mentioned web site under the logistics tab. It is the contractor?s responsibility to provide all the requested information mentioned above as well as using the identified cargo plaques in sufficient time to allow for required delivery. Failure to comply with these instructions may result in a delay of the goods and materials being shipped from arriving at their final destination. Delays resulting from failure to follow the above steps may be assigned as the contractor?s responsibility. HOSTAGE REPORTING The security and safety of our contractors are paramount to the success of Project and Contracting Office?s (PCO) Iraq reconstruction mission. To insure rapid dissemination of critical hostage information the following procedures are implemented immediately. 1. All prime contracts will be modified to incorporate a Hostage Report Notification clause. This clause requirement will also flow down to all subcontracting tiers of the prime?s contract. 2. Effective immediately, procedures for kidnapping or attempted kidnapping reporting are: 3. Kidnapping or attempted kidnapping in progress, Call: a. Al-Anbar (1st MEF): 427-232; 428-914 b. Baghdad (1st Cav): IRAQNA: 0790-173-7723 / 7724 / 7725 / 7726 / 7727 (English/Iraqi linguists) 0790-192-4719 MCI: 1-914-360-5690 Thuraya: +8821-621-157-354 Thuraya: c. Basrah: 317 428 (English/Iraqi linguists) 620 335 524 876 Mobile: 040 317 428 040 620 335 040 524 876 InMarSat: 00882621157156 Thuraya +882621157156 d . Hillah: InMarSat: 870-764-061-233 Thuraya: +8821-621-157-107 GSM: 964 07801-083540 DNVT: (302) 631 2110 DSN : (318) 250 1015 e. Mosul: Thuraya:- 008821621157620 Inmarsat:- 00870764061237 GSM Asiacell:- 07701640977 f. Ramadi Thuraya: 0088 2621157472 Thuraya: +882621157472 g. Tikrit: DNVT 318-846-1028 DSN 846-1028 Local 822-890 (works only sporadically) Inmarsat 00 873 763 603 119 00 873 763 603 120 Thuraya 8821 621 157 543 If you cannot get through on the above numbers, call the: Reconstruction Ops Center: Thuraya: +88-216-2170-7751 +88-216-2170-9043 +88-216-2115-7354 VoIP: 281-669-2375 (Dial as a stateside number) Iraqna: 0790-192-4108 MCI: 914-360-0619 Land line: 703-544-1301/ 1302/ 1303/ 1304/ 1305 (effective after Nov. 1, 2004) 4. Post Kidnapping : As soon as possible after a kidnapping or attempted kidnapping, but only when safe to do so: a. Contact: i. Reconstruction Operations Center: roc@aegisiraq.com ii. Or Reconstruction Operations Center: phone #s above iii. Email, copy to: PCO Contracting Office: william.mcelven@cpa-iq.org iv. Email, copy to your Prime contractor b. Initial information to be provided: i. Name, phone number and email of person reporting the incident ii. Date of incident iii. Time of incident iv. Location of incident (as specific as possible) v. Brief description of what happened vi. Description of people involved vii. Description of vehicle involved viii. Hostage name/nationality ix. Contractor Name Name, phone number and email address of person who will take follow-up questions from embassy, law enforcement representatives. PROJECTED IRAQI EMPLOYMENT: Collecting & Reporting Employment Statistics The purpose of this clause is to collect data on the projected number of Iraqis employed for the term of the contract. Offerors are required to identify in the space provided below the total projected number of Iraqi?s that will be directly employed in the performance of this contract. ?Employment is the total number of Iraqi persons expected to be on the payroll (contractors, subcontractors, sub-subcontractors) employed full or part time who received pay for any part of the term of the contract. Temporary and intermittent employees are included, as are any workers who are on paid sick leave, on paid holiday, R&R leave or who work during only part of the pay period.? Enter into spaces provided in item #1. Next when totaled enter in the spaces provided in item #2 what is the average number employed throughout the term of the contract. Item #3 An ?Iraqi Based? is a company (including a subsidiary company) whose principal place of business is located within Iraq. 1. Total Iraqi (Iraqi Residents) Employed: Iraqi: Men_____. Iraqi: Females_____. Total: ________. 2. Average Iraqi?s (Iraqi Residents) Employed: Iraqi: Men_____. Iraqi: Females_____. Total: ________. 3. Is your company an ?Iraqi Based? company? Yes___No___. If no, what country is your company registered/incorporated: _____________________. These numbers will only be used for employment statistics and not as a factor for award.
- Place of Performance
- Address: Tadji Military Training Base
- Country: Iraq
- Country: Iraq
- Record
- SN00717094-W 20041207/041205211606 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |