Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 20, 2005 FBO #1182
SPECIAL NOTICE

A -- Global Positioning System Control Segment Development Request for Information

Notice Date
2/18/2005
 
Notice Type
Special Notice
 
NAICS
541710 — Research and Development in the Physical, Engineering, and Life Sciences
 
Contracting Office
Department of the Air Force, Air Force Space Command, SMC - Space and Missiles System Center, 2420 Vela Way, Suite 1467, El Segundo, CA, 90245-4659
 
ZIP Code
90245-4659
 
Solicitation Number
Reference-Number-GPS-CS-28
 
Response Due
3/11/2005
 
Archive Date
3/26/2005
 
Description
The Navstar Global Positioning System (GPS) Joint Program Office (JPO) is considering alternative strategies for acquisition of the next generation GPS space and control segments. The new acquisition strategy under consideration will compete the next generation space and control segments separately. The overall systems integration (SI) function may be performed by one of the segments, by a stand-alone SI contract, or by the government. Under this strategy, the current control segment development will stop after delivery of Architecture Evolution Plan (AEP) Version 5.5 and be shifted to a new development referred to as OCX. OCX will be acquired in an evolutionary fashion that will incrementally deliver capabilities to the field and require growth and flexibility to meet military and civil needs for the next 30 years. Initially, OCX will focus on early fielding of control segment support for the GPS modernization signals (L2C, L5, and M-code) and the first increment of new space segment development, GPS Block IIIA. Nominally, the OCX will provide all control segment support for GPS Block IIR, GPS Block IIR-M, GPS Block IIF and GPS Block III, and facilitate the addition of future satellite blocks with new capabilities (new signals, Navwar capabilities, additional payloads). Alternative OCX acquisition strategies also require investigation. For instance, early OCX increments could be augmented by AEP to support command and control of the Block II satellites. SYSTEM DESCRIPTION: The current GPS consists of three major segments. These are: a space segment (SS), a control segment (CS), and a user segment (US). GPS is a dual use, military and civil system whose primary mission is to provide Position, Navigation and Time (PNT) services. The Nuclear Detonation (NUDET) Detection System (NDS) is carried as a secondary payload. Future additional payloads may also include the Distress Alerting Satellite System (DASS) and others. DASS relays search and rescue data and is planned as a component of the international Cospas-Sarsat search and rescue system. The key capabilities for the future GPS system include high availability of military accuracy in a jammed environment, increased time transfer accuracy, increased position accuracy, higher system integrity, backward compatibility, survivability, L1 signal common with Galileo, and interoperability with the Global Information Grid. CONTROL SEGMENT (CS) DESCRIPTION: The CS provides command, control, and maintenance services to the space segment and supports both the PNT and the NDS missions. The current operational CS is also known as the "legacy Control Segment" and is composed of a primary Master Control Station (MCS), a Back-Up MCS (BMCS) located at the contractor's facility, six dedicated Monitor Stations and five dedicated Ground Antennas that are located at remote sites. The CS that is currently in development consists of the following elements: an AEP-based Operational Control Segment (OCS), a Launch Early Orbit Anomaly and Disposal Operations (LADO) capability, a GPS System Simulator (GSS), an AEP-based Alternate Master Control Station (AMCS) and an Integrated Mission Operations Support Center (IMOSC). AEP versions 5.2/5.5 are currently under development and expected to go operational in CY06/08. LADO is expected to go operational in CY06. The OCX may be divided into subsystems supporting the following functions: Telemetry, Tracking, and Commanding (TT&C) that is common to all space vehicles (SVs), SV-specific TT&C, mission planning, and the navigation mission. The OCX will be expected to support Navigation Warfare (Navwar) Mission Planning and to have connectivity with a classified facility from which Navwar, Selective Availability/Anti-Spoofing Module (SAASM) and other sensitive capabilities can be planned and executed. OCX capabilities may be incrementally fielded, but the OCX must evolve to support full GPS III capability. Notionally, the first OCX increment should: 1) expand monitoring from P(Y) only to all navigation signals; 2) provide for generation of the modernized navigation messages; 3) account for aviation safety certification requirements; 4) provide TT&C support for GPS IIIA; and 5) provide a level of automation for mission planning. REQUEST FOR INFORMATION: The purpose of this announcement is to assist the government in identifying interested potential offerors or teams capable of achieving the OCX program objectives with acceptable risks and costs. This announcement also seeks feedback on: 1) how best to develop and deliver the OCX control segment capability; 2) whether to split the OCX functions (TT&C, Navigation Mission, Mission Planning) into several separate acquisitions; 3) alternative operations and maintenance concepts using different mixes of government and contractor employees; and 4) how to best address system integration responsibilities. Interested and potential offerors are requested to submit a response package that provides the following information: 1) experience and summary of capabilities in developing space segments and control segments including specific experience with certifications (system security/information assurance, net ready/interoperability, and aviation safety); 2) experience as a system integrator; 3) input on how to allocate the roles and responsibilities between potential space and control segment contractors; 4) input on how the system integrator's roles and responsibilities should be defined; 5) input on the advantages and disadvantages associated with further splitting and executing of the control segment functions (TT&C, Navigation Mission, and Mission Planning) under separate contracts and suggestions for how to split it; 6) interest in proposing on any or all of the control, or system integrator responsibilities if submitted under separate solicitations (to include the level of expertise the company would provide for each responsibility); 7) recommendation for the most effective (cost, schedule, performance, risk) transition path from the AEP control segment to full OCX capability; and 8) an estimated schedule to incrementally develop and deliver the OCX capabilities, in Gantt-chart format (timelines should be independent of program start date and reflect contractor?s past ground segment development experiences -- reference programs and complexity). The Government requests responses by 11 March 2005 to support ongoing acquisition planning. Responses should be submitted via email in electronic form in MS Word 2000 or newer format or PDF format to carol.laechelt@losangeles.af.mil with a follow-up signature hard copy of the submission to SMC/GPK, Attn: Carol Laechelt, 2420 Vela Way, Suite 1866, El Segundo, CA 90245-4659. All responses must conform to 8.5 x 11-inch pages, with font no smaller than 12-point, with a maximum of 20 pages. The Gantt chart is not included in the page limitation. For access to the GPS III Bidder's Library, click "New Users Register Here" at https://gps.losangeles.af.mil/gpslibrary/, or contact Mr. John Pezan at newaccount@losangeles.af.mil. If respondents wish to include proprietary data, they must adhere to DFAR 227.7103-10 Contractor Identification and Marking of Technical Data to be furnished with restrictive markings. This request is for planning purposes only and does not constitute an Invitation for Bids (IFB), a Request for Proposals (RFP), a Solicitation, a Request for Quotes (RFQ), or an indication the Government will contract for the items contained in the RFI. The Government does not reimburse respondents for any cost associated with submission of the information being requested or reimburse expenses incurred to interested parties for responses to this RFI.
 
Place of Performance
Address: Contractor's facility
 
Record
SN00754955-W 20050220/050218212902 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.