- Description
- This project includes constructing erosion control structures to prevent erosion and loss of road. The project consists, in part, of 10 erosion control structures, five structures at each of two sites. Two primary control structures at each site shall be comprised primarily of micro-pile (excess rail steel) and rock fall netting as the reinforcing structure. Two secondary control structures at each site shall consist primarily of rock fall netting anchored with soil/rock anchors. The remaining tertiary erosion control structure at each site shall consist of soil nails (#11 rebar pins) driven perpendicular to the stream channel. Approximately 1,700 cubic yards of material must be moved along the road prism and stream channel to enable the installation of erosion control structures. An estimated 600 cubic yards of material will have to be hauled from Goosberry Hollow and placed at Bridge Hollow. The haul distance is approximately 1.4 miles. The contractor will be responsible for all labor, materials, supplies, equipment, transportation and incidentals to complete the entire project. The project is located on the Custer National Forest, Beartooth Ranger District. The Goosberry Hollow low water crossing is located in T8S, R27E, S21. Bridge Hollow low water crossing is located in T8S, R27E, S28, located in Pryor Mountains near Bridger, Montana. The estimated start date for this project is May 16, 2005 and will have 60 calendar days for completion of all work included. The price range is between $100,000 - $250,000. DUE TO GROUND CONDITIONS AND LIMITED ACCESSIBILITY TO THE PROJECT SITE A PREBID TOUR WILL NOT BE OFFERED. The IFB should be available on or about March 21, 2005 and closing date for receipt of bids will be 2:00PM on April 21, 2005.
- Record
- SN00747269-W 20050210/050208211719 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |