MODIFICATION
16 -- Skid Tube Assembly, Landing Gear
- Notice Date
- 5/3/2005
- Notice Type
- Modification
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Defense Logistics Agency, Logistics Operations, Defense Supply Center Richmond, 8000 Jefferson Davis Highway, Richmond, VA, 23297-5000
- ZIP Code
- 23297-5000
- Solicitation Number
- SP0407-05-R-2714
- Response Due
- 6/17/2005
- Archive Date
- 7/2/2005
- Description
- RD05035002, NSN 1620-00-795-0678, Skid Tube Assembly, Landing Gear, IAW PN #205-050-152-59/DWG #81996 AV205-050-152. Contractor First Article and Government Fit Verification apply. This is a proposed firm fixed priced contract with one base and four option years. FOB destination, inspection/acceptance origin, IAW Q007. Requested delivery for production quantity is 150 DARO. The estimated annual demand quantity is 388 EA for the base year and each option year. Surge & Sustainment is required. The possible stock shipment locations are Richmond, VA, New Cumberland, PA. and Tracy, CA. Specifications, plans and drawings relating to the procurement described are not available and cannot be furnished by the Government. The proposed long-term contract is unrestricted, not a set-aside. The final contract award decision may be based upon a combination of price, past performance, and other evaluation factors as described in the solicitation. A copy of the solicitation will be available via DLA Procurement Gateway at http://progate.daps.mil/home or http://12.3.216.20/home on the issue date cited on the RFP. From the gateway homepage, select document format (PDF). To download and view these documents you will need the latest version of Adobe Acrobat Reader. This software is available free at http://www.adobe.com. A paper copy of this solicitation will not be available to requestors. The solicitation will be available for issue on or about May 17, 2005 and close on or about June 17, 2005. These dates are subject to change****ELECTRONIC QUOTES ARE NOT ACCEPTABLE FOR THIS SOLICITATION. The solicitation package must be completed in its entirety prior to submission. Incomplete submission of the solicitation package may be deemed unacceptable and may result in disqualification of proposal. The requirement is changed from a small business-set aside to unrestricted.
- Record
- SN00799700-W 20050505/050503211651 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |