SOLICITATION NOTICE
Y -- LIGHTS, SIGN AND MARQUEE FOR AWNING, PROJECT #FWJH142554
- Notice Date
- 2/22/2005
- Notice Type
- Solicitation Notice
- NAICS
- 238990
— All Other Specialty Trade Contractors
- Contracting Office
- 147 FW/LGC, BuildingG 1383, Ellington Field, 14657 Sneider Street, Houston, TX 77034-5586
- ZIP Code
- 77034-5586
- Solicitation Number
- W912L105R5009
- Response Due
- 3/8/2005
- Archive Date
- 5/7/2005
- Small Business Set-Aside
- Total Small Business
- Description
- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a complete written solicitation will be provided upon request by email to: debra.mcgowan@txelli.ang.af.mil. PROJECT: TO PROVIDE ALL PARTS, MATERIALS, LABOR, TRANSPORTATION AND EQUIPMENT NECESSARY TO PROVIDE LIGHTS, SIGN AND MARQUEE FOR AWNING ON EAST SIDE OF BUILDING 1193 PER STATEMENT OF WORK AS FOLLOWS: Lighting, Signage and Marquee at Bldg. 1193 Awning Project Number: FWJH142554 Statement of Work Provide cost proposal to furnish all labor, materials, equipment and supervision necessary to accomplish the following items of work: Power for Lighting and Marquee Install three separate circuit breakers at electrical power panel located in mechanical room of building 1193 (mechanical room is approximately 105 LF from the canopy exit). Pull three separate circuits from mechanical room to feed new canopy lights, marq uee and marquee accent lights. Conduit for new circuits can be ran on the roof of the building. Contractor will be responsible for all necessary roof and wall penetrations, and warranty of the roof against leaking due to the new penetrations. Tremco, In c. (281-993-2589) must be used for roof repair at penetrations to maintain overall roof warranty. Installation of new circuits and conduit must be in accordance with NEC requirements. Install Lighting at Canopy Furnish and install EMT Conduit and wiring along the centerline of the canopy from the building to the end of the canopy. Install 70 Watt metal halide canopy lights (VN8-70MQH or equal) at 15 on center (at post locations) along the length of the canopy ( 9-total). Lights are to be die-cast aluminum housing in brushed aluminum finish. Lights should be sensor controlled, with a separate switch over-ride to turn the lights on or off. Install Lighting at Marquee Furnish and install two fixtures and wiring for lighting at the Marquee. Underground conduit from the building to the marquee has been installed by others. Fixtures are to be fluorescent outdoor landscape flood lighting fixtures, bronze aluminum with a c anopy (similar to Focus Industries #FOC FFL-57-120V). Sensor controlled, with a separate over-ride switch to turn lights on or off. Install Marquee Base Furnish and install base to hold Marquee. The foundation for the base is to be constructed of 3000 psi concrete with #5 rebar at 12 on center and #3 stirrups over 6 of crushed and compacted limestone base materials. The marquee base is to be constructe d of 8 concrete masonry units, reinforced with #5 bars and fully grouted. The base shall be finished with 1 stucco over the concrete masonry units. Design dimensions for the base are as per the attached drawing dated 07-Sep-04, with details equal to th ose shown on drawing dated 16-Jan-02, but adjusted to fit the size of this marquee. Provide and install 6 cast bronze aluminum lettering on the base of the marquee: 147th Fighter Wing. Lettering font is to match base standard building lettering. Lighting, Signage and Marquee at Bldg. 1193 Awning Project Number: FWJH142554 Statement of Work, continued Furnish and Install Marquee Furnish and install Marquee: Displays 4 lines of 4 Characters or 3 lines of 6 Characters or 2 lines of 9 or 1 line of 12 or 19 Characters plus graphics, animations and time/temperature information. Marquee is to be eSign Systems model number e464-4, single-sided, or equal. Installation is to include all necessary wiring and software needed to make the marquee fully operational. Underground conduit from the building to the marquee has been installed by others. Marquee is to include the wireless tran smission option, along with manufacturer services to install software and provide initial training. Signage for End of Canopy Furnish and install a painted aluminum Shield sign, overall dimensions 2 x 2, with colors and graphic per the included .gif file. Cut aluminum in the shape of the shield. Furnish additional welded aluminum bracing for mounting the shield sign as necess ary to insure proper bracing for the sign. Paint additional lettering on the end of the canvas awning cover as shown on the attached drawing. Lettering and line coloring is to match the color of the canopy posts. Lettering style is to match the base sta ndard. BASE STANDARDS REFERENCED/COPIES PROVIDED UPON REQUEST WITH COMPLETE SOLICITATION: 01001-00 - General Requirements 01019-00 - Contract Considerations 01039-00 - Coordination and Meetings 01105-00 - Haz Mat Procedures 01300-00 Submittals 01310-00 - Progress Schedules 01400-00 - Quality Control 01420-00 - Environmental Protection 01430-00 - O&M Data 01500-00 - Construction Facilities & Temp Controls 01600-00 - Materials & Equipment 01640-00 - Manufacturer Services 01650-00 - Starting of Systems 01700-00 - Contract Closeout 01731-00 - Cutting & Patching 16050-Basic Electrical Materials & Methods 16120-Conductors 16130-Raceways & Boxes 16140-Wiring Devices SITE VISIT SCHEDULED 1 MARCH 2005, 3:00PM. BLDG 1256, TEXAS AIR NATIONAL GUARD, 14657 SNEIDER STREET, HOUSTON, TX 77034-5586. RSVP TO debra.mcgowan@txelli.ang.af.mil AND claudette.manning@txelli.ang.af.mil WITH LIST OF ATTENDEES. APPLICABLE WAGE RATES: GENERAL DECISION TX20030010 12/24/2004 TX10 CLAUSES ATTACHED: 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the a ppropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): http://farsite.hill.af.mil (End of provision 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.204-3 TAXPAYER IDENTIFICATION (OCT 1998) 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (MAY 2004) - ALTERNATE I (APR 2002) 52.228-10 VEHICULAR AND GENERAL PUBLIC LIABILITY INSURANCE (APR 1984) (a) The Contractor, at the Contractor's expense, agrees to maintain, during the continuance of this contract, vehicular liability and general public liability insurance with limits of liability for (1) bodily injury of not less than TEXAS MINIMUM REQUIREME NTS for each person and for each occurrence, and (2) property damage of not less than $TEXAS MINIMUM REQUIREMENTS for each accident and in the aggregate. (b) The Contractor also agrees to maintain workers' compensation and other legally required insurance with respect to the Contractor's own employees and agents. 52.219-6 Notice Of Total Small Business Set-Aside JUN 2003 52.222-3 Convict Labor JUN 2003 52.222-6 Davis Bacon Act FEB 1995 52.222-8 Payrolls and Basic Records FEB 1988 52.222-9 Apprentices and Trainees FEB 1988 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity APR 2002 52.222-27 Affirmative Action Compliance Requirements for Construction FEB 1999 52.222-35 Equ al Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans DEC 2001 52.222-36 Affirmative Action For Workers With Disabilities JUN 1998 52.222-37 Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, and Other Eligible Veterans DEC 2001 52.227-1 Authorization and Consent JUL 1995 52.228-11 Pledges Of Assets FEB 1992 52.228-14 Irrevocable Letter of Credit DEC 1999 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-17 Interest JUN 1996 52.232-27 Prompt Payment for Construction Contracts OCT 2003 52.233-1 Disputes JUL 2002 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements APR 1984 52.236-10 Operations and Storage Areas APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.243-5 Changes and Changed Conditions APR 1984 52.246-1 Contractor Inspection Requirements APR 1984 52.246-12 Inspection of Construction AUG 1996 52.247-34 F.O.B. Destination NOV 1991 52.249-1 Termination For Convenience Of The Government (Fixed Price) (Short Form) APR 1984 52.249-10 Default (Fixed-Price Construction) APR 1984 252.204-7004 Alt A Required Central Contractor Registration (52.204-7) Alternate A NOV 2003 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later tha n 30 calendar days. The time stated for completion shall include final cleanup of the premises. (End of clause) 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997) 52.225-9 BUY AMERICAN ACTCONSTRUCTION MATERIALS (JAN 2005) 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid. (b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of cred it, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to t he successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.- (c) The amount of the bid guarantee shall be 20 percent of the bid price or $25,000, whichever is less.- (d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contr acting Officer may terminate the contract for default.- (e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference. (End of clause) 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for-- 1 MARCH 2005, 3:00PM (c) Participants will meet at 147 CES, BLDG 1256, 14657 SNEIDER STREET, HOUSTON, TX 77034-5586 EMAIL LIST OF PARTICIPANTS TO debra.mcgowan@txelli.ang.af.mil AT LEAST ONE DAY PRIOR TO MEETING. (End of provision) 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed elect ronically at this/these address(es): http:farsite.hill.af.mil (End of clause)
- Place of Performance
- Address: 147 FW/LGC Building 1258, Ellington Field, 14657 Sneider Street Houston TX
- Zip Code: 77034-5586
- Country: US
- Zip Code: 77034-5586
- Record
- SN00755990-W 20050224/050222211929 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |