Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 15, 2004 FBO #1115
MODIFICATION

Y -- Southern Maine, ME P&DC 512582-05-A-0001

Notice Date
12/13/2004
 
Notice Type
Modification
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
United States Postal Service, Facilities Purchasing, Major Facilities Purchasing (HQ), 4301 Wilson Blvd Ste 300, Arlington, VA, 22203-1840
 
ZIP Code
22203-1840
 
Solicitation Number
512582-05-A-0001
 
Response Due
1/5/2005
 
Archive Date
1/20/2005
 
Point of Contact
Bill Powell, Purchasing Specialist, Phone (703) 526-2764, Fax (703) 526-2747, - Rob Luning, Purchasing Specialist, Phone 703-526-2763, Fax 703-526-2747,
 
E-Mail Address
bpowell1@email.usps.gov, rluning@usps.gov
 
Description
Amendment A02 Proposal Due date has been revised to January 05, 2005 1:00pm. Revised list of contacts for prequalified firms for this project: replace sheet in attachment 15 with revised prequalified James N Gray Co, Dennis Ellington, Program Manager, 10 Quality St, Lexington, KY 40507-1450 office phone 859-281-9325, Fax 859-252-5300, email dellingt@jngray.com or Michael Rach, Director of Planning & Design/Federal Programs, office phone 859-281-9248, email mrach@jngray.com. Hensel-Phelps has withdrawn from prequalified list of contractors. Cianbro and Korte have partnered on this project and are acting as one entity - Cianbro Corporation, Peter G Vigue, President, Hunnewell Square PO Box 1000, Pittsfield ME, 207-487-4192, fax 207-487-3861, pvigue@cianbro.com, Korte Construction Company, dba The Korte Company, Michael L Tubb, Sr Vice President, 7995 East Prentice Avenue Suite 303, Greenwood Village, CO 80111, 618-654-8611, miket@korteco.com Contract - • Replace coversheet with revised coversheets optional provisions/clauses revised and proposal due date revised. • Revise Attachment #1 item#1 Fixed fee for A-E Services Services for Design including overhead and profit • Page three of contract document revise goals from 6% to .6% page 3 of contract to be replaced. Responses to Questions - • Korte questions dated December 2, 2004 Attachment 01 – • Replace existing Section 01110db_Summary of Work with attached Section 01110_Summary of Work Southern Maine 12-07-04.pdf • Replace existing Section 01500a_1Nov04 with attached section 01500a_field office-revised 12-07-04.pdf Attachment 09 – • Delete first page of Contractor’s Release Document that says Attachment 5. Attachment 13 – • In the Management plan replace use of form 255 with form 330 per revised management plan replace Management Plan in attachment 13 Attachment 15 – • Revised list of pre-qualified contractors Attachment 16 – • Replace sections 2 through 9 in existing document Southern Maine-FDS-10-20-04 with attached document Southern Maine-FDS-12-07-04.pdf. • Add traffic study 10-25-04.pdf Attachment 28 – • Replace list of efi contractors with attached document approved mechanization contractors.pdf The following DRAWINGS have been revised – All changes are marked. C1.02 Site Plan, replace existing drawing with attached drawings. C1.03 Pavement & Signage Plan, replace existing drawing with attached drawings. C1.04 Grading and Drainage Plan, replace existing drawing with attached drawings. C1.05 Utility Plan, replace existing drawing with attached drawings. C2.06 Profiles, replace existing drawing with attached drawings. M6.01 Mechanical Schedules, replace existing drawing with attached drawings. P1.01 Plumbing Floor Plan, replace existing drawing with attached drawings. E1.01 Electrical Power Plan (First Floor), replace existing drawings with attached drawings. E1.03 CIS, CCTV Security Camera & Access Control Systems Plan (First Floor), replace existing drawings with attached drawings. E1.05 Structured Wiring System Plan (Penthouse) In addition to the data drops shown on the drawings please provide the following: South East Mechanical Penthouse Fan Room 2006: Add one (1) standard TO (telecommunications outlet) in this room on the north wall along column line M.3. Locate the TO adjacent to the stairwell door, inside the room and beyond the door swing. South West Mechanical Penthouse Fan Room 2007: Add one (1) standard TO (telecommunications outlet) in this room on the north wall along column lines B and 2. Locate the TO adjacent to the stairwell door, inside the room. OSL-REVC-O10 Updated OSL in area of O10 only NOTE: THIS NOTICE WAS NOT POSTED TO WWW.FEDBIZOPPS.GOV ON THE DATE INDICATED IN THE NOTICE ITSELF (13-DEC-2004); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.eps.gov/spg/USPS/FP/MFP/512582-05-A-0001/listing.html)
 
Place of Performance
Address: Southern Maine, ME Scarborough
 
Record
SN00720580-F 20041215/041213211918 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.