Y -- Melter Refractory Installation at the Waste treatment Plant Project, DOE Hanford Site, Richland, WA

Notice Date
12/8/2004
 
Notice Type
Solicitation Notice
 
NAICS
238140 — Masonry Contractors
 
Contracting Office
Department of Energy, Bechtel National, Inc. (DOE Contractor), Bechtel National Inc., 2435 Stevens Center Place, Richland, WA, 99352
 
ZIP Code
99352
 
Solicitation Number
24590-CM-SRA-NR00-00001
 
Response Due
12/31/2004
 
Archive Date
1/15/2005
 
Description
The combining of waste and glass additives takes place in a rectangular steel box called a melter where the temperatures reach 1100?C. The Low Activity Waste (LAW) melters are approximately 12? wide x 25? long x 16? high and the High Level Waste (HLW) melters are approximately 6? wide x 8? long x 7? high. The two LAW melters and two HLW melters will be simultaneously assembled on the site prior to commissioning. During the assembly of each melter, refractory is added. This specialized brick (some pieces exceeding 1500 lbs) acts as the containment for the molten glass. During Melter assembly, the refractory subcontractor will be responsible for the rigging and installation of fused-cast refractory (government furnished equipment) and the back-up layers of refractory (purchased by the subcontractor), and the design and construction of all shoring and framework, patterns and molds needed to place the floor and fixed wall castables for all four melters. Subcontractor will be required to perform bake-out of some of the castable refractory. Subcontractor will provide qualified personnel and equipment to handle and install the refractory in accordance with Project drawings and specifications. Subcontractor will procure materials such as cribbing, tyvek tape and sheeting, insulating paper, board, and adhesive, and castable refractory materials (e.g. Alfrax 66, Kaolite 2500 LI, and Versaflow 57A). Prior to the start of work, Subcontractor will be required to submit (1) procedures describing refractory installation and rigging methods and (2) personnel qualifications for work to be performed. It is estimated that work will be performed over a two-year period. EQUIPMENT AND MATERIALS REQUIRED (1) Forklift and operator (2) Back-up refractory (Zirmul Alumina-Zirconia-Silica [AZS]) (3) Rigging equipment for the refractory (crane & operator provided by the Project) (4) Material for the shoring and framework (5) Materials as identified above (6) Castable Refractory mixing and finishing equipment. STANDARDS API-RP936, Refractory Installation Quality Control Guidelines - Inspection and Testing Monolithic Refractory Linings and Materials, 2nd edition, February 2004 CONTACT Bechtel National, Inc. 2435 Stevens Center Place Richland, WA 99352 Attn: Ken Williams Mailstop: MS10-A Email: klwillia@bechtel.com
 
Place of Performance
Address: 2435 Stevens Center Place, Richland, WA
Zip Code: 99352
Country: USA
 
Record
SN00718440-W 20041210/041208211702 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.